Tenement Summary

Identifier:E 09/2062Type:Exploration Licence
Status:DeadDistrict:GASCOYNE M.F.
Lodged:ONLINEArea:16 BL
Purposes:Term:5 Years
Markout:Received:29-May-2013 08:30
Commence:12-Mar-2014 Expiry:11-Mar-2019

Holders

Company NameSharesTotal Shares
MINGS MINING RESOURCES PTY LTD100100

Applicants on Receival

Company NameSharesTotal Shares
MINGS MINING RESOURCES PTY LTD100100

Shires

Shire NameShire NumberStartArea
UPPER GASCOYNE SHIRE847029-May-2013 16.00000 BL

Conditions

#VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.12-Mar-2014
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.12-Mar-2014
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.12-Mar-2014
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.12-Mar-2014
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.12-Mar-2014
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
12-Mar-2014
1In respect to the area designated as CPL 28 in TENGRAPH the following conditions apply:12-Mar-2014
71Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, DMP the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMP. The program to include:
  • maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
  • the purpose, specifications and life of all proposed disturbances;
  • proposals which may disturb any declared rare or geographically restricted flora and fauna; and
  • techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
12-Mar-2014
81The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMP. Such rehabilitation as is appropriate and may include:
  • stockpiling and return of topsoil;
  • backfilling all holes, trenches and costeans;
  • ripping;
  • contouring to the original landform;
  • revegetation with seed; and
  • capping and backfilling of all drill holes.
12-Mar-2014
91Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMP and arranging an inspection as required.12-Mar-2014

Endorsements

Cond #VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.12-Mar-2014
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.12-Mar-2014
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.12-Mar-2014
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.12-Mar-2014
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.12-Mar-2014
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
12-Mar-2014
1In respect to the area designated as CPL 28 in TENGRAPH the following conditions apply:12-Mar-2014
71Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, DMP the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMP. The program to include:
  • maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
  • the purpose, specifications and life of all proposed disturbances;
  • proposals which may disturb any declared rare or geographically restricted flora and fauna; and
  • techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
12-Mar-2014
81The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMP. Such rehabilitation as is appropriate and may include:
  • stockpiling and return of topsoil;
  • backfilling all holes, trenches and costeans;
  • ripping;
  • contouring to the original landform;
  • revegetation with seed; and
  • capping and backfilling of all drill holes.
12-Mar-2014
91Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMP and arranging an inspection as required.12-Mar-2014

Dealings

TypeNumberDetails
Extension of Time486406Lodged:09:55 10 May 2016Type:Form 5RECORDED:09:55 10 May 2016APPROVED:12:55:16 10 May 2016Extension of Time to Lodge Form 5 until 16 June 2016.
Forfeiture486827Initiated:17/05/2016 for non-compliance with rent requirementsRECORDED:07:54:31 17 May 2016Notice Issued:Regulation 50 Notice sent 17/05/2016 for non-compliance with rent requirements pursuant to Reg 109/Sec 63A- non payment of rent.Compliance Date:21/06/2016FINALISED:Order by Minister on 24 June 2016 that E 09/2062 be Penalty Imposed
Fine489421Fine in respect to:Forfeiture Process 486827Fine reason:Non-compliance with rent obligationsPenalty amount:$227.00Notification date:27/06/2016Due date:01/08/2016Pursuant to:Section 96A(5)RECORDED:27 June 2016PAYMENT RECEIVED:25 July 2016Receipt Number:06-155389Amount:$227.00Remaining balance:$0.00FINALISED:25 July 2016
Application to Amend490149Lodged:10:41:25 07 July 2016Amending:Address (Including DTC Details)From:MINGS MINING RESOURCES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249 PERTH BUSINESS CENTRE, PERTH, WA, 6849To:MINGS MINING RESOURCES PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977RECORDED:10:41:25 07 July 2016
Extension of Time506067Lodged:14:37:38 10 May 2017Type:Form 5RECORDED:14:37:38 10 May 2017APPROVED:10:24:08 12 May 2017Time to lodge extended to 11/06/2017
Application to Amend526301Lodged:10:30 23 March 2018Amending:Address (Including DTC Details)From:MINGS MINING RESOURCES PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977To:MINGS MINING RESOURCES PTY LTD, MINGS MINING RESOURCES PTY LTD, 552 WILLIAM STREET, MOUNT LAWLEY, WA, 6050, xxxxxxx338RECORDED:10:30 23 March 2018
Application to Amend544217Lodged:13:12:40 07 December 2018Amending:Address (Including DTC Details)From:MINGS MINING RESOURCES PTY LTD, MINGS MINING RESOURCES PTY LTD, 552 WILLIAM STREET, MOUNT LAWLEY, WA, 6050, xxxxxxx338To:MINGS MINING RESOURCES PTY LTD, WA MANAGER - TENEMENTS, PO BOX 268, WEST PERTH, WA, 6872, xxxxxxxxxxxxxxx@gmail.com, xxxxxxx945RECORDED:13:12:40 07 December 2018
Application to Amend544218Lodged:13:12:40 07 December 2018Amending:Address (Including DTC Details)From:MINGS MINING RESOURCES PTY LTD, SAME AS CORRESPONDENCETo:MINGS MINING RESOURCES PTY LTD, TOWER A 1301, 821 PACIFIC HIGHWAY, CHATSWOOD, NSW, 2067, xxxxxxxxxxxxxxx@gmail.com, xxxxxxx361RECORDED:13:12:40 07 December 2018
Expiry - Full549825EFFECTIVE:Midnight 11 March 2019

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental201919-Apr-2018 EFT$3,328.0016 BL12-Mar-2014 $3,328.00$0.00
Rental201819-Apr-2017 72925393527$3,223.2016 BL12-Mar-2014 $3,223.20$0.00
Rental201726-May-2016 06-154144PERTH$2,004.0016 BL12-Mar-2014 $2,004.00$0.00
Rental201610-Apr-2015 06-144372PERTH$1,953.6016 BL12-Mar-2014 $1,953.60$0.00
Rental201529-May-2013 314823462183$1,867.2016 BL12-Mar-2014 $1,867.20$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2019$30,000.00false
2018$30,000.0026-Apr-2018 $30,790.00$0.00$0.00$0.00$0.00$0.00$30,790.00false
2017$20,000.0018-May-2017 $29,629.00$0.00$0.00$0.00$0.00$0.00$29,629.00false
2016$20,000.0002-Jun-2016 $20,422.00$0.00$0.00$0.00$0.00$0.00$20,422.00false
2015$20,000.0010-Apr-2015 $21,888.00$0.00$0.00$0.00$0.00$0.00$21,888.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
02-Oct-2013 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2013-10-232014-02-23CLEARED - Expedited Applies2014-03-1116 BL24440S116260E129km E'ly of Gascoyne JunctionWajarri Yamatji #1(WC2004/010)WC2004/010WAD28/2019trueDetermined14GeraldtonYamatji Marlpa Aboriginal Corporation