Extracted from MTO on 28-Jun-2025 00:36,
last changed 28-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 08-Oct-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 08-Oct-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 08-Oct-2019 | |
4 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 08-Oct-2019 | |
5 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 08-Oct-2019 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 08-Oct-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 08-Oct-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 08-Oct-2019 | |
4 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 08-Oct-2019 | |
5 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 08-Oct-2019 | |
Type | Number | Details |
Miscellaneous Entry | | In the Karratha Warden's Court on the 21 February, 2019 a ballot was conducted to determine priority between applications for Exploration Licences 08/3011, 08/3012, 08/3013 and 08/3014 only in respect to Hamersley Range Primary Blocks No. 2333 z, 2405 e and 2405 a:
1st Drawn: E08/3013
2nd Drawn: E08/3012
3rd Drawn: E08/3011
4th Drawn: E08/3014 |
Miscellaneous Entry | | In the Karratha Warden's Court on the 21 February, 2019 a ballot was conducted to determine priority between applications for Exploration Licences 08/3011, 08/3013 and 08/3014 only in respect to Hamersley Range Primary Blocks No. 2333 w, x and y and 2405 d:
1st Drawn: E08/3013
2nd Drawn: E08/3011
3rd Drawn: E08/3014 |
Application to Amend | 561447 | Lodged:15:26:34 22 August 2019Amending:Address (Including DTC Details)From:Principal Place of Business : LMTD PILBARA PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400 and DTC :LMTD PILBARA PTY LTD, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400To:Principal Place of Business : LMTD PILBARA PTY LTD, SUITE 319, 566 ST KILDA ROAD, MELBOURNE, VIC, 3004, xxxxxxx@lmtd.com.au, xxxxxxx271 and DTC :LMTD PILBARA PTY LTD, LMTD PILBARA PTY LTD, SUITE 319, 566 ST KILDA ROAD, MELBOURNE, VIC, 3004, xxxxxxx@lmtd.com.au, xxxxxxx271RECORDED:15:26:34 22 August 2019 |
Surrender - Outright | 574982 | Lodged:14:39:47 26 March 2020REGISTERED:14:39:47 26 March 2020 |