Disclaimer: While all due care is taken with the accuracy of this data, LandTrack Systems accepts no liability for any loss or damages incurred by incorrect or missing information on this site. Data is sourced from state mines department website, and remains subject to their respective disclaimers and copyright notices as well. The data is provided subject to the correct function of the department websites and the availability of up-to-date data at the time of preparing the report.
Extracted from MTO on 08-Jul-2025 00:54, last changed 30-Jun-2025.
Identifier: | E 09/2198 | Type: | Exploration Licence |
---|---|---|---|
Status: | Dead | District: | GASCOYNE M.F. |
Lodged: | ONLINE | Area: | 48 BL |
Purposes: | Term: | 5 Years | |
Markout: | Received: | 24-May-2016 11:36 | |
Commence: | 28-Apr-2017 | Expiry: | 27-Apr-2022 |
Company Name | Shares | Total Shares |
---|---|---|
ARROW (MALINDA) PTY LTD | 100 | 100 |
Company Name | Shares | Total Shares |
---|---|---|
SEGUE (GASCOYNE) PTY LTD | 100 | 100 |
Shire Name | Shire Number | Start | Area |
---|---|---|---|
UPPER GASCOYNE SHIRE | 8470 | 24-May-2016 | 48.00000 BL |
# | Ver | Text | Start | End |
---|---|---|---|---|
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 28-Apr-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 28-Apr-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 28-Apr-2017 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 28-Apr-2017 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
| 28-Apr-2017 | |
6 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on CR 699 Public Purposes Reserve 699. | 28-Apr-2017 | |
7 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 28-Apr-2017 | |
8 | 1 | No interference with Geodetic Survey Station SSM-WH25 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 28-Apr-2017 | |
1 | In respect to the area designated as CPL 29 in TENGRAPH the following conditions apply: | 28-Apr-2017 | ||
9 | 1 | Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, DMP the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMP. The program to include:
| 28-Apr-2017 | |
10 | 1 | The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMP. Such rehabilitation as is appropriate and may include:
| 28-Apr-2017 | |
11 | 1 | Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMP and arranging an inspection as required. | 28-Apr-2017 |
Cond # | Ver | Text | Start | End |
---|---|---|---|---|
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 28-Apr-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 28-Apr-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 28-Apr-2017 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 28-Apr-2017 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
| 28-Apr-2017 | |
6 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on CR 699 Public Purposes Reserve 699. | 28-Apr-2017 | |
7 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 28-Apr-2017 | |
8 | 1 | No interference with Geodetic Survey Station SSM-WH25 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 28-Apr-2017 | |
1 | In respect to the area designated as CPL 29 in TENGRAPH the following conditions apply: | 28-Apr-2017 | ||
9 | 1 | Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, DMP the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMP. The program to include:
| 28-Apr-2017 | |
10 | 1 | The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMP. Such rehabilitation as is appropriate and may include:
| 28-Apr-2017 | |
11 | 1 | Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMP and arranging an inspection as required. | 28-Apr-2017 |
Type | Number | Details |
---|---|---|
