Extracted from MTO on 12-Jul-2025 01:19,
last changed 04-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 29-Mar-2007 | |
2 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 06-Jun-2025 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 29-Mar-2007 | 05-Jun-2025 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 29-Mar-2007 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 29-Mar-2007 | |
5 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 29-Mar-2007 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 29-Mar-2007 | |
7 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 29-Mar-2007 | |
8 | 1 | No interference with Geodetic Survey Station SSM-ZL 49 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 29-Mar-2007 | |
9 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing mining on Public Purposes Reserve 704. | 29-Mar-2007 | |
10 | 2 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Works for Helix Resources Ltd on E09/1325 (7796) dated 25 October 2007 signed by Craig Johnson and retained on Department of Industry and Resources File No. T3773/200601;
- "Programme of Work on E09/1325 and E09/1764 for Gascoyne Resources Limited" (Reg. ID 33556) dated 19 December 2011 signed by Di Tyly-Laurie and retained on Department of Mines and Petroleum file No. EARS-POW-33556.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 22-Feb-2012 | |
10 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Works for Helix Resources Ltd on E09/1325 (7796) dated 25 October 2007 signed by Craig Johnson and retained on Department of Industry and Resources File No. T3773/200601
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 03-Apr-2008 | 21-Feb-2012 |
11 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 03-Apr-2008 | |
12 | 1 | All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses. | 22-Feb-2012 | |
13 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 06-Jun-2025 | |
14 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 06-Jun-2025 | |
15 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 06-Jun-2025 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 29-Mar-2007 | |
2 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 06-Jun-2025 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 29-Mar-2007 | 05-Jun-2025 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 29-Mar-2007 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 29-Mar-2007 | |
5 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 29-Mar-2007 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 29-Mar-2007 | |
7 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 29-Mar-2007 | |
8 | 1 | No interference with Geodetic Survey Station SSM-ZL 49 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 29-Mar-2007 | |
9 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing mining on Public Purposes Reserve 704. | 29-Mar-2007 | |
10 | 2 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Works for Helix Resources Ltd on E09/1325 (7796) dated 25 October 2007 signed by Craig Johnson and retained on Department of Industry and Resources File No. T3773/200601;
- "Programme of Work on E09/1325 and E09/1764 for Gascoyne Resources Limited" (Reg. ID 33556) dated 19 December 2011 signed by Di Tyly-Laurie and retained on Department of Mines and Petroleum file No. EARS-POW-33556.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 22-Feb-2012 | |
10 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Works for Helix Resources Ltd on E09/1325 (7796) dated 25 October 2007 signed by Craig Johnson and retained on Department of Industry and Resources File No. T3773/200601
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 03-Apr-2008 | 21-Feb-2012 |
11 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 03-Apr-2008 | |
