1 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 19-May-2025 | |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 22-Aug-2019 | 18-May-2025 |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 22-Aug-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 22-Aug-2019 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 22-Aug-2019 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 22-Aug-2019 | |
6 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 19-May-2025 | |
7 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 19-May-2025 | |
8 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 19-May-2025 | |
Cond # | Ver | Text | Start | End |
1 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 19-May-2025 | |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 22-Aug-2019 | 18-May-2025 |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 22-Aug-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 22-Aug-2019 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 22-Aug-2019 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 22-Aug-2019 | |
6 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 19-May-2025 | |
7 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 19-May-2025 | |
8 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 19-May-2025 | |
Type | Number | Details |
Miscellaneous Entry | | In the Karratha Warden's Court on the 21 February, 2019 a ballot was conducted to determine priority between applications for Exploration Licences 08/2994 and 08/2997 only in respect to Hamersley Range Primary Blocks No. 3061 z and 3062 v:
1st Drawn: E08/2997
2nd Drawn: E08/2994 |
Application to Amend | 590885 | Lodged:15:41:06 20 November 2020Amending:Address (Including DTC Details)From:Principal Residence : GIANNI, Peter Romeo, 11 PURNA PLACE, HANNANS, WA, 6430 and DTC :GIANNI, Peter Romeo, PETER GIANNI, 11 PURNA PLACE, HANNANS, WA, 6430, xxx@jmsons.com.au, xxxxxxx383To:Principal Residence : GIANNI, Peter Romeo, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008, xxxxx@mmwc.com.au, xxxxxxxxx866 and DTC :GIANNI, Peter Romeo, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008, xxxxx@mmwc.com.au, xxxxxxxxx866RECORDED:15:41:06 20 November 2020 |
Extension / Renewal of Term | 712673 | Lodged:13:22:37 19 August 2024Applied For Period:5 YearsRECORDED:13:22:37 19 August 2024GRANTED:21 October 2024Granted Period:5 YearsTerm Extended To:21/08/2029 |
Application to Amend | 713134 | Lodged:10:01:29 26 August 2024Amending:Address (Including DTC Details)From:Principal Place of Business : GARDNER MINING PTY LTD, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008, xxxxx@mmwc.com.au, xxxxxxxxx866 and DTC :GARDNER MINING PTY LTD, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008, xxxxx@mmwc.com.au, xxxxxxxxx866To:Principal Place of Business : GARDNER MINING PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997 and DTC :GARDNER MINING PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997RECORDED:10:01:29 26 August 2024 |