Application to Amend | 521430 | Lodged:15:00 10 January 2018Amending:NameFrom:NEXT ADVANCEMENTS PTY LTDTo:ARROW (MALINDA) PTY LTDAmending:Address (Including DTC Details)From:Principal Place of Business : NEXT ADVANCEMENTS PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931 and DTC :NEXT ADVANCEMENTS PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931To:Principal Place of Business : ARROW (MALINDA) PTY LTD, SAME AS CORRESPONDENCE and DTC :ARROW (MALINDA) PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxxxxx997RECORDED:15:00 10 January 2018 |
Partial Surrender - Voluntary | 527687 | Lodged:15:07 11 April 2018Surrendered Blocks:MEEKATHARRA 383 e, k, p, u, z MEEKATHARRA 455 e MEEKATHARRA 456 a, f, g, h, m, n, o, r, s, t, u, w, x, y, z MEEKATHARRA 457 q, r, v, w MEEKATHARRA 458 v, w, x, y MEEKATHARRA 528 b, c, d, e, h, j, k, p MEEKATHARRA 529 a, b, c, d, e, f, g, h, j, k, l, m, n, o, p MEEKATHARRA 530 a, b, c, d, e, f, g, h, j, k, l, m, n, o, p MEEKATHARRA 531 a, b, f, g, h, j, k, l, m, n, o, p, r, s, t, u MEEKATHARRA 532 f, g, l, m, n, q, r, s, t, v, w, x, y, z MEEKATHARRA 533 v MEEKATHARRA 604 b, c, d, e MEEKATHARRA 605 aSurrendered Total:103 BL.REGISTERED:15:07 11 April 2018 |
Extension of Time | 576184 | Lodged:11:58 14 April 2020Type:RentRECORDED:11:58 14 April 2020extension of time until 28 August 2020 to pay annual rentAPPROVED:14:17 28 April 2020 |
Surrender - Outright | 626440 | Lodged:11:17 18 June 2021REGISTERED:11:17 18 June 2021 |
Type | Year | Receipt Date | Receipt No. | MR Lodged | Amount | Rental Area | Effective Date | Amt Due | Discrepancy |
---|---|---|---|---|---|---|---|---|---|
Rental | 2022 | 09-Apr-2021 | 12648102721 | $11,424.00 | 48 BL | 11-Apr-2018 | $11,424.00 | $0.00 | |
Rental | 2021 | 26-Aug-2020 | 56427549736 | $11,184.00 | 48 BL | 11-Apr-2018 | $11,184.00 | $0.00 | |
Rental | 2020 | 02-Apr-2019 | 92460584389 | $6,528.00 | 48 BL | 11-Apr-2018 | $6,528.00 | $0.00 | |
Rental | 2019 | 27-Apr-2018 | 83132797968 | $6,432.00 | 48 BL | 11-Apr-2018 | $6,432.00 | $0.00 | |
Rental | 2018 | 28-Apr-2017 | (REFUND) 614513444480 | PERTH | $125.25 | 151 BL | 28-Apr-2017 | $18,912.75 | $0.00 |
Rental | 2018 | 24-May-2016 | 614513444480 | $19,038.00 |
Year | Form 5 Type | Min Expd | Exp Lodged Date | Total Expd | Exemp No | Exemp Lodged | Exemp Amt | Exemp Status | Outcome Date | Exploration Activities | Mining Activities | Aboriginal Survey | Rent | Administration | Prospecting | Strike Through |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
2022 | $12,000.00 | false | ||||||||||||||
2021 | $72,000.00 | 28-May-2021 | $15,055.00 | $683.00 | $0.00 | $0.00 | $13,514.00 | $858.00 | $0.00 | false | ||||||
2020 | $48,000.00 | 10-Jun-2020 | $27,916.00 | 579657 | 10-Jun-2020 | $48,000.00 | Granted | 22-Jul-2020 | $9,468.00 | $0.00 | $0.00 | $8,848.00 | $9,600.00 | $0.00 | false | |
2019 | $48,000.00 | 24-Jun-2019 | $80,246.00 | $58,154.00 | $0.00 | $0.00 | $8,718.00 | $13,374.00 | $0.00 | false | ||||||
2018 | $151,000.00 | 18-Jun-2018 | $156,935.00 | $99,880.00 | $0.00 | $0.00 | $26,855.00 | $30,200.00 | $0.00 | false |
Referred to Native Title Date | Referral Type | Current Status | Procedure | Details | Objections | Water Comments | Determination Areas | Claims | Representative Area Bodies |
---|---|---|---|---|---|---|---|---|---|
22-Sep-2016 | Tenement Application | Expedited Procedure : Native Title Cleared - Expedited Applies | Expedited Procedure | 2016-10-192017-02-19CLEARED - Expedited Applies2017-04-27152 BL24300S116730E111km NE'ly of Gascoyne Junction | WO2017/00692017-01-27WC1997/028Objection Withdrawn Agreement2017-04-26 | Gnulli(WC1997/028)WC1997/028WAD6161/1998falseDeterminedWajarri Yamatji #1(WC2004/010)WC2004/010WAD28/2019falseDetermined | 14GeraldtonYamatji Marlpa Aboriginal Corporation |