12 | 1 | All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses. | 22-Feb-2012 | |
13 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 06-Jun-2025 | |
14 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 06-Jun-2025 | |
15 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 06-Jun-2025 | |
Type | Number | Details |
Caveat | 45H/023 | Pursuant to Section 120AA, Caveat 45H/023 by EAGLE MINING PTY LTD in respect to 100/100ths shares in the name of HELIX RESOURCES LTD lodged against E 09/644 is now effective against this tenement.RECORDED 29 Mar 2007RE: Voluntary Partial Surrender 317659 14 day notice sent on 17 Apr 2009LAPSED:23:59:59 30 April 2009 |
Bond | 282306 | Lodged on 17 Jan 2008 For $10,000.00RECORDED 17 Jan 2008Lodged:00:00 17 January 2008Bond Type:Unconditional Performance BondBond Amount:$10,000.00RECORDED:17 January 2008RETIRED:22 February 2012 |
Bond Requirement | 307560 | Requirement Date:03/04/2008Amount:$10,000.00RECORDED:15:13:34 03 April 2008FINALISED:15:16:54 22 February 2012 |
Partial Surrender - Voluntary | 317659 | Lodged:13:15 08 April 2009Surrendered Blocks:MEEKATHARRA 1039 m, n, o, p, r, s, t, u, w, x, y, z
MEEKATHARRA 1040 l, m, n, o, p, q, r, s, t, u, v, w, x, y, z
MEEKATHARRA 1041 d, e, f, g, h, j, k, l, m, n, o, p, q, r, s, t, u, v, w, x, y, z
MEEKATHARRA 1111 b, c, d, e, g, h, j, k, m, n, o, p, r, s, t, u, w, x, y, z
MEEKATHARRA 1112 a, b, c, d, e, f, g, h, j, k, l, m, n, o, p, q, r, s, v, w, x
MEEKATHARRA 1113 a, b, c, d, e, f, g, h, j, k
MEEKATHARRA 1183 b, c, d, eSurrendered Total:104 BL.REGISTERED:08:30 01 May 2009 |
Caveat | 337754 | Lodged:12:50 24 December 2009Caveat Type:Consent CaveatCaveator:GASCOYNE RESOURCES (WA) PTY LTDShares Caveated:100/100 shares HELIX RESOURCES LTDRECORDED:12:50 24 December 2009WITHDRAWN:15:23 17 December 2018 |
Partial Surrender - Compulsory | 342949 | Lodged:13:06 18 March 2010REJECTED:13:06 18 March 2010 |
Application to Amend | 366497 | Lodged:11:43 25 February 2011Amending:AddressFrom:GASCOYNE RESOURCES (WA) PTY LTD, P O BOX 825, WEST PERTH, WA, 6872To:GASCOYNE RESOURCES (WA) PTY LTD, C/- ANDERSON'S TENEMENT MANAGEMENT, P O BOX 2162, WARWICK, WA, 6024RECORDED:11:43 25 February 2011 |
Conversion | 390751 | New Tenement:M 09/148Application Date:14:12 03 Feb 2012Section:S67Converted 00:00 10 February 2014 being commencement of term of M 09/148 |
Bond | 391634 | Lodged:13:55 17 February 2012Bond Type:Unconditional Performance BondBond Amount:$25,000.00RECORDED:22 February 2012RETIRED - MRF:18 February 2014 |
Bond Requirement | 391918 | Requirement Date:22/02/2012Amount:$25,000.00RECORDED:11:45:07 22 February 2012FINALISED:13:10:34 18 February 2014 |
Deferral of Drop Off | 393992 | Lodged:14:45 26 March 2012RECORDED:14:45 26 March 2012LAPSED:14:45 26 March 2012Section 65(3) Compulsory Surrender for 40% of the licence is not required. |
Extension / Renewal of Term | 393991 | Lodged:14:45 26 March 2012Applied For Period:5 YearsRECORDED:14:45 26 March 2012GRANTED:04 April 2012Granted Period:5 YearsTerm Extended To:28/03/2017 |
Amalgamation | 405677 | Lodged:09:30 07 September 2012Amalgamating:Whole of P 09/471Situated within:External boundaries of E 09/1325Amalgamating:Whole of P 09/472Situated within:External boundaries of E 09/1325Amalgamating:Whole of P 09/473Situated within:External boundaries of E 09/1325Amalgamating:Whole of P 09/474Situated within:External boundaries of E 09/1325Granted 28/03/2014 in respect to P 09/471Granted 28/03/2014 in respect to P 09/472Granted 28/03/2014 in respect to P 09/473Granted 28/03/2014 in respect to P 09/474 |
Application to Amend | 439501 | Lodged:12:15 29 January 2014Amending:AddressFrom:GASCOYNE RESOURCES (WA) PTY LTD, C/- ANDERSON'S TENEMENT MANAGEMENT, PO BOX 2162, WARWICK, WA, 6024To:GASCOYNE RESOURCES (WA) PTY LTD, PO BOX 1340, WEST PERTH, WA, 6872RECORDED:12:15 29 January 2014 |
