Tenement: E09-2282

View on Landtracker Maps (logon required)

Extracted from MTO on 11-Jul-2025 00:55, last changed 03-Jul-2025.

Tenement Summary

Identifier:E 09/2282Type:Exploration Licence
Status:DeadDistrict:GASCOYNE M.F.
Lodged:PERTHArea:20 BL
Purposes:Term:5 Years
Markout:Received:28-Nov-2017 14:00
Commence:17-Apr-2019 Expiry:16-Apr-2024

Holders

Company NameSharesTotal Shares
ZOHAR, Julie99100
ZOHAR, Shoshanna1100

Applicants on Receival

Company NameSharesTotal Shares
ZOHAR, Julie99100
ZOHAR, Shoshanna1100

Shires

Shire NameShire NumberStartArea
CARNARVON SHIRE154028-Nov-2017 14.00000 BL
SHARK BAY SHIRE777028-Nov-2017 6.00000 BL

Conditions

#VerTextStartEnd
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety.17-Apr-2019
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.17-Apr-2019
31Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.17-Apr-2019
41The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.17-Apr-2019
51The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
17-Apr-2019
1In respect to the area designated as CPL 13 in TENGRAPH the following conditions apply:17-Apr-2019
61Prior to any ground-disturbing activity, as defined by the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety (DMIRS) the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Resource and Environmental Compliance, DMIRS. The program to include:
  • maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
  • the purpose, specifications and life of all proposed disturbances;
  • proposals which may disturb any declared rare or geographically restricted flora and fauna; and
  • techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
17-Apr-2019
71The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Resource and Environmental Compliance, DMIRS. Such rehabilitation as is appropriate and may include:
  • stockpiling and return of topsoil;
  • backfilling all holes, trenches and costeans;
  • ripping;
  • contouring to the original landform;
  • revegetation with seed; and
  • capping and backfilling of all drill holes.
17-Apr-2019
81Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMIRS and arranging an inspection as required.17-Apr-2019
91No excavation, excepting shafts, approaching closer to the NorthWest Coastal Highway Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the North West Coastal Highway Highway or Highway verge being confined to below a depth of 30 metres from the natural surface.17-Apr-2019
101The prior written consent of the Minister responsible for the Mining Act 1978 being obtained, with the concurrence of the Minister for Environment, before entering or commencing any prospecting or exploration activity on Preservation of Sedimentary Deposits Reserve 30885 (5G Reserve Preservation of Sedimentary Deposits).17-Apr-2019
111No construction of any building within a 500 metre strip from the coast line, without the prior written approval of the Minister responsible for the Mining Act 1978 being obtained.17-Apr-2019
121No interference with Geodetic Survey Station Yaringa 40, 40T, 58T and 58T 1 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.17-Apr-2019
131No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface.17-Apr-2019
141The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Marine Reserve 6 World Heritage listed area WHA1 and Seabed, Foreshore and Navigable Waters.17-Apr-2019

