Tenement: E09-2239

View on Landtracker Maps (logon required)

Extracted from MTO on 16-Jul-2025 00:38, last changed 26-Jun-2025.

Tenement Summary

Identifier:E 09/2239Type:Exploration Licence
Status:LiveDistrict:GASCOYNE M.F.
Lodged:ONLINEArea:11 BL
Purposes:Term:5 Years (Extended)
Markout:Received:16-Jun-2017 14:46
Commence:12-Jan-2018 Expiry:11-Jan-2028

Holders

Company NameSharesTotal Shares
CAPRICORN OROGEN PTY LTD100100

Applicants on Receival

Company NameSharesTotal Shares
MILFORD RESOURCES PTY LTD100100

Shires

Shire NameShire NumberStartArea
UPPER GASCOYNE SHIRE847016-Jun-2017 11.00000 BL

Conditions

#VerTextStartEnd
12All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety.29-Oct-2024
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.12-Jan-2018 28-Oct-2024
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.12-Jan-2018
31Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.12-Jan-2018
41The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.12-Jan-2018
51The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
12-Jan-2018
61All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety.29-Oct-2024
71Unless the written approval of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.29-Oct-2024
81The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request.29-Oct-2024
91All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work.29-Oct-2024

Endorsements

Cond #VerTextStartEnd
12All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety.29-Oct-2024
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.12-Jan-2018 28-Oct-2024
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.12-Jan-2018
31Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.12-Jan-2018
41The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.12-Jan-2018
51The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
12-Jan-2018
61All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety.29-Oct-2024
71Unless the written approval of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.29-Oct-2024
81The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request.29-Oct-2024
91All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work.29-Oct-2024

Dealings

TypeNumberDetails
Application to Amend537094Lodged:15:15 14 August 2018Amending:Address (Including DTC Details)From:Principal Place of Business : MILFORD RESOURCES PTY LTD, PO BOX 760, WEST PERTH, WA, 6872 and DTC :MILFORD RESOURCES PTY LTD, DR NIGEL BRAND, PO BOX 760, WEST PERTH, WA, 6872, xxxxxxx@BIGPOND.NET.AU, xxxxxxx768To:Principal Place of Business : MILFORD RESOURCES PTY LTD, C/-MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxxxx997 and DTC :MILFORD RESOURCES PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/-MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxxxx997RECORDED:15:15 14 August 2018
Caveat616506Lodged:15:30 23 February 2021Caveat Type:Consent CaveatCaveator:REDLAND PLAINS PTY LTDShares Caveated:100/100 shares MINING INVESTMENTS AUSTRALIA PTY LTDRECORDED:15:30 23 February 2021WITHDRAWN:14:45:35 10 January 2024
Caveat630929Lodged:13:31:27 20 August 2021Caveat Type:Consent CaveatCaveator:CAPRICORN OROGEN PTY LTDShares Caveated:100/100 shares MINING INVESTMENTS AUSTRALIA PTY LTDRECORDED:13:31:27 20 August 2021WITHDRAWN:15:25 21 March 2022
Withdrawal of Dealing645304Lodged:15:25 21 March 2022In respect to:Caveat 630929RECORDED:15:25 21 March 2022
Extension / Renewal of Term666099Lodged:14:46:55 22 December 2022Applied For Period:5 YearsRECORDED:14:46:55 22 December 2022GRANTED:28 March 2023Granted Period:5 YearsTerm Extended To:11/01/2028
Withdrawal of Dealing693815Lodged:14:45:35 10 January 2024In respect to:Caveat 616506RECORDED:14:45:35 10 January 2024
Partial Surrender - Voluntary693822Lodged:14:50:44 10 January 2024Surrendered Blocks:MEEKATHARRA 168 c, d, g, h, n, o, tSurrendered Total:7 BL.REGISTERED:14:50:44 10 January 2024
Forfeiture698250WITHDRAWN:08 March 2024 (commenced in error)

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202616-Jan-2025 10739396$8,624.0011 BL10-Jan-2024 $8,624.00$0.00
Rental202524-Apr-2024 (REFUND) FIL-47301$2,765.0011 BL10-Jan-2024 $4,345.00$0.00
Rental202503-Jan-2024 40056139446$7,110.00
Rental202414-Dec-2022 29373694944$6,768.0018 BL12-Jan-2018 $6,768.00$0.00
Rental202323-Dec-2021 19615545950$4,716.0018 BL12-Jan-2018 $4,716.00$0.00
Rental202205-Jan-2021 10116483723$4,284.0018 BL12-Jan-2018 $4,284.00$0.00
Rental202108-Jan-2020 50189774422$2,484.0018 BL12-Jan-2018 $2,484.00$0.00
Rental202020-Dec-2018 89539325026$2,448.0018 BL12-Jan-2018 $2,448.00$0.00
Rental201916-Jun-2017 74489630795$2,331.0018 BL12-Jan-2018 $2,331.00$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2026$70,000.00false
2025$50,000.0005-Mar-2025 $1,244,870.00$1,129,173.00$0.00$49,628.00$6,441.00$59,628.00$0.00false
2024$50,000.0006-Mar-2024 $596,274.00$428,752.00$0.00$148,772.00$8,750.00$10,000.00$0.00false
2023$30,000.0014-Feb-2023 $30,082.00$17,384.00$0.00$0.00$6,698.00$6,000.00$0.00false
2022$30,000.0028-Feb-2022 $57,625.00$46,192.00$0.00$0.00$5,433.00$6,000.00$0.00false
2021$20,000.0009-Mar-2021 $25,204.00$17,667.00$0.00$0.00$3,337.00$4,200.00$0.00false
2020$20,000.0011-Mar-2020 $72,732.00$57,309.00$0.00$0.00$3,301.00$12,122.00$0.00false
2019$20,000.0011-Mar-2019 $35,169.00$26,137.00$0.00$0.00$3,171.00$5,861.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
03-Aug-2017 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2017-08-232017-12-23CLEARED - Expedited Applies2018-01-1218 BL24130S115580E120km NE'ly of Gascoyne JunctionWO2017/07182017-10-18WC2016/003Objection Withdrawn Agreement2018-01-10WO2017/08352017-12-08WC1997/028Objection Withdrawn Agreement2018-01-10Gnulli(WC1997/028)WC1997/028WAD6161/1998falseDeterminedCombined Thiin-Mah Warriyangka, Tharrkari, Jiwarli(WC2016/003)WC2016/003WAD464/2016falseDetermined14GeraldtonYamatji Marlpa Aboriginal Corporation