Extracted from MTO on 02-Jul-2025 00:49,
last changed 02-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 09-May-2011 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 09-May-2011 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 09-May-2011 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 09-May-2011 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 09-May-2011 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 09-May-2011 | |
7 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 09-May-2011 | |
8 | 1 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:- "Programme of Work on E09/1325 and E09/1764 for Gascoyne Resources Limited" (Reg. ID 33556) dated 19 December 2011 signed by Di Tyly-Laurie and retained on Department of Mines and Petroleum file No. EARS-POW-33556.
Where a difference exists between the above document and the following conditions, then the following conditions shall prevail. | 22-Feb-2012 | |
9 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 22-Feb-2012 | |
10 | 1 | All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses. | 22-Feb-2012 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 09-May-2011 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 09-May-2011 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 09-May-2011 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 09-May-2011 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 09-May-2011 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 09-May-2011 | |
7 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 09-May-2011 | |
8 | 1 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:- "Programme of Work on E09/1325 and E09/1764 for Gascoyne Resources Limited" (Reg. ID 33556) dated 19 December 2011 signed by Di Tyly-Laurie and retained on Department of Mines and Petroleum file No. EARS-POW-33556.
Where a difference exists between the above document and the following conditions, then the following conditions shall prevail. | 22-Feb-2012 | |
9 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 22-Feb-2012 | |
10 | 1 | All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses. | 22-Feb-2012 | |
Type | Number | Details |
Application to Amend | 342835 | Lodged:10:52 17 March 2010By amending the Form 21 to include the ACN 139 522 900RECORDED:10:52 17 March 2010 |
Application to Amend | 366499 | Lodged:11:43 25 February 2011Amending:AddressFrom:GASCOYNE RESOURCES LIMITED, SUITE 7, 29 ORD STREET, WEST PERTH, WA, 6005To:GASCOYNE RESOURCES LIMITED, C/- ANDERSON'S TENEMENT MANAGEMENT, P O BOX 2162, WARWICK, WA, 6024RECORDED:11:43 25 February 2011 |
Application to Amend | 439480 | Lodged:12:15 29 January 2014Amending:AddressFrom:GASCOYNE RESOURCES LIMITED, C/- ANDERSONS TENEMENT MANAGEMENT, PO BOX 2162, WARWICK, WA, 6024To:GASCOYNE RESOURCES LIMITED, PO BOX 1340, WEST PERTH, WA, 6872RECORDED:12:15 29 January 2014 |
Partial Surrender - Voluntary | 443376 | Lodged:15:10 01 April 2014Surrendered Blocks:MEEKATHARRA 1104 t, y, z
MEEKATHARRA 1176 e, k
MEEKATHARRA 1177 f, g, l
MEEKATHARRA 1248 k, p
MEEKATHARRA 1249 f, l, q, v
MEEKATHARRA 1321 aSurrendered Total:15 BL.REGISTERED:15:10 01 April 2014 |
Partial Surrender - Voluntary | 449696 | Lodged:15:00 26 June 2014Surrendered Blocks:MEEKATHARRA 1176 d, j, p, u, z
MEEKATHARRA 1177 v, w, x
