Extracted from MTO on 25-Mar-2026 00:16,
last changed 25-Mar-2026.
| # | Ver | Text | Start | End |
| 1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 27-Nov-2013 | |
| 2 | 2 | Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Petroleum and Exploration. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Mines, Petroleum and Exploration. | 26-Feb-2026 | |
| 2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 27-Nov-2013 | 25-Feb-2026 |
| 3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 27-Nov-2013 | |
| 4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 27-Nov-2013 | |
| 5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 27-Nov-2013 | |
| 6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 27-Nov-2013 | |
| 7 | 1 | No interference with Geodetic Survey Station SSM-EDMUND 9 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 27-Nov-2013 | |
| 8 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Petroleum and Exploration. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Mines, Petroleum and Exploration. | 26-Feb-2026 | |
| 9 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department of Mines, Petroleum and Exploration upon request. | 26-Feb-2026 | |
| 10 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 26-Feb-2026 | |
| Cond # | Ver | Text | Start | End |
| 1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 27-Nov-2013 | |
| 2 | 2 | Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Petroleum and Exploration. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Mines, Petroleum and Exploration. | 26-Feb-2026 | |
| 2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 27-Nov-2013 | 25-Feb-2026 |
| 3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 27-Nov-2013 | |
| 4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 27-Nov-2013 | |
| 5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 27-Nov-2013 | |
| 6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 27-Nov-2013 | |
| 7 | 1 | No interference with Geodetic Survey Station SSM-EDMUND 9 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 27-Nov-2013 | |
| 8 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Petroleum and Exploration. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Mines, Petroleum and Exploration. | 26-Feb-2026 | |
| 9 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department of Mines, Petroleum and Exploration upon request. | 26-Feb-2026 | |
| 10 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 26-Feb-2026 | |
| Type | Number | Details |
| Application to Amend | 449201 | Lodged:13:00:14 19 June 2014Amending:AddressFrom:GTI RESOURCES LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931To:GTI RESOURCES LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947RECORDED:13:00:14 19 June 2014 |
| Conversion | 459702 | New Tenement:M 09/157Application Date:10:02:05 23 Dec 2014Section:S67Converted 00:00 01 July 2015 being commencement of term of M 09/157 |
| Conversion | 467677 | New Tenement:M 09/160Application Date:14:39:13 18 May 2015Section:S67Converted 00:00 17 November 2015 being commencement of term of M 09/160 |
| Conversion | 474424 | New Tenement:G 09/10Application Date:14:29:09 15 Sep 2015Section:S67G09/10 granted to a depth of 50m.Converted 00:00 11 March 2016 being commencement of term of G 09/10 |
| Conversion | 474455 | New Tenement:G 09/10Application Date:14:29:09 15 Sep 2015Section:S67Converted 00:00 11 March 2016 being commencement of term of G 09/10 |
| Conversion | 474483 | New Tenement:M 09/165Application Date:13:01:58 16 Sep 2015Section:S67Converted 00:00 25 February 2016 being commencement of term of M 09/165 |
| Expiry - Partial | 477503 | Expired Land:MINING LEASE 09/160EFFECTIVE:00:00 17 November 2015 |
| Expiry - Partial | 482690 | Expired Land:Mining Lease 09/165Retained Blocks:HAMERSLEY RANGE 3266 r, v, w, x
HAMERSLEY RANGE 3267 b, c, d, h, j, k, o, p, t, v, w, x, y, z
HAMERSLEY RANGE 3268 l, q, r, w, x
HAMERSLEY RANGE 3338 c, h, j, k, p, t, u, y
HAMERSLEY RANGE 3339 a, c, f, l, m, u
HAMERSLEY RANGE 3340 b, c, d, g, m, q, r, w, x
HAMERSLEY RANGE 3412 b, cRetained Total:48 BL.EFFECTIVE:00:00 25 February 2016 |
| Conversion | 491770 | New Tenement:G 09/14Section:S67Application Date:15:23:47 02 Aug 2016Converted 00:00 01 February 2018 being commencement of term of G 09/14 |
| Conversion | 491774 | Section:S67Application Date:15:23:47 02 Aug 2016New Tenement:G 09/12Discontinued due to G 09/12 Withdrawn 11:46:56 10 March 2017 |
| Application to Amend | 526840 | Lodged:15:06:58 29 March 2018Amending:Address (Including DTC Details)From:Principal Place of Business : GASCOYNE METALS PTY LTD, LEVEL 9, 50 MARGARET STREET, SYDNEY, NSW, 2000 and DTC :GASCOYNE METALS PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:Principal Place of Business : GASCOYNE METALS PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400 and DTC :GASCOYNE METALS PTY LTD, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400RECORDED:15:06:58 29 March 2018 |
| Extension / Renewal of Term | 541803 | Lodged:11:33:37 01 November 2018Applied For Period:5 YearsRECORDED:11:33:37 01 November 2018GRANTED:19 November 2018Granted Period:5 YearsTerm Extended To:26/11/2023 |
| Partial Surrender - Compulsory | 567460 | Lodged:14:45:26 26 November 2019Section:Section 65 (3)Surrendered Blocks:HAMERSLEY RANGE 3266 r, v, w, x
HAMERSLEY RANGE 3267 b, c, d, h, j, k, o, p, t
HAMERSLEY RANGE 3268 l, q, r
HAMERSLEY RANGE 3338 c, h, jSurrendered Total:19 BL.REGISTERED:Midnight 26 November 2019Surrendered area to be released 08:30:00 17/12/2019 under Section 65 (3)Surrendered area released 08:30:00 17/12/2019 under Section 65 (3) |
| Conversion | 591648 | New Tenement:G 09/24Application Date:13:27:27 30 Nov 2020Section:S67Converted 00:00 26 July 2021 being commencement of term of G 09/24 |
| Excess Tonnage | 625444 | Lodged:13:19:20 08 June 2021RECORDED:13:19:20 08 June 2021GRANTED:10:42 25 June 2021Additional 486 tonnes |
| Extension / Renewal of Term | 688053 | Lodged:11:15:11 18 October 2023Applied For Period:2 YearsRECORDED:11:15:11 18 October 2023GRANTED:07 February 2024Granted Period:2 YearsTerm Extended To:26/11/2025 |
| Conversion | 691255 | New Tenement:G 09/29Application Date:10:32:48 30 Nov 2023Section:S67Converted 00:00 13 June 2024 being commencement of term of G 09/29 |
| Extension / Renewal of Term | 747503 | Lodged:13:52:02 26 November 2025Applied For Period:2 YearsRECORDED:13:52:02 26 November 2025GRANTED:29 January 2026Granted Period:2 YearsTerm Extended To:26/11/2027 |
| Extension / Renewal of Term | 747524 | Lodged:15:00:17 26 November 2025RECORDED:15:00:17 26 November 2025LAPSED:29 January 2026 |