Extracted from MTO on 16-May-2022 07:37,
last changed 01-Feb-2022.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 15-Jul-2015 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 15-Jul-2015 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 15-Jul-2015 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 15-Jul-2015 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 15-Jul-2015 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 15-Jul-2015 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 15-Jul-2015 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 15-Jul-2015 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 15-Jul-2015 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 15-Jul-2015 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 15-Jul-2015 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 15-Jul-2015 | |
Type | Number | Details |
Application to Amend | 449820 | Lodged:12:30 27 June 2014REJECTED:12:30 27 June 2014 |
Application to Amend | 450059 | Lodged:12:25 02 July 2014Amending the "Attachment 1" to include "Meekatharra 527 v"RECORDED:12:25 02 July 2014 |
Application to Amend | 450689 | Lodged:13:30 14 July 2014Amending:AddressFrom:AUDALIA RESOURCES LIMITED, C/- ROBBIE COOPER, PO BOX 1098, COOMA, NSW, 2630To:AUDALIA RESOURCES LIMITED, PO BOX 354, WEST PERTH, WA, 6872RECORDED:13:30 14 July 2014 |
Application to Amend | 528400 | Lodged:11:35 19 April 2018Amending:NameFrom:SERENA MINERALS PTY LTDTo:SERENA MINERALS LIMITEDRECORDED:11:35 19 April 2018 |
Extension / Renewal of Term | 581743 | Lodged:11:24:52 09 July 2020Applied For Period:5 YearsRECORDED:11:24:52 09 July 2020GRANTED:14 September 2020Granted Period:5 YearsTerm Extended To:14/07/2025 |
Forfeiture | 586405 | Initiated:18/09/2020 for non-compliance with rent requirementsRECORDED:11:00 18 September 2020Notice Issued:Regulation 50 Notice sent 18/09/2020 for non-compliance with rent requirements pursuant to Reg 109/Sec 82(1)- non payment of rent.Compliance Date:23/10/2020FINALISED:Order by Minister on 12 November 2020 that E 09/2102 be Penalty Imposed |
Fine | 590090 | Fine in respect to:Forfeiture Process 586405Fine reason:Non-compliance with rent obligationsPenalty amount:$683.00Notification date:17/11/2020Due date:22/12/2020Pursuant to:Section 96A(5)RECORDED:12 November 2020PAYMENT RECEIVED:23 November 2020FINALISED:23 November 2020Receipt Number:10173205Amount:$683.00Remaining balance:$0.00 |
Partial Surrender - Voluntary | 628136 | Lodged:13:32:55 14 July 2021Surrendered Blocks:MEEKATHARRA 527 z
MEEKATHARRA 598 b, c, d, e, g, h, j, k, m, n, o, p
MEEKATHARRA 599 a, b, c, d, e, f, g, h, j, k, l, m, n, o, pSurrendered Total:28 BL.REGISTERED:13:32:55 14 July 2021 |