1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 23-Feb-2016 | |
2 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 27-Aug-2024 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 23-Feb-2016 | 26-Aug-2024 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 23-Feb-2016 | |
4 | 2 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 27-Aug-2024 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 23-Feb-2016 | 26-Aug-2024 |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 23-Feb-2016 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 23-Feb-2016 | |
7 | 1 | In respect of the area covered by this licence if the Wajarri Yamatji (being the applicants in Federal Court Application No/s. WAD6033/1998 send a request by pre-paid post to the licensee's or agent's address, not more than ninety days after the grant of this licence, the licensee shall within thirty days of the request execute in favour of Wajarri Yamatji the Regional Standard Heritage Agreement (RSHA) endorsed by peak industry groups and the Yamatji Marlpa Aboriginal Corporation. | 23-Feb-2016 | |
8 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 27-Aug-2024 | |
9 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 27-Aug-2024 | |
10 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 27-Aug-2024 | |
11 | 1 | Scrape and detecting and dry blowing operations are to be progressively rehabilitated so that no more than two hectares will be open (meaning disturbed without rehabilitation works being completed) at any one time. | 27-Aug-2024 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 23-Feb-2016 | |
2 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 27-Aug-2024 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 23-Feb-2016 | 26-Aug-2024 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 23-Feb-2016 | |
4 | 2 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 27-Aug-2024 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 23-Feb-2016 | 26-Aug-2024 |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 23-Feb-2016 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 23-Feb-2016 | |
7 | 1 | In respect of the area covered by this licence if the Wajarri Yamatji (being the applicants in Federal Court Application No/s. WAD6033/1998 send a request by pre-paid post to the licensee's or agent's address, not more than ninety days after the grant of this licence, the licensee shall within thirty days of the request execute in favour of Wajarri Yamatji the Regional Standard Heritage Agreement (RSHA) endorsed by peak industry groups and the Yamatji Marlpa Aboriginal Corporation. | 23-Feb-2016 | |
8 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 27-Aug-2024 | |
9 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 27-Aug-2024 | |
10 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 27-Aug-2024 | |
11 | 1 | Scrape and detecting and dry blowing operations are to be progressively rehabilitated so that no more than two hectares will be open (meaning disturbed without rehabilitation works being completed) at any one time. | 27-Aug-2024 | |
Type | Number | Details |
Application to Amend | 490328 | Lodged:15:05 08 July 2016Amending:Address (Including DTC Details)From:MUGGON COPPER PTY LTD, C/- PO BOX 1340, PERTH, WA, 6872To:MUGGON COPPER PTY LTD, C/- PO BOX 1760, MANDURAH, WA, 6210RECORDED:15:05 08 July 2016 |
Application to Amend | 503260 | Lodged:15:05 24 March 2017Amending:Address (Including DTC Details)From:MUGGON COPPER PTY LTD, C/- PO BOX 1760, MANDURAH, WA, 6210To:MUGGON COPPER PTY LTD, C/- ANDERSON'S TENEMENT MANAGEMENT, PO BOX 2162, WARWICK, WA, 6024, xxxxxx@atmwa.net.auRECORDED:15:05 24 March 2017 |
Extension of Time | 550907 | Lodged:15:25 03 April 2019Type:RentRECORDED:15:25 03 April 2019LAPSED:09:10:20 13 May 2019 |
Extension / Renewal of Term | 595371 | Lodged:13:31:22 05 February 2021Applied For Period:5 YearsRECORDED:13:31:22 05 February 2021GRANTED:19 April 2021Granted Period:5 YearsTerm Extended To:22/02/2026 |
