Tenement: E09-2287

View on Landtracker Maps (logon required)

Extracted from MTO on 01-Jul-2025 00:43, last changed 01-Jul-2025.

Tenement Summary

Identifier:E 09/2287Type:Exploration Licence
Status:DeadDistrict:GASCOYNE M.F.
Lodged:ONLINEArea:10 BL
Purposes:Term:5 Years
Markout:Received:15-Dec-2017 12:29
Commence:17-Apr-2019 Expiry:16-Apr-2024

Holders

Company NameSharesTotal Shares
GOLDFIELDS CONSOLIDATED PTY LTD100100

Applicants on Receival

Company NameSharesTotal Shares
GOLDFIELDS CONSOLIDATED PTY LTD100100

Shires

Shire NameShire NumberStartArea
UPPER GASCOYNE SHIRE847015-Dec-2017 10.00000 BL

Conditions

#VerTextStartEnd
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety.17-Apr-2019
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.17-Apr-2019
31Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.17-Apr-2019
41The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.17-Apr-2019
51The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
17-Apr-2019
1In respect to the area designated as CPL 10 in TENGRAPH the following conditions apply:17-Apr-2019
61Prior to any ground-disturbing activity, as defined by the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety (DMIRS) the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Resource and Environmental Compliance, DMIRS. The program to include:
  • maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
  • the purpose, specifications and life of all proposed disturbances;
  • proposals which may disturb any declared rare or geographically restricted flora and fauna; and
  • techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
17-Apr-2019
71The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Resource and Environmental Compliance, DMIRS. Such rehabilitation as is appropriate and may include:
  • stockpiling and return of topsoil;
  • backfilling all holes, trenches and costeans;
  • ripping;
  • contouring to the original landform;
  • revegetation with seed; and
  • capping and backfilling of all drill holes.
17-Apr-2019
81Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMIRS and arranging an inspection as required.17-Apr-2019
91Mining within a radius of 150 metres of any Australian Telecommunications Commission microwave repeater station being confined to below a depth of 60 metres from the natural surface.17-Apr-2019
101No interference with the Australian Telecommunications Commission microwave repeater station ray-line.17-Apr-2019
111The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Repeater Station Site Reserve 41163.17-Apr-2019

Endorsements

Cond #VerTextStartEnd
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety.17-Apr-2019
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.17-Apr-2019
31Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.17-Apr-2019
41The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.17-Apr-2019
51The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
17-Apr-2019
1In respect to the area designated as CPL 10 in TENGRAPH the following conditions apply:17-Apr-2019
61Prior to any ground-disturbing activity, as defined by the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety (DMIRS) the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Resource and Environmental Compliance, DMIRS. The program to include:
  • maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
  • the purpose, specifications and life of all proposed disturbances;
  • proposals which may disturb any declared rare or geographically restricted flora and fauna; and
  • techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
17-Apr-2019
71The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Resource and Environmental Compliance, DMIRS. Such rehabilitation as is appropriate and may include:
  • stockpiling and return of topsoil;
  • backfilling all holes, trenches and costeans;
  • ripping;
  • contouring to the original landform;
  • revegetation with seed; and
  • capping and backfilling of all drill holes.
17-Apr-2019
81Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMIRS and arranging an inspection as required.17-Apr-2019
91Mining within a radius of 150 metres of any Australian Telecommunications Commission microwave repeater station being confined to below a depth of 60 metres from the natural surface.17-Apr-2019
101No interference with the Australian Telecommunications Commission microwave repeater station ray-line.17-Apr-2019
111The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Repeater Station Site Reserve 41163.17-Apr-2019

Dealings

TypeNumberDetails
Surrender - Outright575245Lodged:08:30 31 March 2020REGISTERED:08:30 31 March 2020

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202015-Dec-2017 79401064409$1,340.0010 BL17-Apr-2019 $1,340.00$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2020$20,000.0008-Apr-2020 $1,909.51$0.00$0.00$0.00$1,909.51$0.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
02-Feb-2018 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2018-02-212018-06-21CLEARED - Expedited Applies2019-03-2210 BL24100S1162629E159km NE'ly of Gascoyne JunctionWO2018/04092018-05-31WC2016/003Objection Withdrawn2019-03-20WO2018/04072018-05-31WC1997/028Objection Withdrawn2019-03-20WAJARRI YAMATJI PART A(WCD2017/007)WC2004/010WAD28/2019falseWCD2017/007BOTHNoGnulli(WC1997/028)WC1997/028WAD6161/1998falseDeterminedCombined Thiin-Mah Warriyangka, Tharrkari, Jiwarli(WC2016/003)WC2016/003WAD464/2016falseDeterminedWajarri Yamatji #1(WC2004/010)WC2004/010WAD28/2019falseDetermined14GeraldtonYamatji Marlpa Aboriginal Corporation