Extracted from MTO on 12-Jul-2025 01:01,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 16-Oct-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 16-Oct-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 16-Oct-2017 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 16-Oct-2017 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 16-Oct-2017 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 16-Oct-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 16-Oct-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 16-Oct-2017 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 16-Oct-2017 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 16-Oct-2017 | |
Type | Number | Details |
Application to Amend | 506066 | Lodged:14:20 10 May 2017Amending:Address (Including DTC Details)From:Principal Place of Business : WESTERN COBALT PTY LTD, 6 COCKATOO PL, BROOKDALE, WA, 6112, xxxxxxxx@westnet.com.au, xxxxxxx072 and DTC :WESTERN COBALT PTY LTD, SIMON JONES, 6 COCKATOO PL, BROOKDALE, WA, 6112, xxxxxxxx@westnet.com.au, xxxxxxx072To:Principal Place of Business : WESTERN COBALT PTY LTD, 1/8 OUTRAM ST, WEST PERTH, WA, 6005, xxxxx@ansonresources.com, xxxxxxxxx299 and DTC :WESTERN COBALT PTY LTD, GREG KNOX, PO BOX 219, WEST PERTH, WA, 6872, xxxxx@ansonresources.com, xxxxxxxxx299RECORDED:14:20 10 May 2017 |
Forfeiture | 572742 | Initiated:24/02/2020 for non-compliance with reporting requirementsRECORDED:10:13:19 24 February 2020Notice Issued:Regulation 50 Notice sent 24/02/2020 for non-compliance with reporting requirements pursuant to Sec 115A.Compliance Date:30/03/2020FINALISED:Order by Minister on 27 March 2020 that E 09/2218 be Penalty Imposed |
Fine | 575056 | Fine in respect to:Forfeiture Process 572742Fine reason:Non-compliance with mineral exploration reporting provisionsPenalty amount:$180.00Notification date:30/03/2020Due date:04/05/2020Pursuant to:Section 96A(5)RECORDED:27 March 2020PAYMENT RECEIVED:17 April 2020FINALISED:17 April 2020Receipt Number:10141168Amount:$180.00Remaining balance:$0.00 |
Forfeiture | 593860 | Initiated:15/01/2021 for non-compliance with reporting requirements( Form 5 )RECORDED:08:32 15 January 2021Notice Issued:Regulation 50 Notice sent 15/01/2021 for non-compliance with expenditure requirements pursuant to Reg 22/Sec 63A- non lodgement of Form 5.Compliance Date:19/02/2021FINALISED:Order by Minister on 15 March 2021 that E 09/2218 be Penalty Imposed |
Fine | 617842 | Fine in respect to:Forfeiture Process 593860Fine reason:Non-compliance with expenditure obligationsPenalty amount:$540.00Notification date:19/03/2021Due date:23/04/2021Pursuant to:Section 96A(5)RECORDED:15 March 2021PAYMENT RECEIVED:05 April 2021FINALISED:05 April 2021Receipt Number:10190795Amount:$540.00Remaining balance:$0.00 |
Extension / Renewal of Term | 660907 | Lodged:08:30 12 October 2022Applied For Period:5 YearsRECORDED:08:30 12 October 2022GRANTED:17 November 2022Granted Period:5 YearsTerm Extended To:15/10/2027 |
Extension of Time | 661941 | Lodged:12:18:23 26 October 2022Type:OtherRECORDED:12:18:23 26 October 2022APPROVED:13:47:12 27 October 2022Time to lodge extended to COB 16 November 2022 |
Forfeiture | 666708 | Initiated:11/01/2023 for non-compliance with rent requirementsRECORDED:10:56:48 11 January 2023FINALISED:Order by Minister on 04 April 2023 that E 09/2218 be Penalty ImposedNotice Issued:Regulation 50 Notice sent 11/01/2023 for non-compliance with rent requirements pursuant to Reg 109/Sec 63A- late payment of rent.Compliance Date:15/02/2023 |
Fine | 672615 | Fine in respect to:Forfeiture Process 666708Fine reason:Non-compliance with rent obligationsPenalty amount:$602.00Notification date:12/04/2023Due date:19/05/2023Pursuant to:Section 96A(5)RECORDED:12 April 2023PAYMENT RECEIVED:03 May 2023FINALISED:03 May 2023Receipt Number:10354985Amount:$602.00Remaining balance:$0.00 |