Tenement: E09-2264

View on Landtracker Maps (logon required)

Extracted from MTO on 06-Jul-2025 01:01, last changed 28-Jun-2025.

Tenement Summary

Identifier:E 09/2264Type:Exploration Licence
Status:DeadDistrict:GASCOYNE M.F.
Lodged:PERTHArea:14 BL
Purposes:Term:5 Years
Markout:Received:18-Oct-2017 11:45
Commence:08-Aug-2018 Expiry:07-Aug-2023

Holders

Company NameSharesTotal Shares
MCNAB, Darron Edward100100

Applicants on Receival

Company NameSharesTotal Shares
MCNAB, Darron Edward100100

Shires

Shire NameShire NumberStartArea
MURCHISON SHIRE616018-Oct-2017 14.00000 BL

Conditions

#VerTextStartEnd
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS.08-Aug-2018
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.08-Aug-2018
31Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.08-Aug-2018
41The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.08-Aug-2018
51The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
08-Aug-2018
1In respect to the area designated as CPL 31 in TENGRAPH the following conditions apply:08-Aug-2018
61Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, Department of Mines, Industry Regulation and Safety (DMIRS) the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMIRS. The program to include:
  • maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
  • the purpose, specifications and life of all proposed disturbances;
  • proposals which may disturb any declared rare or geographically restricted flora and fauna; and
  • techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
08-Aug-2018
71The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMIRS. Such rehabilitation as is appropriate and may include:
  • stockpiling and return of topsoil;
  • backfilling all holes, trenches and costeans;
  • ripping;
  • contouring to the original landform;
  • revegetation with seed; and
  • capping and backfilling of all drill holes.
08-Aug-2018
81Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMIRS and arranging an inspection as required.08-Aug-2018

Endorsements

Cond #VerTextStartEnd
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS.08-Aug-2018
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.08-Aug-2018
31Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.08-Aug-2018
41The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.08-Aug-2018
51The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
08-Aug-2018
1In respect to the area designated as CPL 31 in TENGRAPH the following conditions apply:08-Aug-2018
61Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, Department of Mines, Industry Regulation and Safety (DMIRS) the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMIRS. The program to include:
  • maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
  • the purpose, specifications and life of all proposed disturbances;
  • proposals which may disturb any declared rare or geographically restricted flora and fauna; and
  • techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
08-Aug-2018
71The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMIRS. Such rehabilitation as is appropriate and may include:
  • stockpiling and return of topsoil;
  • backfilling all holes, trenches and costeans;
  • ripping;
  • contouring to the original landform;
  • revegetation with seed; and
  • capping and backfilling of all drill holes.
08-Aug-2018
81Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMIRS and arranging an inspection as required.08-Aug-2018

Dealings

TypeNumberDetails
Application to Amend523065Lodged:15:26 07 February 2018Amending:Other/Non-title changesForm 21 Section (a) Exploration Licence Form 21 Section (c) Gascoyne (09) Mineral FieldRECORDED:15:26 07 February 2018
Surrender - Outright573480Lodged:09:48:22 05 March 2020REGISTERED:09:48:22 05 March 2020

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202020-Aug-2019 96242897323$1,932.0014 BL08-Aug-2018 $1,932.00$0.00
Rental201918-Oct-2017 06-163117PERTH$1,876.0014 BL08-Aug-2018 $1,876.00$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2020$11,667.00false
2019$20,000.0016-Sep-2019 $20,590.82$17,520.63$0.00$0.00$2,270.19$800.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
28-Feb-2018 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2018-03-212018-07-21CLEARED - Expedited Applies2018-08-0714 BL26480S115530E118km NW'ly of YalgooWAJARRI YAMATJI PART A(WCD2017/007)WC2004/010WAD28/2019falseWCD2017/007BOTHNoWajarri Yamatji #1(WC2004/010)WC2004/010WAD28/2019trueDetermined14GeraldtonYamatji Marlpa Aboriginal Corporation