Extracted from MTO on 01-Jul-2025 00:31,
last changed 29-Jun-2025.
# | Ver | Text | Start | End |
1 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 06-Jan-2025 | |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 18-Jul-2018 | 05-Jan-2025 |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 18-Jul-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 18-Jul-2018 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 18-Jul-2018 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 18-Jul-2018 | |
6 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 18-Jul-2018 | |
7 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 06-Jan-2025 | |
8 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 06-Jan-2025 | |
9 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 06-Jan-2025 | |
10 | 1 | Scrape and detecting and dry blowing operations are to be progressively rehabilitated so that no more than two hectares will be open (meaning disturbed without rehabilitation works being completed) at any one time. | 06-Jan-2025 | |
Cond # | Ver | Text | Start | End |
1 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 06-Jan-2025 | |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 18-Jul-2018 | 05-Jan-2025 |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 18-Jul-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 18-Jul-2018 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 18-Jul-2018 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 18-Jul-2018 | |
6 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 18-Jul-2018 | |
7 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 06-Jan-2025 | |
8 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 06-Jan-2025 | |
9 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 06-Jan-2025 | |
10 | 1 | Scrape and detecting and dry blowing operations are to be progressively rehabilitated so that no more than two hectares will be open (meaning disturbed without rehabilitation works being completed) at any one time. | 06-Jan-2025 | |
Type | Number | Details |
Application to Amend | 532591 | Lodged:10:51 12 June 2018Amending:Address (Including DTC Details)From:Principal Residence : BROWN, Michael John, 10 BUTLER STREET, PICCADILLY, WA, 6430 and DTC :BROWN, Michael John, ANTHONY PATERSON STEHN, 375 EGAN STREET, KALGOORLIE, WA, 6430, xxxxxx@iinet.net.auTo:Principal Residence : BROWN, Michael John, PO BOX 10938, KALGOORLIE, WA, 6433 and DTC :BROWN, Michael John, MICHAEL JOHN BROWN, PO BOX 10938, KALGOORLIE, WA, 6433REJECTED:10:51 12 June 2018 |
Application to Amend | 533583 | Lodged:14:40 22 June 2018Amending:NameFrom:BROWN, Michael JohnTo:BROWN, Michael John BarryAmending:Address (Including DTC Details)From:Principal Residence : BROWN, Michael John, 10 BUTLER STREET, PICCADILLY, WA, 6430 and DTC :BROWN, Michael John, ANTHONY PATERSON STEHN, 375 EGAN STREET, KALGOORLIE, WA, 6430, xxxxxx@iinet.net.auTo:Principal Residence : BROWN, Michael John Barry, PO BOX 10938, KALGOORLIE PO, WA, 6433 and DTC :BROWN, Michael John Barry, MICHAEL JOHN BARRY BROWN, PO BOX 10938, KALGOORLIE PO, WA, 6433RECORDED:14:40 22 June 2018 |
Amalgamation | 552843 | Lodged:15:00 03 May 2019Amalgamating:Whole of P 09/477Situated within:External boundaries of E 09/2290Granted 08/10/2019 in respect to P 09/477 |
Application to Amend | 662912 | Lodged:08:55:14 09 November 2022Amending:Address (Including DTC Details)From:Principal Residence : STEHN, Anthony Paterson, 375 EGAN STREET, KALGOORLIE, WA, 6430 and DTC :STEHN, Anthony Paterson, ANTHONY PATERSON STEHN, 375 EGAN STREET, KALGOORLIE, WA, 6430, xxxxxx@iinet.net.auTo:Principal Residence : STEHN, Anthony Paterson, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997 and DTC :STEHN, Anthony Paterson, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997RECORDED:08:55:14 09 November 2022 |
Application to Amend | 662914 | Lodged:08:55:14 09 November 2022Amending:Address (Including DTC Details)From:Principal Residence : BROWN, Michael John Barry, PO BOX 10938, KALGOORLIE PO, WA, 6433 and DTC :BROWN, Michael John Barry, MICHAEL JOHN BARRY BROWN, PO BOX 10938, KALGOORLIE PO, WA, 6433To:Principal Residence : BROWN, Michael John Barry, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997 and DTC :BROWN, Michael John Barry, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997RECORDED:08:55:14 09 November 2022 |
Extension / Renewal of Term | 680438 | Lodged:10:22:12 07 July 2023Applied For Period:5 YearsRECORDED:10:22:12 07 July 2023GRANTED:24 October 2023Granted Period:5 YearsTerm Extended To:17/07/2028 |
Partial Surrender - Voluntary | 702110 | Lodged:14:29 23 April 2024Surrendered Blocks:HAMERSLEY RANGE 3261 l, m, n, s, t, x, y, z
HAMERSLEY RANGE 3333 d, eSurrendered Total:10 BL.REGISTERED:14:29 23 April 2024 |
Conversion | 733628 | New Tenement:G 09/30Application Date:09:25:25 28 Feb 2025Section:S67 |