Partial Surrender - Voluntary | 443722 | Lodged:15:55 07 April 2014Surrendered Blocks:MEEKATHARRA 1038 n, o, p, s, t, u, x, y, z
MEEKATHARRA 1039 l, q, v
MEEKATHARRA 1107 f, g, h, j, k
MEEKATHARRA 1108 a, b, c, d, e, f, g, h, j, k
MEEKATHARRA 1109 a, b, c, d, e, f, g, h, j, k
MEEKATHARRA 1110 a, b, c, d, e, f, g, h, j, k
MEEKATHARRA 1111 a, fSurrendered Total:49 BL.REGISTERED:15:55 07 April 2014 |
Fine | 448564 | Penalty amount:$10,000.00Notification date:30/06/2014Due date:30/07/2014Pursuant to:Section 96A(5)RECORDED:11 June 2014PAYMENT RECEIVED:30 July 2014FINALISED:30 July 2014Receipt Number:06-137543Amount:$10,000.00Remaining balance:$0.00 |
Partial Surrender - Voluntary | 449695 | Lodged:15:00 26 June 2014Surrendered Blocks:MEEKATHARRA 1106 p, s, t, u, x, y
MEEKATHARRA 1107 l, q
MEEKATHARRA 1177 e, h, j, k, m, n, q, r, s
MEEKATHARRA 1178 a, b, c, fSurrendered Total:21 BL.REGISTERED:15:00 26 June 2014 |
Retention Status | 462981 | Lodged:14:40 24 February 2015RECORDED:14:40 24 February 2015WITHDRAWN:08:30 04 December 2015 |
Extension / Renewal of Term | 503074 | Lodged:15:40:50 22 March 2017Applied For Period:2 YearsRECORDED:15:40:50 22 March 2017GRANTED:15 June 2017Granted Period:2 YearsTerm Extended To:28/03/2019 |
Application to Amend | 505945 | Lodged:15:51:21 08 May 2017Amending:Address (Including DTC Details)From:Principal Place of Business : GASCOYNE RESOURCES (WA) PTY LTD, SAME AS CORRESPONDENCE and DTC :GASCOYNE RESOURCES (WA) PTY LTD, PO BOX 1340, WEST PERTH, WA, 6872To:Principal Place of Business : GASCOYNE RESOURCES (WA) PTY LTD, C/- STS, PO BOX 1340, WEST PERTH, WA, 6872, xxxx@strategictenements.com, xxxxxxx036 and DTC :GASCOYNE RESOURCES (WA) PTY LTD, STS, C/- STS, PO BOX 1340, WEST PERTH, WA, 6872, xxxx@strategictenements.com, xxxxxxx036RECORDED:15:51:21 08 May 2017 |
Mortgage | 544596 | Lodged:15:25 12 December 2018Mortgaged Shares:100/100 shares GASCOYNE RESOURCES (WA) PTY LTDMortgagee:NATIONAL AUSTRALIA BANK LIMITEDREGISTERED:15:25 12 December 2018Full Discharge:588636 Registered 14:55 21 October 2020DISCHARGED:14:55 21 October 2020 |
Withdrawal of Dealing | 544876 | Lodged:15:23 17 December 2018In respect to:Caveat 337754RECORDED:15:23 17 December 2018 |
Extension / Renewal of Term | 549975 | Lodged:11:55:39 22 March 2019Applied For Period:2 YearsRECORDED:11:55:39 22 March 2019GRANTED:28 May 2019Granted Period:2 YearsTerm Extended To:28/03/2021 |
Caveat | 562304 | Lodged:09:56:27 04 September 2019Caveat Type:Consent CaveatCaveator:FRANCO-NEVADA AUSTRALIA PTY LTDShares Caveated:100/100 shares GASCOYNE RESOURCES (WA) PTY LTDREJECTED:09:56:27 04 September 2019Relodged:14:31 02 October 2019Caveat Type:Consent CaveatCaveator:FRANCO-NEVADA AUSTRALIA PTY LTDShares Caveated:100/100 shares GASCOYNE RESOURCES (WA) PTY LTDRECORDED:14:31 02 October 2019RE: Mortgages 677906, 677907 and 677910, Order by Warden made 17/10/2023 pursuant to section 122D(1) that mortgages may be registered and Caveat to remain in full force and effect.RE: Mortgage 689599, Order by Warden made 22/01/2024 pursuant to section 122D(1) that mortgage may be registered and Caveat to remain in full force and effect. |
Mortgage - Discharge | 588636 | Lodged:14:55 21 October 2020In respect to:Mortgage 544596REGISTERED:14:55 21 October 2020 |
Extension / Renewal of Term | 618875 | Lodged:08:30 26 March 2021Applied For Period:2 YearsRECORDED:08:30 26 March 2021GRANTED:28 April 2021Granted Period:2 YearsTerm Extended To:28/03/2023 |
Conversion | 619333 | Section:S67Application Date:12:54:11 31 Mar 2021New Tenement:M 09/181 |
Extension / Renewal of Term | 671703 | Lodged:12:25:17 24 March 2023Applied For Period:2 YearsRECORDED:12:25:17 24 March 2023GRANTED:25 July 2023Granted Period:2 YearsTerm Extended To:28/03/2025 |
