Extracted from MTO on 24-Jun-2025 00:14,
last changed 20-Sep-2023.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 13-Sep-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 13-Sep-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 13-Sep-2017 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 13-Sep-2017 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 13-Sep-2017 | |
6 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 13-Sep-2017 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 13-Sep-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 13-Sep-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 13-Sep-2017 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 13-Sep-2017 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 13-Sep-2017 | |
6 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 13-Sep-2017 | |
Type | Number | Details |
Application to Amend | 515786 | Lodged:16:12:26 05 October 2017Amending:Address (Including DTC Details)From:PURE MANGANESE PTY LTD, DENNIS FRY, PO BOX 283, MITCHELL, ACT, 2911, xxxxxxxxxxxxxx@gmail.com, xxxxxxx642To:PURE MANGANESE PTY LTD, MARCO TENTORI, C/- ANDERSON S TENEMENT MANAGEMENT, PO BOX 2162, WARWICK, WA, 6024, xxxxxx@atmwa.net.au, xxxxxxxxx095RECORDED:16:12:26 05 October 2017 |
Application to Amend | 535554 | Lodged:15:20 20 July 2018Amending:Address (Including DTC Details)From:PURE MANGANESE PTY LTD, PO BOX 1445, WOLLONGONG, NSW, 2500, xxxx@billkoutlis.com.au, xxxxxxx271To:PURE MANGANESE PTY LTD, LEVEL 1, ALTONA STREET, WEST PERTH, WA, 6005RECORDED:15:20 20 July 2018 |
Surrender - Outright | 579306 | Lodged:08:30 04 June 2020REGISTERED:08:30 04 June 2020 |