Tenement: E09-2143

View on Landtracker Maps (logon required)

Extracted from MTO on 04-Jul-2025 00:20, last changed 04-Jul-2025.

Tenement Summary

Identifier:E 09/2143Type:Exploration Licence
Status:DeadDistrict:GASCOYNE M.F.
Lodged:ONLINEArea:7 BL
Purposes:Term:5 Years
Markout:Received:22-May-2015 13:18
Commence:25-Oct-2016 Expiry:24-Oct-2021

Holders

Company NameSharesTotal Shares
SORRENTO RESOURCES PTY LTD100100

Applicants on Receival

Company NameSharesTotal Shares
SORRENTO RESOURCES PTY LTD100100

Shires

Shire NameShire NumberStartArea
UPPER GASCOYNE SHIRE847022-May-2015 7.00000 BL

Conditions

#VerTextStartEnd
11All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.25-Oct-2016
21Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.25-Oct-2016
1In respect to the area designated as CPL 10 in TENGRAPH the following conditions apply:25-Oct-2016
31Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, DMP the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMP. The program to include:
  • maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
  • the purpose, specifications and life of all proposed disturbances;
  • proposals which may disturb any declared rare or geographically restricted flora and fauna; and
  • techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
25-Oct-2016
41The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMP. Such rehabilitation as is appropriate and may include:
  • stockpiling and return of topsoil;
  • backfilling all holes, trenches and costeans;
  • ripping;
  • contouring to the original landform;
  • revegetation with seed; and
  • capping and backfilling of all drill holes.
25-Oct-2016
51Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMP and arranging an inspection as required.25-Oct-2016
61Mining on any road, road verge or road reserve being confined to below a depth of 15 metres from the natural surface.25-Oct-2016
71No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface.25-Oct-2016

Endorsements

Cond #VerTextStartEnd
11All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.25-Oct-2016
21Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.25-Oct-2016
1In respect to the area designated as CPL 10 in TENGRAPH the following conditions apply:25-Oct-2016
31Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, DMP the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMP. The program to include:
  • maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
  • the purpose, specifications and life of all proposed disturbances;
  • proposals which may disturb any declared rare or geographically restricted flora and fauna; and
  • techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
25-Oct-2016
41The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMP. Such rehabilitation as is appropriate and may include:
  • stockpiling and return of topsoil;
  • backfilling all holes, trenches and costeans;
  • ripping;
  • contouring to the original landform;
  • revegetation with seed; and
  • capping and backfilling of all drill holes.
25-Oct-2016
51Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMP and arranging an inspection as required.25-Oct-2016
61Mining on any road, road verge or road reserve being confined to below a depth of 15 metres from the natural surface.25-Oct-2016
71No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface.25-Oct-2016

Dealings

TypeNumberDetails
Forfeiture550897Initiated:13/03/2019 for non-compliance with expenditure conditionsRECORDED:12:10:07 21 December 2018Notice Issued:Regulation 50 Notice sent 13/03/2019 for non-compliance with expenditure conditions pursuant to Reg 21 & 22.Compliance Date:17/04/2019FINALISED:Order by Minister on 17 May 2019 that E 09/2143 be Penalty Imposed
Fine553998Fine in respect to:Forfeiture Process 550897Fine reason:Non-compliance with expenditure obligationsPenalty amount:$650.00Notification date:17/05/2019Due date:21/06/2019Pursuant to:Section 96A(5)RECORDED:17 May 2019PAYMENT RECEIVED:27 May 2019FINALISED:27 May 2019Receipt Number:10098042Amount:$650.00Remaining balance:$0.00
Surrender - Outright568054Lodged:15:15:08 04 December 2019REGISTERED:15:15:08 04 December 2019

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202024-Oct-2019 10119759$1,631.007 BL25-Oct-2016 $1,631.00$0.00
Rental201902-Oct-2018 3912938911$952.007 BL25-Oct-2016 $952.00$0.00
Rental201808-Nov-2017 EFT$938.007 BL25-Oct-2016 $938.00$0.00
Rental201722-May-2015 514215552825$854.707 BL25-Oct-2016 $854.70$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2020$5,000.0019-Dec-2019 $2,631.00$0.00$0.00$0.00$1,631.00$1,000.00$0.00false
2019$20,000.0009-Dec-2019 $5,402.00$0.00$0.00$0.00$1,402.00$4,000.00$0.00false
2018$20,000.0021-Dec-2018 $15,145.1454537621-Dec-2018 $20,000.00Refused13-Mar-2019 $9,787.14$0.00$0.00$1,358.00$4,000.00$0.00false
2017$20,000.0022-Dec-2017 $25,324.70$20,050.00$0.00$0.00$1,274.70$4,000.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
22-Jul-2015 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2015-08-122015-12-12CLEARED - Expedited Applies2016-10-247 BL24130S116260E155km NE'ly of Gascoyne JunctionWO2015/09482015-11-30WC2004/010Objection Withdrawn No Agreement2016-10-24WO2015/09612015-11-30WC1997/028Objection Withdrawn No Agreement2016-10-24Gnulli(WC1997/028)WC1997/028WAD6161/1998falseDeterminedWajarri Yamatji #1(WC2004/010)WC2004/010WAD28/2019falseDetermined14GeraldtonYamatji Marlpa Aboriginal Corporation