Extracted from MTO on 24-Jun-2025 00:33,
last changed 21-Apr-2024.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 29-May-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 29-May-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 29-May-2019 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 29-May-2019 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 29-May-2019 | |
6 | 1 | The rights of ingress to and egress from Miscellaneous Licence 09/58 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 29-May-2019 | |
7 | 1 | No excavation, excepting shafts, approaching closer to the North West Coastal Highway Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the North West Coastal Highway Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface. | 29-May-2019 | |
8 | 1 | Mining on a strip of land 20 metres wide with any pipeline as the centreline being confined to below a depth of 31 metres from the natural surface and no mining material being deposited upon such strip and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 29-May-2019 | |
9 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 29-May-2019 | |
10 | 1 | No interference with Geodetic Survey Station Quobba 116 and 117 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 29-May-2019 | |
11 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Government Requirements Reserve 15587, Foreshore Management Reserves 19144 and 19145, Drain Reserve 34316, Levee Bank Reserve 36602, Depot Site Bush Fire Brigade Reserve 34315 and Water Supply Reserve 33856. | 29-May-2019 | |
12 | 1 | No mining within 25 metres of either side of the petroleum pipeline licence area of DBNGP Corridor and to a depth of 50 metres being the Consultation Area as shown in TENGRAPH, without the mining tenement holder and the petroleum pipeline licensee consulting with each other and reaching agreement on access and mining activities to be undertaken within the Consultation Area. | 29-May-2019 | |
13 | 1 | No surface excavation approaching closer to the boundary of the Consultation Area than a distance equal to three times the depth of the excavation without the mining tenement holder and the petroleum pipeline licensee reaching agreement as to a lesser distance. | 29-May-2019 | |
14 | 1 | No explosives being used or stored within 150 metres of the petroleum licence area without the mining tenement holder and the petroleum pipeline licensee reaching agreement as to a lesser distance. | 29-May-2019 | |
15 | 1 | The rights of ingress to and egress from the petroleum pipeline licence area being at all times preserved for the employees, contractors and agents of the owners and operators of the pipeline. | 29-May-2019 | |
16 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purposes of protecting the pipeline and any existing condition imposed for this purpose may be cancelled or varied. | 29-May-2019 | |
| 1 | Consent to explore on Quobba Stock Route Reserve 21350 granted subject to the following condition: | 29-May-2019 | |
17 | 1 | No exploration activities being carried out on Quobba Stock Route Reserve 21350 which restrict the use of the reserve. | 29-May-2019 | |
| 1 | Consent to explore on Carnarvon Water Reserve 15 granted. | 29-May-2019 | |
18 | 1 | No exploring on any Wellhead Protection Zone 801, 802, 803 and 804 located within the subject mining tenement boundaries without first obtaining the written consent of the Minister responsible for Mining Act 1978. | 29-May-2019 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 29-May-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 29-May-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 29-May-2019 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 29-May-2019 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 29-May-2019 | |
6 | 1 | The rights of ingress to and egress from Miscellaneous Licence 09/58 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 29-May-2019 | |
7 | 1 | No excavation, excepting shafts, approaching closer to the North West Coastal Highway Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the North West Coastal Highway Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface. | 29-May-2019 | |
8 | 1 | Mining on a strip of land 20 metres wide with any pipeline as the centreline being confined to below a depth of 31 metres from the natural surface and no mining material being deposited upon such strip and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 29-May-2019 | |
9 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 29-May-2019 | |
10 | 1 | No interference with Geodetic Survey Station Quobba 116 and 117 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 29-May-2019 | |
11 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Government Requirements Reserve 15587, Foreshore Management Reserves 19144 and 19145, Drain Reserve 34316, Levee Bank Reserve 36602, Depot Site Bush Fire Brigade Reserve 34315 and Water Supply Reserve 33856. | 29-May-2019 | |
