1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion. | 26-Nov-1993 | |
2 | 2 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 12-Aug-2005 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the District Mining Engineer. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the District Mining Engineer. | 26-Nov-1993 | 11-Aug-2005 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration programme. | 26-Nov-1993 | |
4 | 2 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Aug-2005 | |
4 | 1 | Unless the written approval of the District Mining Engineer is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 26-Nov-1993 | 11-Aug-2005 |
5 | 1 | No interference with Bench Mark ZS 26 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 26-Nov-1993 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion. | 26-Nov-1993 | |
2 | 2 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 12-Aug-2005 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the District Mining Engineer. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the District Mining Engineer. | 26-Nov-1993 | 11-Aug-2005 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration programme. | 26-Nov-1993 | |
4 | 2 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Aug-2005 | |
4 | 1 | Unless the written approval of the District Mining Engineer is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 26-Nov-1993 | 11-Aug-2005 |
5 | 1 | No interference with Bench Mark ZS 26 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 26-Nov-1993 | |
Type | Number | Details |
Application to Amend | CA9/923 | Lodged 9:15 AM on 30 Jun 1993 amending Plan name to read: "Hammersley Range" on Attachment 1.REGISTERED 9:15 AM 30 Jun 1993 |
Exemption from Drop-off | 551H/967 | Lodged 2:30 PM on 12 Aug 1996 applying for relief from the provisions of Section 65(1)(a)GRANTED 27 Oct 1997 |
Exemption from Drop-off | 92H/978 | Lodged 9:30 AM on 15 Jul 1997 applying for relief from the provisions of Section 65(1)(b)GRANTED 27 Oct 1997 |
Extension / Renewal of Term | CA6/978 | Lodged 9:42 AM on 10 Feb 1998 for a further period of 1 YearRECORDED 9:42 AM 10 Feb 1998GRANTED 07 Jan 2000 |
Extension / Renewal of Term | CA2/989 | Lodged 9:20 AM on 07 Oct 1998 for a further period of 1 YearRECORDED 9:20 AM 07 Oct 1998GRANTED 07 Jan 2000 |
Extension / Renewal of Term | CA6/990 | Lodged 9:00 AM on 03 Feb 2000 for a further period of 1 YearRECORDED 9:00 AM 03 Feb 2000GRANTED 07 Mar 2001 |
Extension / Renewal of Term | CA1/012 | Lodged 9:00 AM on 10 Oct 2001 for a further period of 1 YearRECORDED 9:00 AM 10 Oct 2001GRANTED 27 Nov 2001 |
Extension / Renewal of Term | CA9/023 | Lodged on 15 Oct 2002 for a further period of 1 YearRECORDED 15 Oct 2002GRANTED 06 Mar 2003 |
Extension / Renewal of Term | KR33/034 | Lodged 10:31:00 AM on 27 Oct 2003 applied for a period of 1 YearsRECORDED 10:31 AM 27 Oct 2003GRANTED 25 Mar 2004 for a further period of 1 Year |
Extension / Renewal of Term | KR46/045 | Lodged 11:00:00 AM on 16 Sep 2004 applied for a period of 1 YearsRECORDED 11:00 AM 16 Sep 2004GRANTED 24 Nov 2004 for a further period of 1 Year. |
Extension / Renewal of Term | KR47/056 | Lodged 10:16:00 AM on 15 Sep 2005 applied for a period of 1 YearsRECORDED 10:16 AM 15 Sep 2005GRANTED 04 Oct 2005 for a further period of 1 Year |
Extension / Renewal of Term | KR67/067 | Lodged 2:30:00 PM on 28 Sep 2006 applied for a period of 1 YearsRECORDED 2:30 PM 28 Sep 2006GRANTED 11 Oct 2006 for a further period of 1 Year. |
