Extracted from MTO on 04-Jul-2025 01:02,
last changed 02-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 12-Jun-2015 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 12-Jun-2015 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 12-Jun-2015 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Jun-2015 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 12-Jun-2015 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 12-Jun-2015 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 12-Jun-2015 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 12-Jun-2015 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 12-Jun-2015 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Jun-2015 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 12-Jun-2015 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 12-Jun-2015 | |
Type | Number | Details |
Application to Amend | 478374 | Lodged:10:40:27 04 December 2015Amending:NameFrom:HASTINGS RARE METALS LTDTo:HASTINGS TECHNOLOGY METALS LTDRECORDED:10:40:27 04 December 2015 |
Application to Amend | 526843 | Lodged:15:21:37 29 March 2018Amending:Address (Including DTC Details)From:Principal Place of Business : GASCOYNE METALS PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947 and DTC :GASCOYNE METALS PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:Principal Place of Business : GASCOYNE METALS PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400 and DTC :GASCOYNE METALS PTY LTD, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400RECORDED:15:21:37 29 March 2018 |
Extension of Time | 536928 | Lodged:15:51:01 10 August 2018Type:Form 5RECORDED:15:51:01 10 August 2018APPROVED:11:32:57 14 August 2018Time to lodge extended to 17/08/2018 |
Extension / Renewal of Term | 579728 | Lodged:10:30:02 11 June 2020Applied For Period:5 YearsRECORDED:10:30:02 11 June 2020GRANTED:13 August 2020Granted Period:5 YearsTerm Extended To:11/06/2025 |
Extension of Time | 585664 | Lodged:12:09:45 07 September 2020Type:Stat DecRECORDED:12:09:45 07 September 2020APPROVED:14:14:47 07 September 2020Time to lodged extended to 25/09/2020 |
Conversion | 591644 | New Tenement:M 09/179Application Date:13:50:03 30 Nov 2020Section:S67Converted 00:00 11 July 2022 being commencement of term of M 09/179 |
Conversion | 591649 | New Tenement:G 09/25Application Date:13:27:27 30 Nov 2020Section:S67Converted 00:00 26 July 2021 being commencement of term of G 09/25 |
Extension / Renewal of Term | 735008 | Lodged:11:33:50 04 June 2025Applied For Period:2 YearsRECORDED:11:33:50 04 June 2025 |