Extracted from MTO on 07-Jul-2025 00:59,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 13-Dec-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 13-Dec-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 13-Dec-2019 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 13-Dec-2019 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 13-Dec-2019 | |
6 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 13-Dec-2019 | |
7 | 1 | No interference with Geodetic Survey Station NMF 570 and Palgrave and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 13-Dec-2019 | |
8 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained, with the concurrence of the Minister for Environment, before entering or commencing any prospecting or exploration activity on Conservation of Flora and Fauna Reserve 26808. | 13-Dec-2019 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 13-Dec-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 13-Dec-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 13-Dec-2019 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 13-Dec-2019 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 13-Dec-2019 | |
6 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 13-Dec-2019 | |
7 | 1 | No interference with Geodetic Survey Station NMF 570 and Palgrave and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 13-Dec-2019 | |
8 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained, with the concurrence of the Minister for Environment, before entering or commencing any prospecting or exploration activity on Conservation of Flora and Fauna Reserve 26808. | 13-Dec-2019 | |
Type | Number | Details |
Objection | 534076 | Lodged:11:35 02 July 2018Objectors:THALANYJI ENTERPRISES PTY LTDObjection Type:Tenement ApplicationRECORDED:11:35 02 July 2018WITHDRAWN:16:23 25 October 2018 |
Application to Amend | 665146 | Lodged:15:10 09 December 2022Amending:Address (Including DTC Details)From:Principal Place of Business : SOUTH COAST MINERALS PTY LTD, C/- MKII CONSULTING PTY LTD, PO BOX 753, WEMBLEY, WA, 6913, xxxxxx@mk2consulting.com.au, xxxxxx555 and DTC :SOUTH COAST MINERALS PTY LTD, SOUTH COAST MINERALS PTY LTD, C/- MKII CONSULTING PTY LTD, PO BOX 753, WEMBLEY, WA, 6913, xxxxxx@mk2consulting.com.au, xxxxxx555To:Principal Place of Business : SOUTH COAST MINERALS PTY LTD, LEVEL 2, 7 HAVELOCK STREET, WEST PERTH, WA, 6005 and DTC :SOUTH COAST MINERALS PTY LTD, MARCO TENTORI, C/- ANDERSON'S TENEMENT MANAGEMENT, PO BOX 2162, WARWICK, WA, 6024, xxxxxx@atmwa.net.au, xxxxxxxxx095RECORDED:15:10 09 December 2022 |
Extension / Renewal of Term | 721499 | Lodged:15:57:21 09 December 2024Applied For Period:5 YearsRECORDED:15:57:21 09 December 2024GRANTED:07 February 2025Granted Period:5 YearsTerm Extended To:12/12/2029 |