Extracted from MTO on 04-Jul-2025 01:08,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 14-Apr-2011 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 14-Apr-2011 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 14-Apr-2011 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 14-Apr-2011 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 14-Apr-2011 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 14-Apr-2011 | |
7 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 14-Apr-2011 | |
| 1 | In respect to the area designated as FNA 7618 in TENGRAPH the following conditions apply: | 14-Apr-2011 | |
8 | 1 | Prior to carrying out any on-ground activities, the Licensee developing a plan of activities to ensure that electromagnetic emissions from those activities will not interfere with the radio-quiet requirements of the Murchison Radio-astronomy Observatory. The plan shall be submitted to the Australian SKA Coordination Committee's "Coordinator for Land Management Issues" at the Department of Mines and Petroleum (DMP) for approval by the Director General of DMP. | 14-Apr-2011 | |
9 | 1 | The approved plan to be included with any "Programme of Work" or "Mining Proposal" submitted to DMP for approval under the Mining Act 1978. | 14-Apr-2011 | |
| 1 | Consent to explore on De Grey Mullewa Stock Route Reserve 9701 granted subject to:
| 14-Apr-2011 | |
10 | 1 | No exploration activities being carried out on De Grey Mullewa Stock Route Reserve 9701 which restrict the use of the reserve. | 14-Apr-2011 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 14-Apr-2011 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 14-Apr-2011 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 14-Apr-2011 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 14-Apr-2011 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 14-Apr-2011 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 14-Apr-2011 | |
7 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 14-Apr-2011 | |
| 1 | In respect to the area designated as FNA 7618 in TENGRAPH the following conditions apply: | 14-Apr-2011 | |
8 | 1 | Prior to carrying out any on-ground activities, the Licensee developing a plan of activities to ensure that electromagnetic emissions from those activities will not interfere with the radio-quiet requirements of the Murchison Radio-astronomy Observatory. The plan shall be submitted to the Australian SKA Coordination Committee's "Coordinator for Land Management Issues" at the Department of Mines and Petroleum (DMP) for approval by the Director General of DMP. | 14-Apr-2011 | |
9 | 1 | The approved plan to be included with any "Programme of Work" or "Mining Proposal" submitted to DMP for approval under the Mining Act 1978. | 14-Apr-2011 | |
| 1 | Consent to explore on De Grey Mullewa Stock Route Reserve 9701 granted subject to:
| 14-Apr-2011 | |
10 | 1 | No exploration activities being carried out on De Grey Mullewa Stock Route Reserve 9701 which restrict the use of the reserve. | 14-Apr-2011 | |
Type | Number | Details |
Application to Amend | 366749 | Lodged:11:10 02 March 2011Amending:NameFrom:LIGHTWAVE INVESTMENTS PTY LTDTo:BYRO EXPLORATION PTY LTDRECORDED:11:10 02 March 2011 |
Iron Ore Inclusion | 368216 | Lodged:11:35 25 March 2011RECORDED:11:35 25 March 2011AUTHORISED:00:00 14 April 2011 |
Partial Surrender - Voluntary | 462027 | Lodged:11:30 10 February 2015Surrendered Blocks:MEEKATHARRA 1900 e, k, p
MEEKATHARRA 1901 a, b, c, d, f, g
MEEKATHARRA 1972 d, g, hSurrendered Total:12 BL.REGISTERED:11:30 10 February 2015 |
Partial Surrender - Voluntary | 479301 | Lodged:12:50 21 December 2015Surrendered Blocks:MEEKATHARRA 1829 t, u, y, z
MEEKATHARRA 1900 g, h, j, m, n, o, s, t, u, x, y, zSurrendered Total:16 BL.REGISTERED:12:50 21 December 2015 |
Extension / Renewal of Term | 484866 | Lodged:14:45 11 April 2016Applied For Period:5 YearsRECORDED:14:45 11 April 2016GRANTED:14 July 2016Granted Period:5 YearsTerm Extended To:13/04/2021 |
Partial Surrender - Voluntary | 575371 | Lodged:14:30:13 01 April 2020Surrendered Blocks:MEEKATHARRA 1826 n, o, s, t, u, x, y, z
MEEKATHARRA 1899 c, d, f, g, h, j, r, s, t, u
MEEKATHARRA 1900 l, q, r, w
MEEKATHARRA 1972 b, cSurrendered Total:24 BL.REGISTERED:14:30:13 01 April 2020 |
Extension / Renewal of Term | 620053 | Lodged:15:54:07 12 April 2021Applied For Period:2 YearsRECORDED:15:54:07 12 April 2021GRANTED:14 June 2021Granted Period:2 YearsTerm Extended To:13/04/2023 |
Extension / Renewal of Term | 672979 | Lodged:08:30 12 April 2023Applied For Period:2 YearsRECORDED:08:30 12 April 2023GRANTED:31 July 2023Granted Period:2 YearsTerm Extended To:13/04/2025 |
Extension / Renewal of Term | 730403 | Lodged:11:41:53 08 April 2025Applied For Period:2 YearsRECORDED:11:41:53 08 April 2025 |