12 | 1 | No mining within 25 metres of either side of the petroleum pipeline licence area of DBNGP Corridor and to a depth of 50 metres being the Consultation Area as shown in TENGRAPH, without the mining tenement holder and the petroleum pipeline licensee consulting with each other and reaching agreement on access and mining activities to be undertaken within the Consultation Area. | 29-May-2019 | |
13 | 1 | No surface excavation approaching closer to the boundary of the Consultation Area than a distance equal to three times the depth of the excavation without the mining tenement holder and the petroleum pipeline licensee reaching agreement as to a lesser distance. | 29-May-2019 | |
14 | 1 | No explosives being used or stored within 150 metres of the petroleum licence area without the mining tenement holder and the petroleum pipeline licensee reaching agreement as to a lesser distance. | 29-May-2019 | |
15 | 1 | The rights of ingress to and egress from the petroleum pipeline licence area being at all times preserved for the employees, contractors and agents of the owners and operators of the pipeline. | 29-May-2019 | |
16 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purposes of protecting the pipeline and any existing condition imposed for this purpose may be cancelled or varied. | 29-May-2019 | |
| 1 | Consent to explore on Quobba Stock Route Reserve 21350 granted subject to the following condition: | 29-May-2019 | |
17 | 1 | No exploration activities being carried out on Quobba Stock Route Reserve 21350 which restrict the use of the reserve. | 29-May-2019 | |
| 1 | Consent to explore on Carnarvon Water Reserve 15 granted. | 29-May-2019 | |
18 | 1 | No exploring on any Wellhead Protection Zone 801, 802, 803 and 804 located within the subject mining tenement boundaries without first obtaining the written consent of the Minister responsible for Mining Act 1978. | 29-May-2019 | |
Type | Number | Details |
Objection | 521371 | Lodged:08:30 10 January 2018Objectors:YARRI MINING PTY LTDObjection Type:Tenement ApplicationRECORDED:08:30 10 January 2018WITHDRAWN:10:01:58 20 July 2018 |
Application to Amend | 531446 | Lodged:15:47:31 29 May 2018Amending:Address (Including DTC Details)From:SQUADRON RESOURCES PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, C/-HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977To:SQUADRON RESOURCES PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977RECORDED:15:47:31 29 May 2018 |
Application to Amend | 554325 | Lodged:15:35 21 May 2019Amending:Address (Including DTC Details)From:Principal Place of Business : SQUADRON RESOURCES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849 and DTC :SQUADRON RESOURCES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849To:Principal Place of Business : SQUADRON RESOURCES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849 and DTC :SQUADRON RESOURCES PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxxx977RECORDED:15:35 21 May 2019 |
Application to Amend | 581636 | Lodged:11:28:02 08 July 2020Amending:NameFrom:SQUADRON RESOURCES PTY LTDTo:WYLOO METALS PTY LTDREJECTED:11:28:02 08 July 2020 |
Application to Amend | 581792 | Lodged:08:30 10 July 2020Amending:NameFrom:SQUADRON RESOURCES PTY LTDTo:WYLOO METALS PTY LTDRECORDED:08:30 10 July 2020 |
Application to Amend | 590133 | Lodged:14:30 11 November 2020REJECTED:14:30 11 November 2020Relodged:11:12 13 November 2020Amending:Address (Including DTC Details)From:Principal Place of Business : WYLOO METALS PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849 and DTC :WYLOO METALS PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxxx977To:Principal Place of Business : WYLOO METALS PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, LEVEL 19, SUITE 4, 44 ST GEORGES TERRACE, PERTH, WA, 6000 and DTC :WYLOO METALS PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, SUITE 404, GROUND FLOOR, 50 ST GEORGES TERRACE, PERTH, WA, 6000, xxxxx@hemts.com.au, xxxxxx977RECORDED:11:12 13 November 2020 |
Application to Amend | 633392 | Lodged:13:18:54 01 October 2021Amending:Address (Including DTC Details)From:Principal Place of Business : WYLOO METALS PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, LEVEL 19, SUITE 4, 44 ST GEORGES TERRACE, PERTH, WA, 6000 and DTC :WYLOO METALS PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, SUITE 404, GROUND FLOOR, 50 ST GEORGES TERRACE, PERTH, WA, 6000, xxxxx@hemts.com.au, xxxxxx977To:Principal Place of Business : WYLOO METALS PTY LTD, 171-173 MOUNTS BAY ROAD, PERTH, WA, 6000, xxxxxxxxx@wyloometals.com, xxxxxxx949 and DTC :WYLOO METALS PTY LTD, WYLOO METALS PTY LTD, PO BOX 3155, BROADWAY NEDLANDS, WA, 6009, xxxxxxxxx@wyloometals.com, xxxxxxx949RECORDED:13:18:54 01 October 2021 |
Surrender - Outright | 649705 | Lodged:14:11:07 19 May 2022REGISTERED:14:11:07 19 May 2022 |