Extracted from MTO on 09-Jul-2025 01:20,
last changed 04-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 07-Sep-2015 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 07-Sep-2015 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 07-Sep-2015 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 07-Sep-2015 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 07-Sep-2015 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 07-Sep-2015 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 07-Sep-2015 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 07-Sep-2015 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 07-Sep-2015 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 07-Sep-2015 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 07-Sep-2015 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 07-Sep-2015 | |
Type | Number | Details |
Application to Amend | 526837 | Lodged:14:50:57 29 March 2018Amending:Address (Including DTC Details)From:Principal Place of Business : GASCOYNE METALS PTY LTD, SAME AS CORRESPONDENCE and DTC :GASCOYNE METALS PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:Principal Place of Business : GASCOYNE METALS PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400 and DTC :GASCOYNE METALS PTY LTD, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400RECORDED:14:50:57 29 March 2018 |
Extension / Renewal of Term | 585530 | Lodged:16:18:16 03 September 2020Applied For Period:5 YearsRECORDED:16:18:16 03 September 2020GRANTED:23 November 2020Granted Period:5 YearsTerm Extended To:06/09/2025 |
Forfeiture | 618810 | Initiated:09/03/2021 for non-compliance with expenditure conditionsRECORDED:16:15:23 05 November 2020Notice Issued:Regulation 50 Notice sent 09/03/2021 for non-compliance with expenditure conditions pursuant to Reg 15.Compliance Date:13/04/2021FINALISED:Order by Minister on 06 May 2021 that E 09/2137 be Penalty Imposed |
Extension of Time | 589766 | Lodged:14:54:06 06 November 2020Type:Form 5RECORDED:14:54:06 06 November 2020APPROVED:11:58:11 09 November 2020Time to lodged extended to 20 November 2020 |
Conversion | 591649 | Section:S67Application Date:13:27:27 30 Nov 2020New Tenement:G 09/25Converted 00:00 26 July 2021 being commencement of term of G 09/25 |
Fine | 621859 | Fine in respect to:Forfeiture Process 618810Fine reason:Non-compliance with expenditure obligationsPenalty amount:$2,318.00Notification date:07/05/2021Due date:11/06/2021Pursuant to:Section 96A(5)RECORDED:06 May 2021PAYMENT RECEIVED:01 June 2021FINALISED:01 June 2021Receipt Number:10199254Amount:$2,318.00Remaining balance:$0.00 |
Partial Surrender - Compulsory | 631738 | Lodged:15:36:17 02 September 2021Section:Section 65 (3)Surrendered Blocks:HAMERSLEY RANGE 3341 s, x, y
HAMERSLEY RANGE 3413 c, dSurrendered Total:5 BL.REGISTERED:Midnight 06 September 2021Surrendered area to be released 08:30:00 23/09/2021 under Section 65 (3)Surrendered area released 08:30:00 23/09/2021 under Section 65 (3) |