Extracted from MTO on 15-Jul-2025 01:36,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 12-Mar-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 12-Mar-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Mar-2019 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 12-Mar-2019 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 12-Mar-2019 | |
| 1 | In respect to the area designated as CPL 34 in TENGRAPH the following conditions apply: | 12-Mar-2019 | |
6 | 1 | Prior to any ground-disturbing activity, as defined by the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety (DMIRS) the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Resource and Environmental Compliance, DMIRS. The program to include:
- maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
- the purpose, specifications and life of all proposed disturbances;
- proposals which may disturb any declared rare or geographically restricted flora and fauna; and
- techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
| 12-Mar-2019 | |
7 | 1 | The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Resource and Environmental Compliance, DMIRS. Such rehabilitation as is appropriate and may include:
- stockpiling and return of topsoil;
- backfilling all holes, trenches and costeans;
- ripping;
- contouring to the original landform;
- revegetation with seed; and
- capping and backfilling of all drill holes.
| 12-Mar-2019 | |
8 | 1 | Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMIRS and arranging an inspection as required. | 12-Mar-2019 | |
9 | 1 | No interference with Geodetic Survey Stations Blair, NMF 629, PW 10, PW 10T and ZT 72 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 12-Mar-2019 | |
10 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 12-Mar-2019 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 12-Mar-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 12-Mar-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Mar-2019 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 12-Mar-2019 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 12-Mar-2019 | |
| 1 | In respect to the area designated as CPL 34 in TENGRAPH the following conditions apply: | 12-Mar-2019 | |
6 | 1 | Prior to any ground-disturbing activity, as defined by the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety (DMIRS) the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Resource and Environmental Compliance, DMIRS. The program to include:
- maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
- the purpose, specifications and life of all proposed disturbances;
- proposals which may disturb any declared rare or geographically restricted flora and fauna; and
- techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
| 12-Mar-2019 | |
7 | 1 | The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Resource and Environmental Compliance, DMIRS. Such rehabilitation as is appropriate and may include:
- stockpiling and return of topsoil;
- backfilling all holes, trenches and costeans;
- ripping;
- contouring to the original landform;
- revegetation with seed; and
- capping and backfilling of all drill holes.
| 12-Mar-2019 | |
8 | 1 | Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMIRS and arranging an inspection as required. | 12-Mar-2019 | |
9 | 1 | No interference with Geodetic Survey Stations Blair, NMF 629, PW 10, PW 10T and ZT 72 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 12-Mar-2019 | |
10 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 12-Mar-2019 | |
Type | Number | Details |
Forfeiture | 580146 | Initiated:19/06/2020 for non-compliance with reporting requirements( Form 5 )RECORDED:08:40 19 June 2020Notice Issued:Regulation 50 Notice sent 19/06/2020 for non-compliance with expenditure requirements pursuant to Reg 22/Sec 63A- non lodgement of Form 5.Compliance Date:27/07/2020FINALISED:Order by Minister on 19 August 2020 that E 08/2947 be No Penalty Imposed |
Forfeiture | 648782 | Initiated:11/05/2022 for non-compliance with rent requirementsRECORDED:08:39 11 May 2022Notice Issued:Regulation 50 Notice sent 11/05/2022 for non-compliance with rent requirements pursuant to Reg 109/Sec 63A- non payment of rent.Compliance Date:15/06/2022FINALISED:Order by Minister on 23 June 2022 that E 08/2947 be Penalty Imposed |
Fine | 652058 | Fine in respect to:Forfeiture Process 648782Fine reason:Non-compliance with rent obligationsPenalty amount:$372.00Notification date:29/06/2022Due date:03/08/2022Pursuant to:Section 96A(5)RECORDED:23 June 2022PAYMENT RECEIVED:07 July 2022FINALISED:07 July 2022Receipt Number:06-184301Amount:$372.00Remaining balance:$0.00 |
Forfeiture | 654391 | Initiated:27/07/2022 for non-compliance with reporting requirementsRECORDED:14:13:43 27 July 2022FINALISED:Order by Minister on 13 October 2022 that E 08/2947 be Penalty ImposedNotice Issued:Regulation 50 Notice sent 27/07/2022 for non-compliance with reporting requirements pursuant to Sec 115A.Compliance Date:31/08/2022 |
Fine | 661413 | Fine in respect to:Forfeiture Process 654391Fine reason:Non-compliance with mineral exploration reporting provisionsPenalty amount:$180.00Notification date:19/10/2022Due date:23/11/2022Pursuant to:Section 96A(5)RECORDED:19 October 2022PAYMENT RECEIVED:03 November 2022FINALISED:03 November 2022Receipt Number:10299862Amount:$180.00Remaining balance:$0.00 |
Extension / Renewal of Term | 698046 | Lodged:12:35 06 March 2024Applied For Period:5 YearsRECORDED:12:35 06 March 2024GRANTED:10 May 2024Granted Period:5 YearsTerm Extended To:11/03/2029 |
Partial Surrender - Compulsory | 727759 | Lodged:15:10 07 March 2025Section:Section 65 (3)Surrendered Blocks:HAMERSLEY RANGE 2988 e
HAMERSLEY RANGE 2989 a, b, j, p, u, z
HAMERSLEY RANGE 2990 j, l, m, p, q, r, v, w
HAMERSLEY RANGE 2991 l
HAMERSLEY RANGE 3062 c, d, hSurrendered Total:19 BL.REGISTERED:Midnight 11 March 2025Surrendered area to be released 08:30:00 31/03/2025 under Section 65 (3)Surrendered area released 08:30:00 31/03/2025 under Section 65 (3) |