Tenement: E09-2162

View on Landtracker Maps (logon required)

Extracted from MTO on 06-Jul-2025 01:19, last changed 28-Jun-2025.

Tenement Summary

Identifier:E 09/2162Type:Exploration Licence
Status:DeadDistrict:GASCOYNE M.F.
Lodged:PERTHArea:61 BL
Purposes:Term:5 Years
Markout:Received:09-Nov-2015 16:05
Commence:30-Aug-2017 Expiry:29-Aug-2022

Holders

Company NameSharesTotal Shares
CUNDEELEE PTY LTD100100

Applicants on Receival

Company NameSharesTotal Shares
CUNDEELEE PTY LTD100100

Shires

Shire NameShire NumberStartArea
UPPER GASCOYNE SHIRE847009-Nov-2015 61.00000 BL

Conditions

#VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.30-Aug-2017
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.30-Aug-2017
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.30-Aug-2017
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.30-Aug-2017
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.30-Aug-2017
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
30-Aug-2017
71No interference with Geodetic Survey Station SSM-GASCOYNE and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.30-Aug-2017
1In respect to the area designated as CPL 28 in TENGRAPH the following conditions apply:30-Aug-2017
81Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, DMP the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMP. The program to include:
  • maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
  • the purpose, specifications and life of all proposed disturbances;
  • proposals which may disturb any declared rare or geographically restricted flora and fauna; and
  • techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
30-Aug-2017
91The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMP. Such rehabilitation as is appropriate and may include:
  • stockpiling and return of topsoil;
  • backfilling all holes, trenches and costeans;
  • ripping;
  • contouring to the original landform;
  • revegetation with seed; and
  • capping and backfilling of all drill holes.
30-Aug-2017
101Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMP and arranging an inspection as required.30-Aug-2017

Endorsements

Cond #VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.30-Aug-2017
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.30-Aug-2017
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.30-Aug-2017
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.30-Aug-2017
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.30-Aug-2017
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
30-Aug-2017
71No interference with Geodetic Survey Station SSM-GASCOYNE and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.30-Aug-2017
1In respect to the area designated as CPL 28 in TENGRAPH the following conditions apply:30-Aug-2017
81Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, DMP the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMP. The program to include:
  • maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
  • the purpose, specifications and life of all proposed disturbances;
  • proposals which may disturb any declared rare or geographically restricted flora and fauna; and
  • techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
30-Aug-2017
91The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMP. Such rehabilitation as is appropriate and may include:
  • stockpiling and return of topsoil;
  • backfilling all holes, trenches and costeans;
  • ripping;
  • contouring to the original landform;
  • revegetation with seed; and
  • capping and backfilling of all drill holes.
30-Aug-2017
101Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMP and arranging an inspection as required.30-Aug-2017

Dealings

TypeNumberDetails
Application to Amend565094Lodged:15:41:29 18 October 2019Amending:Address (Including DTC Details)From:Principal Place of Business : CUNDEELEE PTY LTD, SAME AS CORRESPONDENCE and DTC :CUNDEELEE PTY LTD, C/- TENEMENT ADMINISTRATION SERVICES PTY LTD, LEVEL 2, 326 HAY STREET, EAST PERTH, WA, 6004To:Principal Place of Business : CUNDEELEE PTY LTD, PO BOX 376, NORTHBRIDGE, WA, 6865, xxxxxxxxx@matsa.com.au, xxxxxxx555 and DTC :CUNDEELEE PTY LTD, TENEMENTS OFFICER, PO BOX 376, NORTHBRIDGE, WA, 6865, xxxxxxxxx@matsa.com.au, xxxxxxx555RECORDED:15:41:29 18 October 2019
Surrender - Outright583910Lodged:14:01:41 10 August 2020REGISTERED:14:01:41 10 August 2020

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202001-Oct-2019 10116796$8,418.0061 BL30-Aug-2017 $8,418.00$0.00
Rental201917-Sep-2018 8759017885$8,296.0061 BL30-Aug-2017 $8,296.00$0.00
Rental201830-Aug-2017 (REFUND) 06-149974PERTH$1,127.2561 BL30-Aug-2017 $7,640.25$0.00
Rental201809-Nov-2015 06-149974PERTH$8,767.50

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2020$61,000.00false
2019$61,000.0028-Oct-2019 $52,732.3556559328-Oct-2019 $61,000.00Granted09-Dec-2019 $29,267.75$0.00$0.00$11,264.60$12,200.00$0.00false
2018$61,000.0024-Oct-2018 $64,013.42$41,218.72$0.00$0.00$10,594.70$12,200.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
19-Feb-2016 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2016-03-092016-07-09CLEARED - Expedited Applies2017-08-2970 BL245329S1163930E147km E'ly of Gascoyne JunctionWO2016/04412016-07-05WC2004/010Objection Dismissed Sec 148(b)2017-08-29Wajarri Yamatji #1(WC2004/010)WC2004/010WAD28/2019trueDetermined14GeraldtonYamatji Marlpa Aboriginal Corporation