Tenement: E08-3010

View on Landtracker Maps (logon required)

Extracted from MTO on 11-Jul-2025 00:55, last changed 04-Jul-2025.

Tenement Summary

Identifier:E 08/3010Type:Exploration Licence
Status:LiveDistrict:ASHBURTON M.F.
Lodged:ONLINEArea:10 BL
Purposes:Term:5 Years
Markout:Received:29-Jun-2018 14:11
Commence:29-May-2020 Expiry:28-May-2025

Holders

Company NameSharesTotal Shares
SKRYNE HILL PTY LTD100100

Applicants on Receival

Company NameSharesTotal Shares
SKRYNE HILL PTY LTD100100

Shires

Shire NameShire NumberStartArea
ASHBURTON SHIRE25029-Jun-2018 10.00000 BL

Conditions

#VerTextStartEnd
12All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety.18-Dec-2024
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety.29-May-2020 17-Dec-2024
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.29-May-2020
31Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.29-May-2020
41The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.29-May-2020
51The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
29-May-2020
61No excavation, excepting shafts, approaching closer to the North West Coastal Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the North West Coastal Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface.29-May-2020
71No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface.29-May-2020
81No interference with Geodetic Survey Station KAP 6 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.29-May-2020
1Consent to explore on De Grey Mullewa Stock Route Reserve 9701 granted subject to the following condition:29-May-2020
91No exploration activities being carried out on De Grey Mullewa Stock Route Reserve 9701 which restrict the use of the reserve.29-May-2020
101All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety.18-Dec-2024
111The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request.18-Dec-2024
121All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work.18-Dec-2024

Endorsements

Cond #VerTextStartEnd
12All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety.18-Dec-2024
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety.29-May-2020 17-Dec-2024
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.29-May-2020
31Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.29-May-2020
41The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.29-May-2020
51The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
29-May-2020
61No excavation, excepting shafts, approaching closer to the North West Coastal Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the North West Coastal Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface.29-May-2020
71No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface.29-May-2020
81No interference with Geodetic Survey Station KAP 6 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.29-May-2020
1Consent to explore on De Grey Mullewa Stock Route Reserve 9701 granted subject to the following condition:29-May-2020
91No exploration activities being carried out on De Grey Mullewa Stock Route Reserve 9701 which restrict the use of the reserve.29-May-2020
101All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety.18-Dec-2024
111The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request.18-Dec-2024
121All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work.18-Dec-2024

Dealings

TypeNumberDetails
Extension / Renewal of Term734153Lodged:08:30 23 May 2025Applied For Period:5 YearsRECORDED:08:30 23 May 2025

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202627-May-2025 53942927689$4,140.0010 BL29-May-2020 $4,140.00$0.00
Rental202529-May-2024 10581211$2,890.0010 BL29-May-2020 $2,890.00$0.00
Rental202429-May-2023 10364887$2,750.0010 BL29-May-2020 $2,750.00$0.00
Rental202319-May-2022 23728348283$1,460.0010 BL29-May-2020 $1,460.00$0.00
Rental202201-Jun-2021 14083698557$1,410.0010 BL29-May-2020 $1,410.00$0.00
Rental202129-Jun-2018 84839978611$1,340.0010 BL29-May-2020 $1,340.00$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2026$50,000.00false
2025$30,000.0001-Jul-2025 $41,753.00$31,311.00$0.00$0.00$4,442.00$6,000.00$0.00false
2024$30,000.0019-Jul-2024 $39,024.00$28,295.00$0.00$0.00$4,225.00$6,504.00$0.00false
2023$20,000.0027-Jul-2023 $30,640.00$23,638.00$0.00$0.00$2,809.00$4,193.00$0.00false
2022$20,000.0027-Jul-2022 $34,849.00$27,717.00$0.00$0.00$2,713.00$4,419.00$0.00false
2021$20,000.0013-Jul-2021 $32,974.00$24,750.00$0.00$0.00$2,729.00$5,495.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
06-Sep-2018 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2018-10-032019-02-03CLEARED - Expedited Applies2020-05-2910 BL213530S115540E44.2km W'ly of PannawonicaWO2018/10262018-12-13WC1999/012Objection Withdrawn2020-05-28Kuruma Marthudunera Part B(WCD2018/003)WC1999/012WAD6090/1998falseWCD2018/003EXISTNoKuruma Marthudunera (Part A)(WCD2016/006)WC1999/012WAD6090/1998falseWCD2016/006EXISTNo12PilbaraYamatji Marlpa Aboriginal Corporation