Extracted from MTO on 16-Jul-2025 01:26,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 15-Sep-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 15-Sep-2016 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 15-Sep-2016 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 15-Sep-2016 | |
5 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 26-Nov-2021 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 15-Sep-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 15-Sep-2016 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 15-Sep-2016 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 15-Sep-2016 | |
5 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 26-Nov-2021 | |
Type | Number | Details |
Extension / Renewal of Term | 631800 | Lodged:14:25:18 03 September 2021Applied For Period:2 YearsRECORDED:14:25:18 03 September 2021GRANTED:22 November 2021Granted Period:5 YearsTerm Extended To:14/09/2026 |
Partial Surrender - Voluntary | 658521 | Lodged:14:09:24 13 September 2022Surrendered Blocks:MEEKATHARRA 460 d, e
MEEKATHARRA 461 a, g, h, nSurrendered Total:6 BL.REGISTERED:14:09:24 13 September 2022 |
Application to Amend | 678867 | Lodged:08:30 20 June 2023Amending:Address (Including DTC Details)From:ZEUS RESOURCES LIMITED, C/- TENEMENT ADMINISTRATION SERVICES PTY LTD, LEVEL 2, 326 HAY STREET, EAST PERTH, WA, 6004To:ZEUS RESOURCES LIMITED, AURORA TENEMENT CONSULTING PTY LTD, C/- AURORA TENEMENT CONSULTING PTY LTD, PO BOX 1907, WEST PERTH, WA, 6872, xxxxxx@auroratenements.com, xxxxxxx800RECORDED:08:30 20 June 2023 |
Application to Amend | 734434 | Lodged:11:26:51 27 May 2025Amending:Address (Including DTC Details)From:ZEUS RESOURCES LIMITED, ADDRESS NOT PROVIDEDTo:ZEUS RESOURCES LIMITED, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997RECORDED:11:26:51 27 May 2025 |
Application to Amend | 736187 | Lodged:12:42:08 19 June 2025Amending:Address (Including DTC Details)From:ZEUS RESOURCES LIMITED, AURORA TENEMENT CONSULTING PTY LTD, C/- AURORA TENEMENT CONSULTING PTY LTD, PO BOX 1907, WEST PERTH, WA, 6872, xxxxxx@auroratenements.com, xxxxxxx800To:ZEUS RESOURCES LIMITED, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997RECORDED:12:42:08 19 June 2025 |