# | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 15-Dec-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 15-Dec-2016 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 15-Dec-2016 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 15-Dec-2016 | |
| 1 | In respect to the area designated as CPL 28 in TENGRAPH the following conditions apply: | 15-Dec-2016 | |
5 | 1 | Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, DMP the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMP. The program to include:- maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
- the purpose, specifications and life of all proposed disturbances;
- proposals which may disturb any declared rare or geographically restricted flora and fauna; and
- techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
| 15-Dec-2016 | |
6 | 1 | The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMP. Such rehabilitation as is appropriate and may include:- stockpiling and return of topsoil;
- backfilling all holes, trenches and costeans;
- ripping;
- contouring to the original landform;
- revegetation with seed; and
- capping and backfilling of all drill holes.
| 15-Dec-2016 | |
7 | 1 | Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMP and arranging an inspection as required. | 15-Dec-2016 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 15-Dec-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 15-Dec-2016 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 15-Dec-2016 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 15-Dec-2016 | |
| 1 | In respect to the area designated as CPL 28 in TENGRAPH the following conditions apply: | 15-Dec-2016 | |
5 | 1 | Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, DMP the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMP. The program to include:- maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
- the purpose, specifications and life of all proposed disturbances;
- proposals which may disturb any declared rare or geographically restricted flora and fauna; and
- techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
| 15-Dec-2016 | |
6 | 1 | The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMP. Such rehabilitation as is appropriate and may include:- stockpiling and return of topsoil;
- backfilling all holes, trenches and costeans;
- ripping;
- contouring to the original landform;
- revegetation with seed; and
- capping and backfilling of all drill holes.
| 15-Dec-2016 | |
7 | 1 | Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMP and arranging an inspection as required. | 15-Dec-2016 | |
Type | Number | Details |
Application to Amend | 486194 | Lodged:10:43:55 05 May 2016Amending:NameFrom:A.C.N. 611488932To:A.C.N. 611 488 932 PTY LTDRECORDED:10:43:55 05 May 2016 |
Application to Amend | 503153 | Lodged:15:20 22 March 2017Amending:NameFrom:A.C.N. 611 488 932 PTY LTDTo:WODGINA LITHIUM PTY LTDRECORDED:15:20 22 March 2017 |
Extension of Time | 525217 | Lodged:15:20:56 09 March 2018Type:Stat DecRECORDED:15:20:56 09 March 2018APPROVED:08:27:56 12 March 2018Time extended to 2 April 2018 |
Forfeiture | 529630 | Initiated:03/05/2018 for non-compliance with expenditure conditionsRECORDED:14:30 08 May 2018Notice Issued:Regulation 50 Notice sent 03/05/2018 for non-compliance with expenditure conditions pursuant to Reg 15.Compliance Date:02/06/2018FINALISED:Order by Minister on 15 June 2018 that E 09/2190 be Penalty Imposed |
Fine | 533788 | Fine in respect to:Forfeiture Process 529630Fine reason:Non-compliance with expenditure obligationsPenalty amount:$691.00Notification date:28/06/2018Due date:02/08/2018Pursuant to:Section 96A(5)RECORDED:27 June 2018PAYMENT RECEIVED:04 July 2018FINALISED:04 July 2018Receipt Number:84977778228Amount:$691.00Remaining balance:$0.00 |
Surrender - Outright | 547395 | Lodged:13:34:47 08 February 2019REGISTERED:13:34:47 08 February 2019 |