Extracted from MTO on 09-Jul-2025 00:49,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 29-Nov-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 29-Nov-2016 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 29-Nov-2016 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 29-Nov-2016 | |
| 1 | In respect to the area designated as CPL 28 in TENGRAPH the following conditions apply: | 29-Nov-2016 | |
5 | 1 | Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, DMP the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMP. The program to include:- maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
- the purpose, specifications and life of all proposed disturbances;
- proposals which may disturb any declared rare or geographically restricted flora and fauna; and
- techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
| 29-Nov-2016 | |
6 | 1 | The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMP. Such rehabilitation as is appropriate and may include:- stockpiling and return of topsoil;
- backfilling all holes, trenches and costeans;
- ripping;
- contouring to the original landform;
- revegetation with seed; and
- capping and backfilling of all drill holes.
| 29-Nov-2016 | |
7 | 1 | Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMP and arranging an inspection as required. | 29-Nov-2016 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 29-Nov-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 29-Nov-2016 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 29-Nov-2016 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 29-Nov-2016 | |
| 1 | In respect to the area designated as CPL 28 in TENGRAPH the following conditions apply: | 29-Nov-2016 | |
5 | 1 | Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, DMP the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMP. The program to include:- maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
- the purpose, specifications and life of all proposed disturbances;
- proposals which may disturb any declared rare or geographically restricted flora and fauna; and
- techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
| 29-Nov-2016 | |
6 | 1 | The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMP. Such rehabilitation as is appropriate and may include:- stockpiling and return of topsoil;
- backfilling all holes, trenches and costeans;
- ripping;
- contouring to the original landform;
- revegetation with seed; and
- capping and backfilling of all drill holes.
| 29-Nov-2016 | |
7 | 1 | Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMP and arranging an inspection as required. | 29-Nov-2016 | |
Type | Number | Details |
Forfeiture | 526066 | Initiated:22/03/2018 for non-compliance with reporting requirementsRECORDED:13:39:29 20 March 2018Notice Issued:Regulation 50 Notice sent 22/03/2018 for non-compliance with reporting requirements pursuant to Sec 115A.Compliance Date:24/04/2018FINALISED:Order by Minister on 01 February 2019 that E 09/2167 be Penalty Imposed |
Application to Amend | 534349 | Lodged:10:16:01 05 July 2018Amending:Address (Including DTC Details)From:Principal Place of Business : HURRICANE PROSPECTING PTY LTD, SAME AS CORRESPONDENCE and DTC :HURRICANE PROSPECTING PTY LTD, 61 THE STRAND, BAYSWATER, WA, 6053To:Principal Place of Business : HURRICANE PROSPECTING PTY LTD, DEBLIN TENEMENT MANAGEMENT SERVICES, PO BOX 456, MOUNT HAWTHORN, WA, 6915, xxxx@deblin.com.au, xxxxxxx190 and DTC :HURRICANE PROSPECTING PTY LTD, THE TENEMENT MANAGER, DEBLIN TENEMENT MANAGEMENT SERVICES, PO BOX 456, MOUNT HAWTHORN, WA, 6915, xxxx@deblin.com.au, xxxxxxx190RECORDED:10:16:01 05 July 2018 |
Fine | 546967 | Fine in respect to:Forfeiture Process 526066Fine reason:Non-compliance with mineral exploration reporting provisionsPenalty amount:$630.00Notification date:01/02/2019Due date:07/03/2019Pursuant to:Section 96A(5)RECORDED:01 February 2019PAYMENT RECEIVED:01 March 2019FINALISED:01 March 2019Receipt Number:91599095272Amount:$630.00Remaining balance:$0.00 |
Forfeiture | 596252 | Initiated:22/02/2021 for non-compliance with reporting requirements( Form 5 )RECORDED:11:54:21 19 February 2021Notice Issued:Regulation 50 Notice sent 22/02/2021 for non-compliance with expenditure requirements pursuant to Reg 22/Sec 63A- late lodgement of Form 5.Compliance Date:29/03/2021FINALISED:Order by Minister on 07 April 2021 that E 09/2167 be Penalty Imposed |
Fine | 619652 | Fine in respect to:Forfeiture Process 596252Fine reason:Non-compliance with expenditure obligationsPenalty amount:$270.00Notification date:08/04/2021Due date:13/05/2021Pursuant to:Section 96A(5)RECORDED:07 April 2021PAYMENT RECEIVED:20 April 2021FINALISED:20 April 2021Receipt Number:12948566266Amount:$270.00Remaining balance:$0.00 |
Extension / Renewal of Term | 636333 | Lodged:13:11:33 23 November 2021Applied For Period:5 YearsRECORDED:13:11:33 23 November 2021GRANTED:01 December 2021Granted Period:5 YearsTerm Extended To:28/11/2026 |
Forfeiture | 649306 | Initiated:16/05/2022 for non-compliance with reporting requirementsRECORDED:07:55 16 May 2022Notice Issued:Regulation 50 Notice sent 16/05/2022 for non-compliance with reporting requirements pursuant to Sec 115A.Compliance Date:20/06/2022FINALISED:Order by Minister on 07 July 2022 that E 09/2167 be Penalty Imposed |
Fine | 653372 | Fine in respect to:Forfeiture Process 649306Fine reason:Non-compliance with mineral exploration reporting provisionsPenalty amount:$90.00Notification date:13/07/2022Due date:17/08/2022Pursuant to:Section 96A(5)RECORDED:13 July 2022PAYMENT RECEIVED:20 July 2022FINALISED:21 July 2022Receipt Number:10276814Amount:$90.00Remaining balance:$0.00 |
Extension of Time | 697021 | Lodged:09:20:10 21 February 2024Type:Form 5RECORDED:09:20:10 21 February 2024APPROVED:07:29:12 23 February 2024EOT 697021to lodge Form 5 approved to COB 22/02/2024 |
Forfeiture | 696180 | Initiated:19/04/2024 for non-compliance with reporting requirements( Form 5 )RECORDED:08:30 19 April 2024WITHDRAWN:22 April 2024 (commenced in error)Notice Issued:Regulation 50 Notice sent 19/04/2024 for non-compliance with expenditure requirements pursuant to Reg 22/Sec 63A- late lodgement of Form 5.Compliance Date:24/05/2024 |
Forfeiture | 713556 | Initiated:03/09/2024 for non-compliance with reporting requirementsRECORDED:14:18 03 September 2024FINALISED:Order by Minister on 13 November 2024 that E 09/2167 be Penalty ImposedNotice Issued:Regulation 50 Notice sent 03/09/2024 for non-compliance with reporting requirements pursuant to Sec 115A.Compliance Date:08/10/2024 |
Fine | 719825 | Fine in respect to:Forfeiture Process 713556Fine reason:Non-compliance with mineral exploration reporting provisionsPenalty amount:$1,200.00Notification date:19/11/2024Due date:06/01/2025Pursuant to:Section 96A(5)RECORDED:19 November 2024PAYMENT RECEIVED:26 November 2024FINALISED:26 November 2024Receipt Number:10710975Amount:$1,200.00Remaining balance:$0.00 |