Tenement: E09-2197

View on Landtracker Maps (logon required)

Extracted from MTO on 30-Jun-2025 00:13, last changed 30-Jun-2025.

Tenement Summary

Identifier:E 09/2197Type:Exploration Licence
Status:DeadDistrict:GASCOYNE M.F.
Lodged:ONLINEArea:46 BL
Purposes:Term:5 Years
Markout:Received:24-May-2016 11:36
Commence:28-Apr-2017 Expiry:27-Apr-2022

Holders

Company NameSharesTotal Shares
ARROW (MALINDA) PTY LTD100100

Applicants on Receival

Company NameSharesTotal Shares
SEGUE (GASCOYNE) PTY LTD100100

Shires

Shire NameShire NumberStartArea
UPPER GASCOYNE SHIRE847024-May-2016 46.00000 BL

Conditions

#VerTextStartEnd
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.28-Apr-2017
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.28-Apr-2017
31Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.28-Apr-2017
41The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.28-Apr-2017
51The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
28-Apr-2017
1In respect to the area designated as CPL 29 in TENGRAPH the following conditions apply:28-Apr-2017
61Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, DMP the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMP. The program to include:
  • maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
  • the purpose, specifications and life of all proposed disturbances;
  • proposals which may disturb any declared rare or geographically restricted flora and fauna; and
  • techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
28-Apr-2017
71The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMP. Such rehabilitation as is appropriate and may include:
  • stockpiling and return of topsoil;
  • backfilling all holes, trenches and costeans;
  • ripping;
  • contouring to the original landform;
  • revegetation with seed; and
  • capping and backfilling of all drill holes.
28-Apr-2017
81Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMP and arranging an inspection as required.28-Apr-2017

Endorsements

Cond #VerTextStartEnd
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.28-Apr-2017
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.28-Apr-2017
31Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.28-Apr-2017
41The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.28-Apr-2017
51The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
28-Apr-2017
1In respect to the area designated as CPL 29 in TENGRAPH the following conditions apply:28-Apr-2017
61Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, DMP the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMP. The program to include:
  • maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
  • the purpose, specifications and life of all proposed disturbances;
  • proposals which may disturb any declared rare or geographically restricted flora and fauna; and
  • techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
28-Apr-2017
71The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMP. Such rehabilitation as is appropriate and may include:
  • stockpiling and return of topsoil;
  • backfilling all holes, trenches and costeans;
  • ripping;
  • contouring to the original landform;
  • revegetation with seed; and
  • capping and backfilling of all drill holes.
28-Apr-2017
81Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMP and arranging an inspection as required.28-Apr-2017

Dealings

TypeNumberDetails
Application to Amend521430Lodged:15:00 10 January 2018Amending:NameFrom:NEXT ADVANCEMENTS PTY LTDTo:ARROW (MALINDA) PTY LTDAmending:Address (Including DTC Details)From:Principal Place of Business : NEXT ADVANCEMENTS PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931 and DTC :NEXT ADVANCEMENTS PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931To:Principal Place of Business : ARROW (MALINDA) PTY LTD, SAME AS CORRESPONDENCE and DTC :ARROW (MALINDA) PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxxxxx997RECORDED:15:00 10 January 2018
Partial Surrender - Voluntary527686Lodged:15:07 11 April 2018Surrendered Blocks:MEEKATHARRA 314 h, j, n, o, p MEEKATHARRA 315 q, r, s, w, x, y, z MEEKATHARRA 387 d, e MEEKATHARRA 388 a, b, c, f, g, h, j, n, o, p, u MEEKATHARRA 389 q, r, sSurrendered Total:28 BL.REGISTERED:15:07 11 April 2018
Extension of Time576184Lodged:11:58 14 April 2020Type:RentRECORDED:11:58 14 April 2020extension of time until 28 August 2020 to pay annual rentAPPROVED:14:17 28 April 2020
Surrender - Outright626441Lodged:11:17 18 June 2021REGISTERED:11:17 18 June 2021

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202209-Apr-2021 12648102721$10,948.0046 BL11-Apr-2018 $10,948.00$0.00
Rental202126-Aug-2020 56427549736$10,718.0046 BL11-Apr-2018 $10,718.00$0.00
Rental202002-Apr-2019 92460584389$6,256.0046 BL11-Apr-2018 $6,256.00$0.00
Rental201927-Apr-2018 83132797968$6,164.0046 BL11-Apr-2018 $6,164.00$0.00
Rental201828-Apr-2017 (REFUND) 614513444480PERTH$125.2574 BL28-Apr-2017 $9,268.50$0.00
Rental201824-May-2016 614513444480$9,393.75

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2022$11,500.00false
2021$69,000.0028-May-2021 $14,227.00$245.00$0.00$0.00$13,052.00$930.00$0.00false
2020$46,000.0010-Jun-2020 $27,004.0057965710-Jun-2020 $46,000.00Granted22-Jul-2020 $9,324.00$0.00$0.00$8,480.00$9,200.00$0.00false
2019$46,000.0024-Jun-2019 $56,557.00$38,776.00$0.00$0.00$8,355.00$9,426.00$0.00false
2018$74,000.0018-Jun-2018 $75,858.00$47,897.00$0.00$0.00$13,161.00$14,800.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
09-Sep-2016 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2016-10-052017-02-05CLEARED - Expedited Applies2017-04-2775 BL242829S116180E128km NE'ly of Gascoyne JunctionWO2017/00682017-01-26WC1997/028Objection Withdrawn Agreement2017-04-26Wajarri Yamatji #1(WC2004/010)WC2004/010WAD28/2019falseDeterminedGnulli(WC1997/028)WC1997/028WAD6161/1998falseDetermined14GeraldtonYamatji Marlpa Aboriginal Corporation