Extracted from MTO on 20-May-2022 03:49,
last changed 30-Mar-2022.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 19-Dec-2011 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 19-Dec-2011 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 19-Dec-2011 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 19-Dec-2011 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 19-Dec-2011 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 19-Dec-2011 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 19-Dec-2011 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 19-Dec-2011 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 19-Dec-2011 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 19-Dec-2011 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 19-Dec-2011 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 19-Dec-2011 | |
Type | Number | Details |
Application to Amend | 439501 | Lodged:12:15 29 January 2014Amending:AddressFrom:GASCOYNE RESOURCES (WA) PTY LTD, C/- ANDERSON'S TENEMENT MANAGEMENT, PO BOX 2162, WARWICK, WA, 6024To:GASCOYNE RESOURCES (WA) PTY LTD, PO BOX 1340, WEST PERTH, WA, 6872RECORDED:12:15 29 January 2014 |
Extension / Renewal of Term | 498674 | Lodged:08:30 16 December 2016Applied For Period:5 YearsRECORDED:08:30 16 December 2016GRANTED:14 February 2017Granted Period:5 YearsTerm Extended To:18/12/2021 |
Application to Amend | 505945 | Lodged:15:51:21 08 May 2017Amending:Address (Including DTC Details)From:Principal Place of Business : GASCOYNE RESOURCES (WA) PTY LTD, SAME AS CORRESPONDENCE and DTC :GASCOYNE RESOURCES (WA) PTY LTD, PO BOX 1340, WEST PERTH, WA, 6872To:Principal Place of Business : GASCOYNE RESOURCES (WA) PTY LTD, C/- STS, PO BOX 1340, WEST PERTH, WA, 6872, xxxx@strategictenements.com, xxxxxxx036 and DTC :GASCOYNE RESOURCES (WA) PTY LTD, STS, C/- STS, PO BOX 1340, WEST PERTH, WA, 6872, xxxx@strategictenements.com, xxxxxxx036RECORDED:15:51:21 08 May 2017 |
Mortgage | 544596 | Lodged:15:25 12 December 2018Mortgaged Shares:100/100 shares GASCOYNE RESOURCES (WA) PTY LTDMortgagee:NATIONAL AUSTRALIA BANK LIMITEDREGISTERED:15:25 12 December 2018Full Discharge:588636 Registered 14:55 21 October 2020DISCHARGED:14:55 21 October 2020 |
Mortgage - Discharge | 588636 | Lodged:14:55 21 October 2020In respect to:Mortgage 544596REGISTERED:14:55 21 October 2020 |
Extension / Renewal of Term | 637854 | Lodged:08:30 17 December 2021Applied For Period:2 YearsRECORDED:08:30 17 December 2021GRANTED:29 March 2022Granted Period:2 YearsTerm Extended To:18/12/2023 |
Extension of Time | 638589 | Lodged:14:20:12 24 December 2021Type:OtherRECORDED:14:20:12 24 December 2021APPROVED:09:23:05 10 January 2022Time to lodge extended to 14 January 2022 |