MEEKATHARRA 1178 y
MEEKATHARRA 1249 m, n, r, s, w, x
MEEKATHARRA 1250 b, c, d, e, h, j, k, o, p, t, u, w, x
MEEKATHARRA 1251 a, b, f, g, l, m
MEEKATHARRA 1321 b, c, d, e, j, kSurrendered Total:40 BL.REGISTERED:15:00 26 June 2014 |
Partial Surrender - Voluntary | 455808 | Lodged:16:05 06 October 2014Surrendered Blocks:MEEKATHARRA 1178 xSurrendered Total:1 BL.REGISTERED:16:05 06 October 2014 |
Partial Surrender - Voluntary | 460278 | Lodged:11:30:38 13 January 2015Surrendered Blocks:MEEKATHARRA 1178 z
MEEKATHARRA 1179 q, r, v, w
MEEKATHARRA 1248 e
MEEKATHARRA 1249 a, o, p, t, u, y, z
MEEKATHARRA 1250 f, g, l, m, n, q, r, s, vSurrendered Total:22 BL.REGISTERED:11:30:38 13 January 2015 |
Extension / Renewal of Term | 486324 | Lodged:15:58:36 06 May 2016Applied For Period:5 YearsRECORDED:15:58:36 06 May 2016GRANTED:08 August 2016Granted Period:5 YearsTerm Extended To:08/05/2021 |
Application to Amend | 505946 | Lodged:15:53:38 08 May 2017Amending:Address (Including DTC Details)From:Principal Place of Business : GASCOYNE RESOURCES LIMITED, SAME AS CORRESPONDENCE and DTC :GASCOYNE RESOURCES LIMITED, PO BOX 1340, WEST PERTH, WA, 6872To:Principal Place of Business : GASCOYNE RESOURCES LIMITED, C/- STS, PO BOX 1340, WEST PERTH, WA, 6872, xxxx@strategictenements.com, xxxxxxx036 and DTC :GASCOYNE RESOURCES LIMITED, STS, C/- STS, PO BOX 1340, WEST PERTH, WA, 6872, xxxx@strategictenements.com, xxxxxxx036REJECTED:15:53:38 08 May 2017 |
Application to Amend | 506176 | Lodged:09:37:23 12 May 2017Amending:Address (Including DTC Details)From:Principal Place of Business : GASCOYNE RESOURCES LIMITED, SAME AS CORRESPONDENCE and DTC :GASCOYNE RESOURCES LIMITED, PO BOX 1340, WEST PERTH, WA, 6872To:Principal Place of Business : GASCOYNE RESOURCES LIMITED, C/- STS, PO BOX 1340, WEST PERTH, WA, 6872, xxxx@strategictenements.com, xxxxxxx036 and DTC :GASCOYNE RESOURCES LIMITED, STS, C/- STS, PO BOX 1340, WEST PERTH, WA, 6872, xxxx@strategictenements.com, xxxxxxx036RECORDED:09:37:23 12 May 2017 |
Conversion | 619333 | Application Date:12:54:11 31 Mar 2021Section:S67New Tenement:M 09/181 |
Extension / Renewal of Term | 621725 | Lodged:15:36:05 04 May 2021Applied For Period:2 YearsRECORDED:15:36:05 04 May 2021GRANTED:15 July 2021Granted Period:2 YearsTerm Extended To:08/05/2023 |
Mortgage | 669881 | Lodged:09:43:33 28 February 2023Mortgaged Shares:100/100 shares GASCOYNE RESOURCES (WA) PTY LTDMortgagee:TEMBO CAPITAL MINING FUND III (F&F) LPREGISTERED:09:43:33 28 February 2023DISCHARGED:14:22:33 31 May 2023Full Discharge:677484 Registered 14:22:33 31 May 2023 |
Mortgage | 669884 | Lodged:09:48:56 28 February 2023Mortgaged Shares:100/100 shares GASCOYNE RESOURCES (WA) PTY LTDMortgagee:TEMBO CAPITAL MINING FUND III (NON-US) LPREGISTERED:09:48:56 28 February 2023DISCHARGED:14:31:58 31 May 2023Full Discharge:677493 Registered 14:31:58 31 May 2023 |
Mortgage | 669885 | Lodged:09:55 28 February 2023Mortgaged Shares:100/100 shares GASCOYNE RESOURCES (WA) PTY LTDMortgagee:TEMBO CAPITAL MINING FUND III LPREGISTERED:09:55 28 February 2023DISCHARGED:14:35:49 31 May 2023Full Discharge:677496 Registered 14:35:49 31 May 2023 |
Extension / Renewal of Term | 675262 | Lodged:10:35:16 08 May 2023Applied For Period:2 YearsRECORDED:10:35:16 08 May 2023GRANTED:04 October 2023Granted Period:2 YearsTerm Extended To:08/05/2025 |
