Tenement: E08-2987

View on Landtracker Maps (logon required)

Extracted from MTO on 09-Jul-2025 00:20, last changed 30-Jun-2025.

Tenement Summary

Identifier:E 08/2987Type:Exploration Licence
Status:DeadDistrict:ASHBURTON M.F.
Lodged:ONLINEArea:9 BL
Purposes:Term:5 Years
Markout:Received:07-Mar-2018 14:45
Commence:11-Oct-2018 Expiry:10-Oct-2023

Holders

Company NameSharesTotal Shares
FMG PILBARA PTY LTD100100

Applicants on Receival

Company NameSharesTotal Shares
FMG PILBARA PTY LTD100100

Shires

Shire NameShire NumberStartArea
ASHBURTON SHIRE25007-Mar-2018 9.00000 BL

Conditions

#VerTextStartEnd
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS.11-Oct-2018
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.11-Oct-2018
31Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.11-Oct-2018
41The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.11-Oct-2018
51The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the licence; or
  • registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
11-Oct-2018
61No activities being carried out within the proposed Hardey rail corridor (designated FNA 9198 ) that interfere with or restrict any rail route investigation activities being undertaken by the rail line proponent.11-Oct-2018

Endorsements

Cond #VerTextStartEnd
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS.11-Oct-2018
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.11-Oct-2018
31Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.11-Oct-2018
41The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.11-Oct-2018
51The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the licence; or
  • registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
11-Oct-2018
61No activities being carried out within the proposed Hardey rail corridor (designated FNA 9198 ) that interfere with or restrict any rail route investigation activities being undertaken by the rail line proponent.11-Oct-2018

Dealings

TypeNumberDetails
Surrender - Outright559608Lodged:08:30 01 August 2019REGISTERED:08:30 01 August 2019

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental201907-Mar-2018 81762607155$1,206.009 BL11-Oct-2018 $1,206.00$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2019$16,667.0012-Sep-2019 $2,746.00$711.00$0.00$0.00$2,035.00$0.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
08-May-2018 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2018-05-252018-09-25CLEARED - Expedited Applies2018-10-109 BL224559S1163959E114km NW'ly of ParaburdooPuutu Kunti Kurrama People and Pinikura People #1 and #2(WCD2015/003)WC2005/004WAD126/2005falseWCD2015/003BOTHNoPuutu Kunti Kurrama People and Pinikura People #1 and #2(WCD2015/003)WC2001/005WAD6007/2001falseWCD2015/003BOTHNo12PilbaraYamatji Marlpa Aboriginal Corporation