Extracted from MTO on 30-Jun-2025 00:19,
last changed 30-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 22-Feb-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 22-Feb-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 22-Feb-2017 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 22-Feb-2017 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 22-Feb-2017 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 22-Feb-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 22-Feb-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 22-Feb-2017 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 22-Feb-2017 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 22-Feb-2017 | |
Type | Number | Details |
Application to Amend | 493802 | Lodged:09:05 13 September 2016Amending:Address (Including DTC Details)From:Principal Place of Business : LITHIUM AUSTRALIA NL, ADDRESS NOT PROVIDED and DTC :LITHIUM AUSTRALIA NL, PO BOX 588, BELMONT, WA, 6984To:Principal Place of Business : LITHIUM AUSTRALIA NL, LEVEL 1, 675 MURRAY STREET, WEST PERTH, WA, 6005 and DTC :LITHIUM AUSTRALIA NL, PO BOX 1088, WEST PERTH, WA, 6872RECORDED:09:05 13 September 2016 |
Forfeiture | 558606 | Initiated:04/07/2019 for non-compliance with expenditure conditionsRECORDED:12:50 18 July 2019Notice Issued:Regulation 50 Notice sent 04/07/2019 for non-compliance with expenditure conditions pursuant to Reg 15.Compliance Date:08/08/2019FINALISED:Order by Minister on 21 August 2019 that E 09/2168 be Penalty Imposed |
Fine | 561046 | Fine in respect to:Forfeiture Process 558606Fine reason:Non-compliance with expenditure obligationsPenalty amount:$2,276.00Notification date:21/08/2019Due date:25/09/2019Pursuant to:Section 96A(5)RECORDED:21 August 2019PAYMENT RECEIVED:12 September 2019FINALISED:12 September 2019Receipt Number:10114521Amount:$2,276.00Remaining balance:$0.00 |
Surrender - Outright | 572717 | Lodged:08:30 21 February 2020REGISTERED:08:30 21 February 2020 |