Mortgage | 675650 | Lodged:09:38:49 11 May 2023Mortgaged Shares:100/100 shares GASCOYNE RESOURCES (WA) PTY LTDMortgagee:TEMBO CAPITAL MINING FUND III LPREGISTERED:09:38:49 11 May 2023Mortgage Transfer:722547 Registered 12:13:45 20 December 2024New Mortgagee:OSISKO GOLD ROYALTIES (AUSTRALIA) PTY LTD |
Mortgage | 675652 | Lodged:09:48:21 11 May 2023Mortgaged Shares:100/100 shares GASCOYNE RESOURCES (WA) PTY LTDMortgagee:TEMBO CAPITAL MINING FUND III (F&F) LPREGISTERED:09:48:21 11 May 2023Mortgage Transfer:722541 Registered 12:00:52 20 December 2024New Mortgagee:OSISKO GOLD ROYALTIES (AUSTRALIA) PTY LTD |
Mortgage | 675654 | Lodged:09:52:50 11 May 2023Mortgaged Shares:100/100 shares GASCOYNE RESOURCES (WA) PTY LTDMortgagee:TEMBO CAPITAL MINING FUND III (NON-US) LPREGISTERED:09:52:50 11 May 2023Mortgage Transfer:722539 Registered 12:00:52 20 December 2024New Mortgagee:OSISKO GOLD ROYALTIES (AUSTRALIA) PTY LTD |
Mortgage - Discharge | 677484 | Lodged:14:22:33 31 May 2023In respect to:Mortgage 669881REGISTERED:14:22:33 31 May 2023 |
Mortgage - Discharge | 677493 | Lodged:14:31:58 31 May 2023In respect to:Mortgage 669884REGISTERED:14:31:58 31 May 2023 |
Mortgage - Discharge | 677496 | Lodged:14:35:49 31 May 2023In respect to:Mortgage 669885REGISTERED:14:35:49 31 May 2023 |
Extension of Time | 682877 | Lodged:15:48:02 03 August 2023Type:Stat DecRECORDED:15:48:02 03 August 2023APPROVED:12:30:32 16 August 2023Time to lodge extended to 18 Aug 2023 |
Mortgage | 685732 | Lodged:15:28:24 11 September 2023Mortgaged Shares:100/100 shares GASCOYNE RESOURCES (WA) PTY LTDMortgagee:DEUTSCHE BALATON AKTIENGESELLSCHAFTREGISTERED:15:28:24 11 September 2023DISCHARGED:10:38:09 16 May 2024Full Discharge:704252 Registered 10:38:09 16 May 2024 |
Mortgage - Discharge | 704252 | Lodged:10:38:09 16 May 2024In respect to:Mortgage 685732REGISTERED:10:38:09 16 May 2024 |
Mortgage - Transfer | 722539 | Lodged:12:00:52 20 December 2024In respect to:Mortgage 675654From:TEMBO CAPITAL MINING FUND III (NON-US) LPTo:OSISKO GOLD ROYALTIES (AUSTRALIA) PTY LTDREGISTERED:12:00:52 20 December 2024 |
Mortgage - Transfer | 722541 | Lodged:12:00:52 20 December 2024In respect to:Mortgage 675652From:TEMBO CAPITAL MINING FUND III (F&F) LPTo:OSISKO GOLD ROYALTIES (AUSTRALIA) PTY LTDREGISTERED:12:00:52 20 December 2024 |
Mortgage - Transfer | 722547 | Lodged:12:13:45 20 December 2024In respect to:Mortgage 675650From:TEMBO CAPITAL MINING FUND III LPTo:OSISKO GOLD ROYALTIES (AUSTRALIA) PTY LTDREGISTERED:12:13:45 20 December 2024 |
Mortgage - Transfer | 722548 | Lodged:12:13:45 20 December 2024In respect to:Mortgage 675650From:TEMBO CAPITAL MINING FUND III LPTo:OSISKO GOLD ROYALTIES (AUSTRALIA) PTY LTDREJECTED:12:13:45 20 December 2024 |
Mortgage | 722647 | Lodged:15:05:51 20 December 2024Mortgaged Shares:100/100 shares GASCOYNE RESOURCES (WA) PTY LTDMortgagee:OSISKO GOLD ROYALTIES (AUSTRALIA) PTY LTDREGISTERED:16:27 13 February 2025 |
Caveat | 725917 | Lodged:08:30 17 February 2025Caveat Type:Consent CaveatCaveator:OSISKO GOLD ROYALTIES (AUSTRALIA) PTY LTDShares Caveated:100/100 shares GASCOYNE RESOURCES (WA) PTY LTDRECORDED:08:30 17 February 2025 |
Extension / Renewal of Term | 732648 | Lodged:16:15:45 06 May 2025Applied For Period:2 YearsRECORDED:16:15:45 06 May 2025 |