Endorsements

Cond #VerTextStartEnd
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety.17-Apr-2019
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.17-Apr-2019
31Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.17-Apr-2019
41The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.17-Apr-2019
51The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
17-Apr-2019
1In respect to the area designated as CPL 13 in TENGRAPH the following conditions apply:17-Apr-2019
61Prior to any ground-disturbing activity, as defined by the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety (DMIRS) the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Resource and Environmental Compliance, DMIRS. The program to include:
  • maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
  • the purpose, specifications and life of all proposed disturbances;
  • proposals which may disturb any declared rare or geographically restricted flora and fauna; and
  • techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
17-Apr-2019
71The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Resource and Environmental Compliance, DMIRS. Such rehabilitation as is appropriate and may include:
  • stockpiling and return of topsoil;
  • backfilling all holes, trenches and costeans;
  • ripping;
  • contouring to the original landform;
  • revegetation with seed; and
  • capping and backfilling of all drill holes.
17-Apr-2019
81Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMIRS and arranging an inspection as required.17-Apr-2019
91No excavation, excepting shafts, approaching closer to the NorthWest Coastal Highway Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the North West Coastal Highway Highway or Highway verge being confined to below a depth of 30 metres from the natural surface.17-Apr-2019
101The prior written consent of the Minister responsible for the Mining Act 1978 being obtained, with the concurrence of the Minister for Environment, before entering or commencing any prospecting or exploration activity on Preservation of Sedimentary Deposits Reserve 30885 (5G Reserve Preservation of Sedimentary Deposits).17-Apr-2019
111No construction of any building within a 500 metre strip from the coast line, without the prior written approval of the Minister responsible for the Mining Act 1978 being obtained.17-Apr-2019
121No interference with Geodetic Survey Station Yaringa 40, 40T, 58T and 58T 1 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.17-Apr-2019
131No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface.17-Apr-2019
141The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Marine Reserve 6 World Heritage listed area WHA1 and Seabed, Foreshore and Navigable Waters.17-Apr-2019

Dealings

TypeNumberDetails
Forfeiture628273Initiated:19/07/2021 for non-compliance with reporting requirements( Form 5 )RECORDED:08:22 19 July 2021Notice Issued:Regulation 50 Notice sent 19/07/2021 for non-compliance with expenditure requirements pursuant to Reg 22/Sec 63A- non lodgement of Form 5.Compliance Date:23/08/2021FINALISED:Order by Minister on 01 September 2021 that E 09/2282 be Penalty Imposed
Fine631662Fine in respect to:Forfeiture Process 628273Fine reason:Non-compliance with expenditure obligationsPenalty amount:$300.00Notification date:01/09/2021Due date:06/10/2021Pursuant to:Section 96A(5)RECORDED:01 September 2021PAYMENT RECEIVED:02 September 2021FINALISED:02 September 2021Receipt Number:06-181425Amount:$300.00Remaining balance:$0.00
Surrender - Outright698946Lodged:11:06:41 18 March 2024REGISTERED:11:06:41 18 March 2024

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202413-Mar-2023 10337028$5,500.0020 BL17-Apr-2019 $5,500.00$0.00
Rental202303-May-2022 06-183541PERTH$5,240.0020 BL17-Apr-2019 $5,240.00$0.00
Rental202225-Mar-2021 10189731$2,820.0020 BL17-Apr-2019 $2,820.00$0.00
Rental202112-May-2020 10144216$2,760.0020 BL17-Apr-2019 $2,760.00$0.00
Rental202028-Nov-2017 06-163623PERTH$2,680.0020 BL17-Apr-2019 $2,680.00$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2024$30,000.0018-Mar-2024 $10,360.00$0.00$0.00$0.00$9,360.00$1,000.00$0.00false
2023Replacement$30,000.0012-Apr-2023 $40,600.00$28,000.00$0.00$0.00$9,100.00$3,500.00$0.00false
2023$30,000.0015-Mar-2023 $26,000.00$18,000.00$0.00$0.00$4,500.00$3,500.00$0.00true
2022$20,000.0021-Apr-2022 $35,280.00$26,500.00$0.00$0.00$3,780.00$5,000.00$0.00false
2021$20,000.0021-Jul-2021 $32,300.00$23,540.00$0.00$0.00$3,760.00$5,000.00$0.00false
2020$20,000.0018-May-2020 $29,280.00$20,520.00$0.00$500.00$3,760.00$4,500.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
01-Mar-2018 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2018-03-212018-07-21CLEARED - Expedited Applies2019-04-0120 BL2630S1141729E77km E'ly of DenhamWO2018/04642018-06-20WC1998/017Objection Withdrawn2019-04-01The Malgana Shark Bay People's Application(WC1998/017)WC1998/017WAD6236/1998truePartially Determined14GeraldtonYamatji Marlpa Aboriginal Corporation