1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 29-Jun-2012 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 29-Jun-2012 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 29-Jun-2012 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 29-Jun-2012 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 29-Jun-2012 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 29-Jun-2012 | |
7 | 1 | No interference with Geodetic Survey Station BYRO 14 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 29-Jun-2012 | |
8 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 29-Jun-2012 | |
| 1 | In respect to the area of land designated File Notation Area 7618 in TENGRAPH the following shall apply:
| 29-Jun-2012 | |
9 | 1 | Prior to carrying out any on-ground activities, the Licensee developing a plan of activities to ensure that electromagnetic emissions from those activities will not interfere with the radio-quiet requirements of the Murchison Radio-astronomy Observatory. The plan shall be submitted to the Australian SKA Coordination Committee's "Coordinator for Land Management Issues" at the Department of Mines and Petroleum (DMP) for approval by the Director General of DMP. | 29-Jun-2012 | |
10 | 1 | The approved plan to be included with any "Programme of Work" or "Mining Proposal" submitted to DMP for approval under the Mining Act 1978. | 29-Jun-2012 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 29-Jun-2012 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 29-Jun-2012 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 29-Jun-2012 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 29-Jun-2012 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 29-Jun-2012 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 29-Jun-2012 | |
7 | 1 | No interference with Geodetic Survey Station BYRO 14 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 29-Jun-2012 | |
8 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 29-Jun-2012 | |
| 1 | In respect to the area of land designated File Notation Area 7618 in TENGRAPH the following shall apply:
| 29-Jun-2012 | |
9 | 1 | Prior to carrying out any on-ground activities, the Licensee developing a plan of activities to ensure that electromagnetic emissions from those activities will not interfere with the radio-quiet requirements of the Murchison Radio-astronomy Observatory. The plan shall be submitted to the Australian SKA Coordination Committee's "Coordinator for Land Management Issues" at the Department of Mines and Petroleum (DMP) for approval by the Director General of DMP. | 29-Jun-2012 | |
10 | 1 | The approved plan to be included with any "Programme of Work" or "Mining Proposal" submitted to DMP for approval under the Mining Act 1978. | 29-Jun-2012 | |
Type | Number | Details |
Licence Instrument | 424763 | Lodged:08:30 29 June 2012ISSUED:08:30 29 June 2012 |
Iron Ore Inclusion | 420961 | Lodged:15:10 15 April 2013RECORDED:15:10 15 April 2013AUTHORISED:15:10 15 April 2013 |
Conversion | 495177 | Partial Conversion of E09/1938Section:S67Application Date:16:19:55 10 Oct 2016New Tenement:M 09/168-IConverted 00:00 09 April 2018 being commencement of term of M 09/168-I |
Extension / Renewal of Term | 508478 | Lodged:13:55 16 June 2017Applied For Period:5 YearsRECORDED:13:55 16 June 2017GRANTED:04 September 2017Granted Period:5 YearsTerm Extended To:28/06/2022 |
Partial Surrender - Compulsory | 533854 | Lodged:09:02:51 28 June 2018Section:Section 65 (3)Surrendered Blocks:MEEKATHARRA 2111 t, u, y
MEEKATHARRA 2112 w, x
MEEKATHARRA 2183 o, p, t, u, y, z
MEEKATHARRA 2184 b, c, f, g, l, q
MEEKATHARRA 2255 d
MEEKATHARRA 2256 cSurrendered Total:19 BL.REGISTERED:Midnight 28 June 2018Surrendered area to be released 08:30:00 25/07/2018 under Section 65 (3)Surrendered area released 08:30:00 25/07/2018 under Section 65 (3) |
Partial Surrender - Voluntary | 580178 | Lodged:08:30 18 June 2020Surrendered Blocks:MEEKATHARRA 2111 z
MEEKATHARRA 2112 q, r, s, t, v, y
MEEKATHARRA 2183 d, e, j, k
MEEKATHARRA 2184 a, d, x, y
MEEKATHARRA 2255 e
MEEKATHARRA 2256 b, dSurrendered Total:18 BL.REGISTERED:08:30 18 June 2020 |
Extension / Renewal of Term | 652236 | Lodged:08:30 27 June 2022Applied For Period:2 YearsRECORDED:08:30 27 June 2022GRANTED:24 August 2022Granted Period:2 YearsTerm Extended To:28/06/2024 |
Extension / Renewal of Term | 707817 | Lodged:12:36:39 26 June 2024Applied For Period:2 YearsRECORDED:12:36:39 26 June 2024GRANTED:27 February 2025Granted Period:2 YearsTerm Extended To:28/06/2026 |