Application to Amend | 636594 | Lodged:12:59:08 26 November 2021Amending:Address (Including DTC Details)From:MUGGON COPPER PTY LTD, C/- ANDERSON'S TENEMENT MANAGEMENT, PO BOX 2162, WARWICK, WA, 6024, xxxxxx@atmwa.net.auTo:MUGGON COPPER PTY LTD, MATTHEW CLOHESSY, C/- EMERALD TENEMENT SERVICES, PO BOX 383, NORTH PERTH, WA, 6906, xxxxxxx@iinet.net.au, xxxxxxx912REJECTED:12:59:08 26 November 2021 |
Application to Amend | 640093 | Lodged:15:40 21 January 2022Amending:Address (Including DTC Details)From:Principal Place of Business : MUGGON COPPER PTY LTD, ADDRESS NOT PROVIDED and DTC :MUGGON COPPER PTY LTD, C/- ANDERSON'S TENEMENT MANAGEMENT, PO BOX 2162, WARWICK, WA, 6024, xxxxxx@atmwa.net.auTo:Principal Place of Business : MUGGON COPPER PTY LTD, C/- EMERALD TENEMENT SERVICES, PO BOX 383, NORTH PERTH, WA, 6906 and DTC :MUGGON COPPER PTY LTD, C/- EMERALD TENEMENT SERVICES, PO BOX 383, NORTH PERTH, WA, 6906RECORDED:15:40 21 January 2022 |
Partial Surrender - Voluntary | 641795 | Lodged:15:05 18 February 2022Surrendered Blocks:MEEKATHARRA 2538 h, m, n, q, r, vSurrendered Total:6 BL.REGISTERED:15:05 18 February 2022 |
Forfeiture | 651845 | Initiated:22/06/2022 for non-compliance with reporting requirementsRECORDED:09:51 22 June 2022FINALISED:Order by Minister on 26 October 2022 that E 09/2131 be Penalty ImposedNotice Issued:Regulation 50 Notice sent 22/06/2022 for non-compliance with reporting requirements pursuant to Sec 115A.Compliance Date:27/07/2022 |
Fine | 662208 | Fine in respect to:Forfeiture Process 651845Fine reason:Non-compliance with mineral exploration reporting provisionsPenalty amount:$1,260.00Notification date:31/10/2022Due date:05/12/2022Pursuant to:Section 96A(5)RECORDED:31 October 2022PAYMENT RECEIVED:23 November 2022FINALISED:23 November 2022Receipt Number:28810971281Amount:$1,260.00Remaining balance:$0.00 |
Forfeiture | 686345 | Initiated:21/09/2023 for non-compliance with reporting requirementsRECORDED:10:05:10 20 September 2023FINALISED:Order by Minister on 19 December 2023 that E 09/2131 be Penalty ImposedNotice Issued:Regulation 50 Notice sent 21/09/2023 for non-compliance with reporting requirements pursuant to Sec 115A.Compliance Date:26/10/2023 |
Fine | 692979 | Fine in respect to:Forfeiture Process 686345Fine reason:Non-compliance with mineral exploration reporting provisionsPenalty amount:$400.00Notification date:21/12/2023Due date:05/02/2024Pursuant to:Section 96A(5)RECORDED:21 December 2023PAYMENT RECEIVED:02 February 2024FINALISED:02 February 2024Receipt Number:40866210821Amount:$400.00Remaining balance:$0.00 |
Excess Tonnage | 695090 | Lodged:11:38:53 29 January 2024RECORDED:11:38:53 29 January 2024Approved Additional Tonnes:5,720GRANTED:15:44:28 12 March 2024 |
Excess Tonnage | 701943 | Lodged:10:37:41 22 April 2024RECORDED:10:37:41 22 April 2024WITHDRAWN:14:09:49 29 May 2024 |
Excess Tonnage | 701944 | Lodged:10:37:41 22 April 2024RECORDED:10:37:41 22 April 2024WITHDRAWN:14:10:04 29 May 2024 |
Excess Tonnage | 705153 | Lodged:10:38:22 28 May 2024RECORDED:10:38:22 28 May 2024Approved Additional Tonnes:3,035.13GRANTED:16:30:32 20 June 2024 |
Forfeiture | 730861 | Initiated:14/04/2025 for non-compliance with rent requirementsRECORDED:08:00 16 April 2025FINALISED:Order by Minister on 28 May 2025 that E 09/2131 be Penalty ImposedNotice Issued:Regulation 50 Notice sent 14/04/2025 for non-compliance with rent requirements pursuant to Reg 109/Sec 63A- late payment of rent.Compliance Date:20/05/2025 |
Fine | 734743 | Fine in respect to:Forfeiture Process 730861Fine reason:Non-compliance with rent obligationsPenalty amount:$1,176.00Notification date:30/05/2025Due date:07/07/2025Pursuant to:Section 96A(5)RECORDED:30 May 2025PAYMENT RECEIVED:04 July 2025FINALISED:04 July 2025Receipt Number:54969867343Amount:$1,176.00Remaining balance:$0.00 |