Extension / Renewal of Term | 276484 | Lodged 11:06:00 AM on 17 Oct 2007 applied for a period of 1 YearsRECORDED 11:06 AM 17 Oct 2007GRANTED 22 Jan 2008 for a further period of 1 Year |
Extension / Renewal of Term | 301535 | Lodged 9:35:00 AM on 10 Oct 2008 applied for a period of 1 YearsRECORDED 9:35 AM 10 Oct 2008GRANTED 11 Nov 2008 for a further period of 1 Year. |
Extension / Renewal of Term | 332831 | Lodged:11:38 20 October 2009Applied For Period:1 YearsRECORDED:11:38 20 October 2009GRANTED:05 February 2010Granted Period:1 YearsTerm Extended To:25/11/2010 |
Copy Document | 332835 | Lodged:11:38 20 October 2009ISSUED:11:38 20 October 2009 |
Extension / Renewal of Term | 357994 | Lodged:11:39 22 October 2010Applied For Period:1 YearsRECORDED:11:39 22 October 2010GRANTED:04 November 2010Granted Period:1 YearsTerm Extended To:25/11/2011 |
Extension / Renewal of Term | 381703 | Lodged:09:30 21 September 2011Applied For Period:1 YearsRECORDED:09:30 21 September 2011GRANTED:03 October 2011Granted Period:1 YearsTerm Extended To:25/11/2012 |
Extension / Renewal of Term | 408177 | Lodged:09:30 09 October 2012Applied For Period:1 YearsRECORDED:09:30 09 October 2012GRANTED:26 October 2012Granted Period:1 YearsTerm Extended To:25/11/2013 |
Amalgamation | 411331 | Lodged:12:37 20 November 2012Amalgamating:Portion of P 08/584-ISituated within:External boundaries of E 08/660-IAmalgamating:Whole of P 08/602Situated within:External boundaries of E 08/660-IWithdrawn 14/08/2014 in respect to P 08/584-IWithdrawn 14/08/2014 in respect to P 08/602 |
Copy Document | 435710 | Lodged:16:25 22 November 2013In lieu of lost licence documentRECORDED:16:25 22 November 2013ISSUED:08:10 26 November 2013 |
Extension / Renewal of Term | 435712 | Lodged:16:25 22 November 2013Applied For Period:1 YearsRECORDED:16:25 22 November 2013GRANTED:27 November 2013Granted Period:1 YearsTerm Extended To:25/11/2014 |
Extension / Renewal of Term | 457119 | Lodged:14:42:13 03 November 2014Applied For Period:1 YearsRECORDED:14:42:13 03 November 2014GRANTED:04 November 2014Granted Period:1 YearsTerm Extended To:25/11/2015 |
Extension / Renewal of Term | 472804 | Lodged:15:33:35 13 August 2015Applied For Period:1 YearsRECORDED:15:33:35 13 August 2015GRANTED:19 August 2015Granted Period:1 YearsTerm Extended To:25/11/2016 |
Extension / Renewal of Term | 492528 | Lodged:14:23:29 18 August 2016Applied For Period:1 YearsRECORDED:14:23:29 18 August 2016GRANTED:11 October 2016Granted Period:1 YearsTerm Extended To:25/11/2017 |
Extension / Renewal of Term | 504060 | Lodged:11:47:38 06 April 2017Applied For Period:1 YearsRECORDED:11:47:38 06 April 2017GRANTED:14 July 2017Granted Period:1 YearsTerm Extended To:25/11/2018 |
Application to Amend | 518670 | Lodged:16:16:51 20 November 2017Amending:Address (Including DTC Details)From:Principal Place of Business : MINERALOGY PTY LTD, SAME AS CORRESPONDENCE and DTC :MINERALOGY PTY LTD, PO BOX 1538, BRISBANE, QLD, 4001To:Principal Place of Business : MINERALOGY PTY LTD, GPO BOX 1538, BRISBANE, QLD, 4001, xxxxxxxxxxxx@mineralogy.com.au, xxxxxxx229 and DTC :MINERALOGY PTY LTD, CHRIS SPIELVOGEL, GPO BOX 1538, BRISBANE, QLD, 4001, xxxxxxxxxxxx@mineralogy.com.au, xxxxxxx229RECORDED:16:16:51 20 November 2017 |
Extension / Renewal of Term | 530799 | Lodged:12:27:57 21 May 2018Applied For Period:1 YearsRECORDED:12:27:57 21 May 2018GRANTED:25 July 2018Granted Period:1 YearsTerm Extended To:25/11/2019 |
Extension / Renewal of Term | 557845 | Lodged:10:18:09 04 July 2019Applied For Period:1 YearsRECORDED:10:18:09 04 July 2019GRANTED:02 December 2019Granted Period:1 YearsTerm Extended To:25/11/2020 |