# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 16-Mar-2018 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 16-Mar-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 16-Mar-2018 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 16-Mar-2018 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 16-Mar-2018 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 16-Mar-2018 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 16-Mar-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 16-Mar-2018 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 16-Mar-2018 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 16-Mar-2018 | |
Type | Number | Details |
Application to Amend | 510452 | Lodged:14:00:25 13 July 2017Amending:NameFrom:PIETERS PAS, JohanTo:PAS, Johan PieterRECORDED:14:00:25 13 July 2017 |
Extension of Time | 512259 | Lodged:09:24:20 09 August 2017Type:Service on PastoralistRECORDED:09:24:20 09 August 2017APPROVED:08:45 10 August 2017 |
Extension of Time | 512260 | Lodged:09:24:20 09 August 2017Type:SecurityRECORDED:09:24:20 09 August 2017APPROVED:08:45 10 August 2017 |
Forfeiture | 556478 | Initiated:20/06/2019 for non-compliance with reporting requirements( Form 5 )RECORDED:12:01:29 19 June 2019Notice Issued:Regulation 50 Notice sent 20/06/2019 for non-compliance with expenditure requirements pursuant to Reg 22/Sec 63A- non lodgement of Form 5.Compliance Date:25/07/2019FINALISED:Order by Minister on 29 July 2019 that E 09/2243 be Penalty Imposed |
Fine | 559220 | Fine in respect to:Forfeiture Process 556478Fine reason:Non-compliance with expenditure obligationsPenalty amount:$360.00Notification date:29/07/2019Due date:02/09/2019Pursuant to:Section 96A(5)RECORDED:29 July 2019PAYMENT RECEIVED:27 August 2019FINALISED:27 August 2019Receipt Number:06-172172Amount:$360.00Remaining balance:$0.00 |
Forfeiture | 580146 | Initiated:19/06/2020 for non-compliance with reporting requirements( Form 5 )RECORDED:08:40 19 June 2020Notice Issued:Regulation 50 Notice sent 19/06/2020 for non-compliance with expenditure requirements pursuant to Reg 22/Sec 63A- non lodgement of Form 5.Compliance Date:27/07/2020FINALISED:Order by Minister on 17 August 2020 that E 09/2243 be Penalty Imposed |
Fine | 584248 | Fine in respect to:Forfeiture Process 580146Fine reason:Non-compliance with expenditure obligationsPenalty amount:$1,080.00Notification date:19/08/2020Due date:23/09/2020Pursuant to:Section 96A(5)RECORDED:17 August 2020PAYMENT RECEIVED:22 September 2020FINALISED:22 September 2020Receipt Number:57157834002Amount:$1,080.00Remaining balance:$0.00 |