Mortgage | 677906 | Lodged:09:35:27 07 June 2023REJECTED:09:35:27 07 June 2023Relodged:15:15 30 August 2023Mortgaged Shares:100/100 shares GASCOYNE RESOURCES (WA) PTY LTDMortgagee:TEMBO CAPTITAL MINING FUND III (F&F) LPREGISTERED:15:28 17 October 2023Mortgage Transfer:722578 Registered 14:32 18 March 2025New Mortgagee:OSISKO GOLD ROYALTIES (AUSTRALIA) PTY LTD |
Mortgage | 677907 | Lodged:09:44:16 07 June 2023REJECTED:09:44:16 07 June 2023Relodged:15:15 30 August 2023Mortgaged Shares:100/100 shares GASCOYNE RESOURCES (WA) PTY LTDMortgagee:TEMBO CAPITAL MINING FUND III LPREGISTERED:15:28 17 October 2023Mortgage Transfer:722579 Registered 14:32 18 March 2025New Mortgagee:OSISKO GOLD ROYALTIES (AUSTRALIA) PTY LTD |
Mortgage | 677910 | Lodged:09:48:06 07 June 2023REJECTED:09:48:06 07 June 2023Relodged:15:15 30 August 2023Mortgaged Shares:100/100 shares GASCOYNE RESOURCES (WA) PTY LTDMortgagee:TEMBO CAPITAL MINING FUND III (NON-US) LPREGISTERED:15:28 17 October 2023Mortgage Transfer:722580 Registered 14:32 18 March 2025New Mortgagee:OSISKO GOLD ROYALTIES (AUSTRALIA) PTY LTD |
Mortgage | 689599 | Lodged:11:52:04 08 November 2023Mortgaged Shares:100/100 shares GASCOYNE RESOURCES (WA) PTY LTDMortgagee:DEUTSCHE BALATON AKTIENGESELLSCHAFTREGISTERED:10:00 22 January 2024DISCHARGED:10:38:09 16 May 2024Full Discharge:704252 Registered 10:38:09 16 May 2024 |
Mortgage - Discharge | 704252 | Lodged:10:38:09 16 May 2024In respect to:Mortgage 689599REGISTERED:10:38:09 16 May 2024 |
Mortgage - Transfer | 722578 | Lodged:13:01:59 20 December 2024In respect to:Mortgage 677906From:TEMBO CAPTITAL MINING FUND III (F&F) LPTo:OSISKO GOLD ROYALTIES (AUSTRALIA) PTY LTDOn 18 March 2025, Warden McPhee gave consent for the registration of Transfer of Mortgage 72258-722580 while caveats 562303-4 remain in force.REGISTERED:14:32 18 March 2025 |
Mortgage - Transfer | 722579 | Lodged:13:01:59 20 December 2024In respect to:Mortgage 677907From:TEMBO CAPITAL MINING FUND III LPTo:OSISKO GOLD ROYALTIES (AUSTRALIA) PTY LTDOn 18 March 2025, Warden McPhee gave consent for the registration of Transfer of Mortgage 72258-722580 while caveats 562303-4 remain in force.REGISTERED:14:32 18 March 2025 |
Mortgage - Transfer | 722580 | Lodged:13:01:59 20 December 2024In respect to:Mortgage 677910From:TEMBO CAPITAL MINING FUND III (NON-US) LPTo:OSISKO GOLD ROYALTIES (AUSTRALIA) PTY LTDOn 18 March 2025, Warden McPhee gave consent for the registration of Transfer of Mortgage 72258-722580 while caveats 562303-4 remain in force.REGISTERED:14:32 18 March 2025 |
Mortgage - Transfer | 722632 | Lodged:14:32:47 20 December 2024In respect to:Mortgage 677906To:OSISKO GOLD ROYALTIES (AUSTRALIA) PTY LTDREJECTED:14:32:47 20 December 2024 |
Mortgage - Transfer | 722633 | Lodged:14:32:47 20 December 2024In respect to:Mortgage 677907To:OSISKO GOLD ROYALTIES (AUSTRALIA) PTY LTDREJECTED:14:32:47 20 December 2024 |
Mortgage - Transfer | 722634 | Lodged:14:32:47 20 December 2024In respect to:Mortgage 677910To:OSISKO GOLD ROYALTIES (AUSTRALIA) PTY LTDREJECTED:14:32:47 20 December 2024 |
Mortgage | 722647 | Lodged:15:05:51 20 December 2024Mortgaged Shares:100/100 shares GASCOYNE RESOURCES (WA) PTY LTDMortgagee:OSISKO GOLD ROYALTIES (AUSTRALIA) PTY LTDREGISTERED:16:27 13 February 2025 |
Caveat | 725914 | Lodged:08:30 17 February 2025Caveat Type:Consent CaveatCaveator:OSISKO GOLD ROYALTIES (AUSTRALIA) PTY LTDShares Caveated:100/100 shares GASCOYNE RESOURCES (WA) PTY LTDRECORDED:08:30 17 February 2025 |
Extension / Renewal of Term | 729287 | Lodged:08:30 26 March 2025Applied For Period:2 YearsRECORDED:08:30 26 March 2025GRANTED:30 June 2025Granted Period:2 YearsTerm Extended To:28/03/2027 |