Extracted from MTO on 07-Jul-2025 00:59,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 12-Jan-2018 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 12-Jan-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Jan-2018 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 12-Jan-2018 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 12-Jan-2018 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 12-Jan-2018 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 12-Jan-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Jan-2018 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 12-Jan-2018 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 12-Jan-2018 | |
Type | Number | Details |
Application to Amend | 537094 | Lodged:15:15 14 August 2018Amending:Address (Including DTC Details)From:Principal Place of Business : MILFORD RESOURCES PTY LTD, PO BOX 760, WEST PERTH, WA, 6872, xxxxxxx@bigpond.net.au, xxxxxxx768 and DTC :MILFORD RESOURCES PTY LTD, NIGEL BRAND, PO BOX 760, WEST PERTH, WA, 6872, xxxxxxx@bigpond.net.au, xxxxxxx768To:Principal Place of Business : MILFORD RESOURCES PTY LTD, C/-MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxxxx997 and DTC :MILFORD RESOURCES PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/-MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxxxx997RECORDED:15:15 14 August 2018 |
Caveat | 616505 | Lodged:15:30 23 February 2021Caveat Type:Consent CaveatCaveator:REDLAND PLAINS PTY LTDShares Caveated:100/100 shares MINING INVESTMENTS AUSTRALIA PTY LTDRECORDED:15:30 23 February 2021WITHDRAWN:14:45:35 10 January 2024 |
Caveat | 630928 | Lodged:13:31:27 20 August 2021Caveat Type:Consent CaveatCaveator:CAPRICORN OROGEN PTY LTDShares Caveated:100/100 shares MINING INVESTMENTS AUSTRALIA PTY LTDRECORDED:13:31:27 20 August 2021WITHDRAWN:15:25 21 March 2022 |
Withdrawal of Dealing | 645304 | Lodged:15:25 21 March 2022In respect to:Caveat 630928RECORDED:15:25 21 March 2022 |
Extension / Renewal of Term | 666098 | Lodged:14:45:43 22 December 2022Applied For Period:5 YearsRECORDED:14:45:43 22 December 2022GRANTED:05 April 2023Granted Period:5 YearsTerm Extended To:11/01/2028 |
Withdrawal of Dealing | 693815 | Lodged:14:45:35 10 January 2024In respect to:Caveat 616505RECORDED:14:45:35 10 January 2024 |
Partial Surrender - Voluntary | 693821 | Lodged:14:50:44 10 January 2024Surrendered Blocks:MEEKATHARRA 161 d, g, o, p, u
MEEKATHARRA 162 l, qSurrendered Total:7 BL.REGISTERED:14:50:44 10 January 2024 |
Forfeiture | 698250 | WITHDRAWN:08 March 2024 (commenced in error) |