Extracted from MTO on 04-Jul-2025 00:20,
last changed 04-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 25-Oct-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 25-Oct-2016 | |
| 1 | In respect to the area designated as CPL 10 in TENGRAPH the following conditions apply: | 25-Oct-2016 | |
3 | 1 | Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, DMP the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMP. The program to include:- maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
- the purpose, specifications and life of all proposed disturbances;
- proposals which may disturb any declared rare or geographically restricted flora and fauna; and
- techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
| 25-Oct-2016 | |
4 | 1 | The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMP. Such rehabilitation as is appropriate and may include:- stockpiling and return of topsoil;
- backfilling all holes, trenches and costeans;
- ripping;
- contouring to the original landform;
- revegetation with seed; and
- capping and backfilling of all drill holes.
| 25-Oct-2016 | |
5 | 1 | Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMP and arranging an inspection as required. | 25-Oct-2016 | |
6 | 1 | Mining on any road, road verge or road reserve being confined to below a depth of 15 metres from the natural surface. | 25-Oct-2016 | |
7 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 25-Oct-2016 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 25-Oct-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 25-Oct-2016 | |
| 1 | In respect to the area designated as CPL 10 in TENGRAPH the following conditions apply: | 25-Oct-2016 | |
3 | 1 | Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, DMP the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMP. The program to include:- maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
- the purpose, specifications and life of all proposed disturbances;
- proposals which may disturb any declared rare or geographically restricted flora and fauna; and
- techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
| 25-Oct-2016 | |
4 | 1 | The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMP. Such rehabilitation as is appropriate and may include:- stockpiling and return of topsoil;
- backfilling all holes, trenches and costeans;
- ripping;
- contouring to the original landform;
- revegetation with seed; and
- capping and backfilling of all drill holes.
| 25-Oct-2016 | |
5 | 1 | Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMP and arranging an inspection as required. | 25-Oct-2016 | |
6 | 1 | Mining on any road, road verge or road reserve being confined to below a depth of 15 metres from the natural surface. | 25-Oct-2016 | |
7 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 25-Oct-2016 | |
Type | Number | Details |
Forfeiture | 550897 | Initiated:13/03/2019 for non-compliance with expenditure conditionsRECORDED:12:10:07 21 December 2018Notice Issued:Regulation 50 Notice sent 13/03/2019 for non-compliance with expenditure conditions pursuant to Reg 21 & 22.Compliance Date:17/04/2019FINALISED:Order by Minister on 17 May 2019 that E 09/2143 be Penalty Imposed |
Fine | 553998 | Fine in respect to:Forfeiture Process 550897Fine reason:Non-compliance with expenditure obligationsPenalty amount:$650.00Notification date:17/05/2019Due date:21/06/2019Pursuant to:Section 96A(5)RECORDED:17 May 2019PAYMENT RECEIVED:27 May 2019FINALISED:27 May 2019Receipt Number:10098042Amount:$650.00Remaining balance:$0.00 |
Surrender - Outright | 568054 | Lodged:15:15:08 04 December 2019REGISTERED:15:15:08 04 December 2019 |