Tenement: E09-2191

View on Landtracker Maps (logon required)

Extracted from MTO on 05-Jul-2025 00:14, last changed 05-Jul-2025.

Tenement Summary

Identifier:E 09/2191Type:Exploration Licence
Status:DeadDistrict:GASCOYNE M.F.
Lodged:PERTHArea:70 BL
Purposes:Term:5 Years
Markout:Received:09-May-2016 09:00
Commence:29-Nov-2016 Expiry:28-Nov-2021

Holders

Company NameSharesTotal Shares
LITHOPHILE PTY LTD100100

Applicants on Receival

Company NameSharesTotal Shares
LITHOPHILE PTY LTD100100

Shires

Shire NameShire NumberStartArea
UPPER GASCOYNE SHIRE847009-May-2016 70.00000 BL

Conditions

#VerTextStartEnd
11All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.29-Nov-2016
21Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.29-Nov-2016
31The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.29-Nov-2016
41The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
29-Nov-2016
1In respect to the area designated as CPL 29 in TENGRAPH the following conditions apply:29-Nov-2016
51Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, DMP the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMP. The program to include:
  • maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
  • the purpose, specifications and life of all proposed disturbances;
  • proposals which may disturb any declared rare or geographically restricted flora and fauna; and
  • techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
29-Nov-2016
61The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMP. Such rehabilitation as is appropriate and may include:
  • stockpiling and return of topsoil;
  • backfilling all holes, trenches and costeans;
  • ripping;
  • contouring to the original landform;
  • revegetation with seed; and
  • capping and backfilling of all drill holes.
29-Nov-2016
71Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMP and arranging an inspection as required.29-Nov-2016

Endorsements

Cond #VerTextStartEnd
11All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.29-Nov-2016
21Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.29-Nov-2016
31The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.29-Nov-2016
41The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
29-Nov-2016
1In respect to the area designated as CPL 29 in TENGRAPH the following conditions apply:29-Nov-2016
51Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, DMP the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMP. The program to include:
  • maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
  • the purpose, specifications and life of all proposed disturbances;
  • proposals which may disturb any declared rare or geographically restricted flora and fauna; and
  • techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
29-Nov-2016
61The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMP. Such rehabilitation as is appropriate and may include:
  • stockpiling and return of topsoil;
  • backfilling all holes, trenches and costeans;
  • ripping;
  • contouring to the original landform;
  • revegetation with seed; and
  • capping and backfilling of all drill holes.
29-Nov-2016
71Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMP and arranging an inspection as required.29-Nov-2016

Dealings

TypeNumberDetails
Application to Amend493802Lodged:09:05 13 September 2016Amending:Address (Including DTC Details)From:Principal Place of Business : LITHOPHILE PTY LTD, ADDRESS NOT PROVIDED and DTC :LITHOPHILE PTY LTD, C/O M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008To:Principal Place of Business : LITHOPHILE PTY LTD, LEVEL 1, 675 MURRAY STREET, WEST PERTH, WA, 6005 and DTC :LITHOPHILE PTY LTD, PO BOX 1088, WEST PERTH, WA, 6872RECORDED:09:05 13 September 2016
Forfeiture527378Initiated:20/03/2018 for non-compliance with expenditure conditionsRECORDED:08:30 09 April 2018Notice Issued:Regulation 50 Notice sent 20/03/2018 for non-compliance with expenditure conditions pursuant to Reg 15.Compliance Date:19/04/2018FINALISED:Order by Minister on 28 May 2018 that E 09/2191 be Penalty Imposed
Fine531424Fine in respect to:Forfeiture Process 527378Fine reason:Non-compliance with expenditure obligationsPenalty amount:$804.00Notification date:30/05/2018Due date:04/07/2018Pursuant to:Section 96A(5)RECORDED:29 May 2018PAYMENT RECEIVED:03 July 2018FINALISED:03 July 2018Receipt Number:E09-2191 PENALTY LITHIUMAUSTRALIAAmount:$804.00Remaining balance:$0.00
Surrender - Outright565624Lodged:10:35:54 29 October 2019REJECTED:10:35:54 29 October 2019
Surrender - Outright565806Lodged:11:21:08 31 October 2019REGISTERED:11:21:08 31 October 2019

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental201905-Dec-2018 10078832$9,520.0070 BL29-Nov-2016 $9,520.00$0.00
Rental201827-Nov-2017 LITHIUM AUSTRALIA LITHIUMAUSTRALIAPERTH$9,380.0070 BL29-Nov-2016 $9,380.00$0.00
Rental201709-May-2016 06-153759PERTH$8,767.5070 BL29-Nov-2016 $8,767.50$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2019$70,000.00false
2018$70,000.0005-Dec-2018 $73,701.18$52,314.59$0.00$0.00$12,786.59$8,600.00$0.00false
2017$70,000.0018-Dec-2017 $61,952.2352069221-Dec-2017 $10,000.00Withdrawn17-Jan-2018 $37,360.02$0.00$0.00$14,292.21$10,300.00$0.00false
2017$70,000.0052038018-Dec-2017 $10,000.00Refused20-Mar-2018 false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
28-Jun-2016 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2016-07-132016-11-13CLEARED - Expedited Applies2016-11-2870 BL243329S116330E146km E'ly of Gascoyne JunctionWajarri Yamatji #1(WC2004/010)WC2004/010WAD28/2019falseDetermined14GeraldtonYamatji Marlpa Aboriginal Corporation