1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 12-Mar-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 12-Mar-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Mar-2019 | |
4 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 12-Mar-2019 | |
5 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 12-Mar-2019 | |
6 | 1 | No activities being carried out within the proposed railway corridor (designated FNA 9198) that interfere with or restrict any rail route investigation activities being undertaken by the rail line proponent. | 12-Mar-2019 | |
7 | 1 | No interference with Geodetic Survey Stations Mount Bruce 176, 177, 178, 178T, 179, 180, 220 and NMF 631 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 12-Mar-2019 | |
8 | 1 | No mining within 25 metres of either side of the petroleum pipeline licence area of 24 and to a depth of 50 metres being the Consultation Area as shown in TENGRAPH, without the mining tenement holder and the petroleum pipeline licensee consulting with each other and reaching agreement on access and mining activities to be undertaken within the Consultation Area. | 12-Mar-2019 | |
9 | 1 | No surface excavation approaching closer to the boundary of the Consultation Area than a distance equal to three times the depth of the excavation without the mining tenement holder and the petroleum pipeline licensee reaching agreement as to a lesser distance. | 12-Mar-2019 | |
10 | 1 | No explosives being used or stored within 150 metres of the petroleum licence area without the mining tenement holder and the petroleum pipeline licensee reaching agreement as to a lesser distance. | 12-Mar-2019 | |
11 | 1 | The rights of ingress to and egress from the petroleum pipeline licence area being at all times preserved for the employees, contractors and agents of the owners and operators of the pipeline. | 12-Mar-2019 | |
12 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purposes of protecting the pipeline and any existing condition imposed for this purpose may be cancelled or varied. | 12-Mar-2019 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 12-Mar-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 12-Mar-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Mar-2019 | |
4 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 12-Mar-2019 | |
5 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 12-Mar-2019 | |
6 | 1 | No activities being carried out within the proposed railway corridor (designated FNA 9198) that interfere with or restrict any rail route investigation activities being undertaken by the rail line proponent. | 12-Mar-2019 | |
7 | 1 | No interference with Geodetic Survey Stations Mount Bruce 176, 177, 178, 178T, 179, 180, 220 and NMF 631 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 12-Mar-2019 | |
8 | 1 | No mining within 25 metres of either side of the petroleum pipeline licence area of 24 and to a depth of 50 metres being the Consultation Area as shown in TENGRAPH, without the mining tenement holder and the petroleum pipeline licensee consulting with each other and reaching agreement on access and mining activities to be undertaken within the Consultation Area. | 12-Mar-2019 | |
9 | 1 | No surface excavation approaching closer to the boundary of the Consultation Area than a distance equal to three times the depth of the excavation without the mining tenement holder and the petroleum pipeline licensee reaching agreement as to a lesser distance. | 12-Mar-2019 | |
10 | 1 | No explosives being used or stored within 150 metres of the petroleum licence area without the mining tenement holder and the petroleum pipeline licensee reaching agreement as to a lesser distance. | 12-Mar-2019 | |
11 | 1 | The rights of ingress to and egress from the petroleum pipeline licence area being at all times preserved for the employees, contractors and agents of the owners and operators of the pipeline. | 12-Mar-2019 | |
12 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purposes of protecting the pipeline and any existing condition imposed for this purpose may be cancelled or varied. | 12-Mar-2019 | |
Type | Number | Details |
Forfeiture | 580146 | Initiated:19/06/2020 for non-compliance with reporting requirements( Form 5 )RECORDED:08:40 19 June 2020Notice Issued:Regulation 50 Notice sent 19/06/2020 for non-compliance with expenditure requirements pursuant to Reg 22/Sec 63A- non lodgement of Form 5.Compliance Date:27/07/2020FINALISED:Order by Minister on 19 August 2020 that E 08/2948 be No Penalty Imposed |
Forfeiture | 648782 | Initiated:11/05/2022 for non-compliance with rent requirementsRECORDED:08:39 11 May 2022Notice Issued:Regulation 50 Notice sent 11/05/2022 for non-compliance with rent requirements pursuant to Reg 109/Sec 63A- non payment of rent.Compliance Date:15/06/2022FINALISED:Order by Minister on 23 June 2022 that E 08/2948 be Penalty Imposed |
Fine | 652059 | Fine in respect to:Forfeiture Process 648782Fine reason:Non-compliance with rent obligationsPenalty amount:$352.00Notification date:29/06/2022Due date:03/08/2022Pursuant to:Section 96A(5)RECORDED:23 June 2022PAYMENT RECEIVED:07 July 2022FINALISED:07 July 2022Receipt Number:06-184301Amount:$352.00Remaining balance:$0.00 |
Forfeiture | 654391 | Initiated:27/07/2022 for non-compliance with reporting requirementsRECORDED:14:13:43 27 July 2022FINALISED:Order by Minister on 13 October 2022 that E 08/2948 be Penalty ImposedNotice Issued:Regulation 50 Notice sent 27/07/2022 for non-compliance with reporting requirements pursuant to Sec 115A.Compliance Date:31/08/2022 |
Fine | 661414 | Fine in respect to:Forfeiture Process 654391Fine reason:Non-compliance with mineral exploration reporting provisionsPenalty amount:$540.00Notification date:19/10/2022Due date:23/11/2022Pursuant to:Section 96A(5)RECORDED:19 October 2022PAYMENT RECEIVED:03 November 2022FINALISED:03 November 2022Receipt Number:10299866Amount:$540.00Remaining balance:$0.00 |
Extension / Renewal of Term | 698047 | Lodged:12:35 06 March 2024Applied For Period:5 YearsRECORDED:12:35 06 March 2024GRANTED:10 May 2024Granted Period:5 YearsTerm Extended To:11/03/2029 |
Partial Surrender - Compulsory | 727758 | Lodged:15:10 07 March 2025Section:Section 65 (3)Surrendered Blocks:HAMERSLEY RANGE 2557 n, o, p, q
HAMERSLEY RANGE 2558 l, m, v
HAMERSLEY RANGE 2629 c, d, h, j, k
HAMERSLEY RANGE 2630 y, z
HAMERSLEY RANGE 2631 l, v
HAMERSLEY RANGE 2703 bSurrendered Total:17 BL.REGISTERED:Midnight 11 March 2025Surrendered area to be released 08:30:00 31/03/2025 under Section 65 (3)Surrendered area released 08:30:00 31/03/2025 under Section 65 (3) |