# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 23-Feb-2016 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 23-Feb-2016 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 23-Feb-2016 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 23-Feb-2016 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 23-Feb-2016 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 23-Feb-2016 | |
7 | 1 | In respect of the area covered by this licence if the Wajarri Yamatji (being the applicants in Federal Court Application No/s. WAD6033/1998 send a request by pre-paid post to the licensee's or agent's address, not more than ninety days after the grant of this licence, the licensee shall within thirty days of the request execute in favour of Wajarri Yamatji the Regional Standard Heritage Agreement (RSHA) endorsed by peak industry groups and the Yamatji Marlpa Aboriginal Corporation. | 23-Feb-2016 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 23-Feb-2016 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 23-Feb-2016 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 23-Feb-2016 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 23-Feb-2016 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 23-Feb-2016 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 23-Feb-2016 | |
7 | 1 | In respect of the area covered by this licence if the Wajarri Yamatji (being the applicants in Federal Court Application No/s. WAD6033/1998 send a request by pre-paid post to the licensee's or agent's address, not more than ninety days after the grant of this licence, the licensee shall within thirty days of the request execute in favour of Wajarri Yamatji the Regional Standard Heritage Agreement (RSHA) endorsed by peak industry groups and the Yamatji Marlpa Aboriginal Corporation. | 23-Feb-2016 | |
Type | Number | Details |
Application to Amend | 490328 | Lodged:15:05 08 July 2016Amending:Address (Including DTC Details)From:MUGGON COPPER PTY LTD, C/- PO BOX 1340, PERTH, WA, 6872To:MUGGON COPPER PTY LTD, C/- PO BOX 1760, MANDURAH, WA, 6210RECORDED:15:05 08 July 2016 |
Application to Amend | 503260 | Lodged:15:05 24 March 2017Amending:Address (Including DTC Details)From:MUGGON COPPER PTY LTD, C/- PO BOX 1760, MANDURAH, WA, 6210To:MUGGON COPPER PTY LTD, C/- ANDERSON'S TENEMENT MANAGEMENT, PO BOX 2162, WARWICK, WA, 6024, xxxxxx@atmwa.net.auRECORDED:15:05 24 March 2017 |
Extension of Time | 550907 | Lodged:15:25 03 April 2019Type:RentRECORDED:15:25 03 April 2019LAPSED:09:10:20 13 May 2019 |
Extension / Renewal of Term | 595371 | Lodged:13:31:22 05 February 2021Applied For Period:5 YearsRECORDED:13:31:22 05 February 2021 |