Tenement: E09-2082

View on Landtracker Maps (logon required)

Extracted from MTO on 28-Jun-2025 00:24, last changed 28-Jun-2025.

Tenement Summary

Identifier:E 09/2082Type:Exploration Licence
Status:DeadDistrict:GASCOYNE M.F.
Lodged:ONLINEArea:2 BL
Purposes:Term:5 Years
Markout:Received:30-Dec-2013 10:52
Commence:08-May-2015 Expiry:07-May-2020

Holders

Company NameSharesTotal Shares
KAPITANY, Tamas100100

Applicants on Receival

Company NameSharesTotal Shares
KAPITANY, Tamas100100

Shires

Shire NameShire NumberStartArea
UPPER GASCOYNE SHIRE847030-Dec-2013 2.00000 BL

Conditions

#VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.08-May-2015
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.08-May-2015
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.08-May-2015
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.08-May-2015
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.08-May-2015
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
08-May-2015
71No interference with Geodetic Survey Station SSM-WOORAMEL 79 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.08-May-2015
81No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within Petroleum Pipeline Licence No 40 as shown in TENGRAPH.08-May-2015
91No surface excavation approaching closer to the boundary of the Safety Zone established by condition 8 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMP08-May-2015
101No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 8 hereof without the prior approval of the operators of the Gas/Petroleum pipeline.08-May-2015
111The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 8 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMP08-May-2015
121No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director Petroleum DMP.08-May-2015
131Mining on the Safety Zone established in Condition 8 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMP .08-May-2015
141The rights of ingress to and egress from the pipeline easement established in Condition 8 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline.08-May-2015
151Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline.08-May-2015
161In respect of the area covered by the licence the licensee, if so requested in writing by the Gnulli, the applicant in the Federal Court application no. WAD 6161 of 1998 (WC1997/028), such request being sent by pre-paid post to reach the licensee's address, not more than ninety days after the grant of this licence, shall within thirty days of the request execute in favour of the Gnulli, the Regional Standard Heritage Agreement endorsed by peak industry groups and the Yamatji Marlpa Aboriginal Corporation.08-May-2015

Endorsements

Cond #VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.08-May-2015
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.08-May-2015
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.08-May-2015
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.08-May-2015
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.08-May-2015
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
08-May-2015
71No interference with Geodetic Survey Station SSM-WOORAMEL 79 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.08-May-2015
81No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within Petroleum Pipeline Licence No 40 as shown in TENGRAPH.08-May-2015
91No surface excavation approaching closer to the boundary of the Safety Zone established by condition 8 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMP08-May-2015
101No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 8 hereof without the prior approval of the operators of the Gas/Petroleum pipeline.08-May-2015
111The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 8 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMP08-May-2015
121No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director Petroleum DMP.08-May-2015
131Mining on the Safety Zone established in Condition 8 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMP .08-May-2015
141The rights of ingress to and egress from the pipeline easement established in Condition 8 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline.08-May-2015
151Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline.08-May-2015
161In respect of the area covered by the licence the licensee, if so requested in writing by the Gnulli, the applicant in the Federal Court application no. WAD 6161 of 1998 (WC1997/028), such request being sent by pre-paid post to reach the licensee's address, not more than ninety days after the grant of this licence, shall within thirty days of the request execute in favour of the Gnulli, the Regional Standard Heritage Agreement endorsed by peak industry groups and the Yamatji Marlpa Aboriginal Corporation.08-May-2015

Dealings

TypeNumberDetails
Forfeiture537292Initiated:20/08/2018 for non-compliance with reporting requirements( Form 5 )RECORDED:08:15:41 17 August 2018Notice Issued:Regulation 50 Notice sent 20/08/2018 for non-compliance with expenditure requirements pursuant to Reg 22/Sec 63A- non lodgement of Form 5.Compliance Date:25/09/2018FINALISED:Order by Minister on 05 October 2018 that E 09/2082 be Penalty Imposed
Fine540212Fine in respect to:Forfeiture Process 537292Fine reason:Non-compliance with expenditure obligationsPenalty amount:$480.00Notification date:09/10/2018Due date:13/11/2018Pursuant to:Section 96A(5)RECORDED:08 October 2018PAYMENT RECEIVED:13 October 2018FINALISED:13 October 2018Receipt Number:87697093077Amount:$480.00Remaining balance:$0.00
Expiry - Full578259EFFECTIVE:Midnight 07 May 2020

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202006-May-2019 10094978$440.002 BL08-May-2015 $440.00$0.00
Rental201907-May-2018 83404194719$416.002 BL08-May-2015 $416.00$0.00
Rental201809-May-2017 MT-210011059362-DD$259.002 BL08-May-2015 $259.00$0.00
Rental201716-May-2016 MT-210010604585-DD$250.502 BL08-May-2015 $250.50$0.00
Rental201630-Dec-2013 336413472235$238.002 BL08-May-2015 $238.00$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2020$20,000.00false
2019$20,000.0017-May-2019 $21,345.79$0.00$0.00$0.00$0.00$0.00$21,345.79false
2018$15,000.0031-Aug-2018 $16,216.00$0.00$0.00$0.00$0.00$0.00$16,216.00false
2017$15,000.0009-May-2017 $18,659.00$17,400.00$0.00$0.00$259.00$1,000.00$0.00false
2016$15,000.0005-May-2016 $15,500.50$14,250.00$0.00$0.00$250.50$1,000.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
28-Feb-2014 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2014-03-262014-07-26CLEARED - Expedited Applies2015-05-082 BL25429S114570E26km W'ly of Gascoyne JunctionWO2014/05972014-07-09WC1997/028Objection Withdrawn Agreement2015-05-08Gnulli(WC1997/028)WC1997/028WAD6161/1998trueDetermined14GeraldtonYamatji Marlpa Aboriginal Corporation