1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 01-Apr-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 01-Apr-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 01-Apr-2019 | |
4 | 1 | No interference with Geodetic Survey Station MICRO Q and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 01-Apr-2019 | |
| 1 | In respect to the area designated as CPL 44 in TENGRAPH the following conditions apply: | 01-Apr-2019 | |
5 | 1 | Prior to any ground-disturbing activity, as defined by the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety (DMIRS) the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Resource and Environmental Compliance, DMIRS. The program to include:
- maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
- the purpose, specifications and life of all proposed disturbances;
- proposals which may disturb any declared rare or geographically restricted flora and fauna; and
- techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
| 01-Apr-2019 | |
6 | 1 | The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Resource and Environmental Compliance, DMIRS. Such rehabilitation as is appropriate and may include:
- stockpiling and return of topsoil;
- backfilling all holes, trenches and costeans;
- ripping;
- contouring to the original landform;
- revegetation with seed; and
- capping and backfilling of all drill holes.
| 01-Apr-2019 | |
7 | 1 | Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMIRS and arranging an inspection as required. | 01-Apr-2019 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 01-Apr-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 01-Apr-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 01-Apr-2019 | |
4 | 1 | No interference with Geodetic Survey Station MICRO Q and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 01-Apr-2019 | |
| 1 | In respect to the area designated as CPL 44 in TENGRAPH the following conditions apply: | 01-Apr-2019 | |
5 | 1 | Prior to any ground-disturbing activity, as defined by the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety (DMIRS) the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Resource and Environmental Compliance, DMIRS. The program to include:
- maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
- the purpose, specifications and life of all proposed disturbances;
- proposals which may disturb any declared rare or geographically restricted flora and fauna; and
- techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
| 01-Apr-2019 | |
6 | 1 | The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Resource and Environmental Compliance, DMIRS. Such rehabilitation as is appropriate and may include:
- stockpiling and return of topsoil;
- backfilling all holes, trenches and costeans;
- ripping;
- contouring to the original landform;
- revegetation with seed; and
- capping and backfilling of all drill holes.
| 01-Apr-2019 | |
7 | 1 | Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMIRS and arranging an inspection as required. | 01-Apr-2019 | |
Type | Number | Details |
Application to Amend | 577334 | Lodged:09:09:49 06 May 2020Amending:Address (Including DTC Details)From:CRATONIX PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/-MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxx997To:CRATONIX PTY LTD, TODD RIVER METALS PTY LTD, PO BOX 1205, OSBORNE PARK, WA, 6916, xxxxxxxxxxxxxx@trrltd.com.au, xxxxx255RECORDED:09:09:49 06 May 2020 |
Application to Amend | 590541 | Lodged:11:58:16 17 November 2020Amending:Address (Including DTC Details)From:Principal Place of Business : CRATONIX PTY LTD, C/-MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxx997 and DTC :CRATONIX PTY LTD, TODD RIVER METALS PTY LTD, PO BOX 1205, OSBORNE PARK, WA, 6916, xxxxxxxxxxxxxx@trrltd.com.au, xxxxx255To:Principal Place of Business : CRATONIX PTY LTD, C/- WESTERN TENEMENT SERVICES, PO BOX 3285, EAST PERTH, WA, 6892, xxxxx@wts.net.au, xxxxxxxxx111 and DTC :CRATONIX PTY LTD, WESTERN TENEMENT SERVICES, C/- WESTERN TENEMENT SERVICES, PO BOX 3285, EAST PERTH, WA, 6892, xxxxx@wts.net.au, xxxxxxxxx111RECORDED:11:58:16 17 November 2020 |
Application to Amend | 664136 | Lodged:10:42:34 29 November 2022Amending:Address (Including DTC Details)From:Principal Place of Business : CRATONIX PTY LTD, C/- WESTERN TENEMENT SERVICES, PO BOX 3285, EAST PERTH, WA, 6892, xxxxx@wts.net.au, xxxxxxxxx111 and DTC :CRATONIX PTY LTD, WESTERN TENEMENT SERVICES, C/- WESTERN TENEMENT SERVICES, PO BOX 3285, EAST PERTH, WA, 6892, xxxxx@wts.net.au, xxxxxxxxx111To:Principal Place of Business : CRATONIX PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997 and DTC :CRATONIX PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997REJECTED:10:42:34 29 November 2022 |
Application to Amend | 668247 | Lodged:15:29:28 03 February 2023Amending:Address (Including DTC Details)From:Principal Place of Business : CRATONIX PTY LTD, C/- WESTERN TENEMENT SERVICES, PO BOX 3285, EAST PERTH, WA, 6892, xxxxx@wts.net.au, xxxxxxxxx111 and DTC :CRATONIX PTY LTD, WESTERN TENEMENT SERVICES, C/- WESTERN TENEMENT SERVICES, PO BOX 3285, EAST PERTH, WA, 6892, xxxxx@wts.net.au, xxxxxxxxx111To:Principal Place of Business : CRATONIX PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997 and DTC :CRATONIX PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997RECORDED:15:29:28 03 February 2023 |
Surrender - Outright | 697407 | Lodged:08:30 27 February 2024REGISTERED:08:30 27 February 2024 |