Tenement: E08-2990

View on Landtracker Maps (logon required)

Extracted from MTO on 08-Jul-2025 01:16, last changed 26-Jun-2025.

Tenement Summary

Identifier:E 08/2990Type:Exploration Licence
Status:LiveDistrict:ASHBURTON M.F.
Lodged:ONLINEArea:1 BL
Purposes:Term:5 Years (Extended)
Markout:Received:06-Apr-2018 08:30
Commence:24-Sep-2019 Expiry:23-Sep-2029

Holders

Company NameSharesTotal Shares
ROCKLEA GOLD PTY LTD100100

Applicants on Receival

Company NameSharesTotal Shares
ROCKLEA GOLD PTY LTD100100

Shires

Shire NameShire NumberStartArea
ASHBURTON SHIRE25006-Apr-2018 1.00000 BL

Conditions

#VerTextStartEnd
11All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.24-Sep-2019
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety.24-Sep-2019
31The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.24-Sep-2019
41Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.24-Sep-2019
51The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the licence; or
  • registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
24-Sep-2019

Endorsements

Cond #VerTextStartEnd
11All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.24-Sep-2019
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety.24-Sep-2019
31The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.24-Sep-2019
41Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.24-Sep-2019
51The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the licence; or
  • registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
24-Sep-2019

Dealings

TypeNumberDetails
Extension / Renewal of Term714733Lodged:08:53:39 16 September 2024Applied For Period:5 YearsRECORDED:08:53:39 16 September 2024GRANTED:19 November 2024Granted Period:5 YearsTerm Extended To:23/09/2029

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202503-Sep-2024 10655851$469.001 BL24-Sep-2019 $469.00$0.00
Rental202401-Sep-2023 10403448$447.001 BL24-Sep-2019 $447.00$0.00
Rental202323-Sep-2022 10291567$426.001 BL24-Sep-2019 $426.00$0.00
Rental202216-Sep-2021 10220881$406.001 BL24-Sep-2019 $406.00$0.00
Rental202116-Sep-2020 10163952$369.001 BL24-Sep-2019 $369.00$0.00
Rental202006-Apr-2018 82565178989$322.001 BL24-Sep-2019 $322.00$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2025$15,000.00false
2024$10,000.0014-Nov-2024 $22,126.00$19,275.33$0.00$0.00$1,797.00$1,053.67$0.00false
2023$10,000.0016-Nov-2023 $19,086.00$14,880.35$0.00$0.00$1,716.00$2,489.65$0.00false
2022$10,000.0018-Nov-2022 $12,517.00$9,215.24$0.00$0.00$1,669.00$1,632.76$0.00false
2021$10,000.0015-Nov-2021 $10,850.00$6,812.00$0.00$0.00$2,623.00$1,415.00$0.00false
2020$10,000.0012-Nov-2020 $15,218.00$10,105.00$0.00$0.00$2,577.00$2,536.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
29-May-2018 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2018-06-082018-10-08CLEARED - Expedited Applies2019-09-231 BL224129S1161630E117km S'ly of PannawonicaWO2018/07812018-10-04WC2001/005Objection Withdrawn2019-09-20Puutu Kunti Kurrama People and Pinikura People #1 and #2(WCD2015/003)WC2001/005WAD6007/2001trueWCD2015/003BOTHNo12PilbaraYamatji Marlpa Aboriginal Corporation