Extracted from MTO on 01-Jul-2025 00:18,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 30-Aug-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 30-Aug-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 30-Aug-2019 | |
| 1 | In respect to the area designated as CPL 44 in TENGRAPH the following conditions apply: | 30-Aug-2019 | |
4 | 1 | Prior to any ground-disturbing activity, as defined by the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety (DMIRS) the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Resource and Environmental Compliance, DMIRS. The program to include:
- maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
- the purpose, specifications and life of all proposed disturbances;
- proposals which may disturb any declared rare or geographically restricted flora and fauna; and
- techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
| 30-Aug-2019 | |
5 | 1 | The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Resource and Environmental Compliance, DMIRS. Such rehabilitation as is appropriate and may include:
- stockpiling and return of topsoil;
- backfilling all holes, trenches and costeans;
- ripping;
- contouring to the original landform;
- revegetation with seed; and
- capping and backfilling of all drill holes.
| 30-Aug-2019 | |
6 | 1 | Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMIRS and arranging an inspection as required. | 30-Aug-2019 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 30-Aug-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 30-Aug-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 30-Aug-2019 | |
| 1 | In respect to the area designated as CPL 44 in TENGRAPH the following conditions apply: | 30-Aug-2019 | |
4 | 1 | Prior to any ground-disturbing activity, as defined by the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety (DMIRS) the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Resource and Environmental Compliance, DMIRS. The program to include:
- maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
- the purpose, specifications and life of all proposed disturbances;
- proposals which may disturb any declared rare or geographically restricted flora and fauna; and
- techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
| 30-Aug-2019 | |
5 | 1 | The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Resource and Environmental Compliance, DMIRS. Such rehabilitation as is appropriate and may include:
- stockpiling and return of topsoil;
- backfilling all holes, trenches and costeans;
- ripping;
- contouring to the original landform;
- revegetation with seed; and
- capping and backfilling of all drill holes.
| 30-Aug-2019 | |
6 | 1 | Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMIRS and arranging an inspection as required. | 30-Aug-2019 | |
Type | Number | Details |
Forfeiture | 590752 | Initiated:20/11/2020 for non-compliance with reporting requirements( Form 5 )RECORDED:09:16:38 20 November 2020Notice Issued:Regulation 50 Notice sent 20/11/2020 for non-compliance with expenditure requirements pursuant to Reg 22/Sec 63A- late lodgement of Form 5.Compliance Date:07/01/2021FINALISED:Order by Minister on 28 January 2021 that E 08/2978 be Penalty Imposed |
Fine | 594985 | Fine in respect to:Forfeiture Process 590752Fine reason:Non-compliance with expenditure obligationsPenalty amount:$270.00Notification date:28/01/2021Due date:04/03/2021Pursuant to:Section 96A(5)RECORDED:28 January 2021PAYMENT RECEIVED:01 March 2021FINALISED:01 March 2021Receipt Number:10185446Amount:$270.00Remaining balance:$0.00 |
Caveat | 645662 | Lodged:15:19:16 24 March 2022Caveat Type:Consent CaveatCaveator:CHALLA RESOURCES PTY LTDShares Caveated:100/100 shares NORTH WEST STONE PTY LTDRECORDED:15:19:16 24 March 2022WITHDRAWN:08:30 04 June 2024 |
Application to Amend | 678732 | Lodged:08:30 19 June 2023Amending:Address (Including DTC Details)From:Principal Place of Business : NORTH WEST STONE PTY LTD, PO BOX 1088, WEST PERTH, WA, 6872 and DTC :NORTH WEST STONE PTY LTD, STEVE MILLWARD, PO BOX 1088, WEST PERTH, WA, 6872, xxxxxxxx@alikabier.com, xxxxxxx398To:Principal Place of Business : NORTH WEST STONE PTY LTD, 36 METTAM STREET, TRIGG, WA, 6029, xxxxxxxxxxx@hotmail.com and DTC :NORTH WEST STONE PTY LTD, NEIL BOWIE, 36 METTAM STREET, TRIGG, WA, 6029, xxxxxxxxxxx@hotmail.comREJECTED:08:30 19 June 2023 |
Withdrawal of Dealing | 705617 | Lodged:08:30 04 June 2024In respect to:Caveat 645662RECORDED:08:30 04 June 2024 |
Extension / Renewal of Term | 711641 | Lodged:14:16:36 06 August 2024Applied For Period:5 YearsRECORDED:14:16:36 06 August 2024GRANTED:15 October 2024Granted Period:5 YearsTerm Extended To:29/08/2029 |
Application to Amend | 712304 | Lodged:12:03 13 August 2024Amending:Address (Including DTC Details)From:Principal Place of Business : NORTH WEST STONE PTY LTD, PO BOX 1088, WEST PERTH, WA, 6872 and DTC :NORTH WEST STONE PTY LTD, STEVE MILLWARD, PO BOX 1088, WEST PERTH, WA, 6872, xxxxxxxx@alikabier.com, xxxxxxx398To:Principal Place of Business : NORTH WEST STONE PTY LTD, 36 METTAM STREET, TRIGG, WA, 6029 and DTC :NORTH WEST STONE PTY LTD, NEIL BOWIE, 36 METTAM STREET, TRIGG, WA, 6029, xxxxxxxxxxx@hotmail.com, xxxxxxxxx477RECORDED:12:03 13 August 2024 |