Extracted from MTO on 06-Jul-2025 01:36,
last changed 05-Jul-2025.
# | Ver | Text | Start | End |
1 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 19-May-2025 | |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 05-Jul-2018 | 18-May-2025 |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 05-Jul-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 05-Jul-2018 | |
4 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 05-Jul-2018 | |
5 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 05-Jul-2018 | |
6 | 1 | No interference with Geodetic Survey Station R 398 and R399 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 05-Jul-2018 | |
| 1 | In respect to the area designated as CPL 34 in TENGRAPH the following conditions apply: | 05-Jul-2018 | |
7 | 1 | Prior to any ground-disturbing activity, as defined by the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety (DMIRS) the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Resource and Environmental Compliance, DMIRS. The program to include:
- maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
- the purpose, specifications and life of all proposed disturbances;
- proposals which may disturb any declared rare or geographically restricted flora and fauna; and
- techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
| 05-Jul-2018 | |
8 | 1 | The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Resource and Environmental Compliance, DMIRS. Such rehabilitation as is appropriate and may include:
- stockpiling and return of topsoil;
- backfilling all holes, trenches and costeans;
- ripping;
- contouring to the original landform;
- revegetation with seed; and
- capping and backfilling of all drill holes.
| 05-Jul-2018 | |
9 | 1 | Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMIRS and arranging an inspection as required. | 05-Jul-2018 | |
10 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 19-May-2025 | |
11 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 19-May-2025 | |
12 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 19-May-2025 | |
Cond # | Ver | Text | Start | End |
1 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 19-May-2025 | |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 05-Jul-2018 | 18-May-2025 |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 05-Jul-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 05-Jul-2018 | |
4 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 05-Jul-2018 | |
5 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 05-Jul-2018 | |
6 | 1 | No interference with Geodetic Survey Station R 398 and R399 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 05-Jul-2018 | |
| 1 | In respect to the area designated as CPL 34 in TENGRAPH the following conditions apply: | 05-Jul-2018 | |
7 | 1 | Prior to any ground-disturbing activity, as defined by the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety (DMIRS) the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Resource and Environmental Compliance, DMIRS. The program to include:
- maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
- the purpose, specifications and life of all proposed disturbances;
- proposals which may disturb any declared rare or geographically restricted flora and fauna; and
- techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
| 05-Jul-2018 | |
8 | 1 | The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Resource and Environmental Compliance, DMIRS. Such rehabilitation as is appropriate and may include:
- stockpiling and return of topsoil;
- backfilling all holes, trenches and costeans;
- ripping;
- contouring to the original landform;
- revegetation with seed; and
- capping and backfilling of all drill holes.
| 05-Jul-2018 | |
9 | 1 | Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMIRS and arranging an inspection as required. | 05-Jul-2018 | |
10 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 19-May-2025 | |
11 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 19-May-2025 | |
12 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 19-May-2025 | |
Type | Number | Details |
Caveat | 635154 | Lodged:15:16:44 03 November 2021Caveat Type:Absolute CaveatCaveator:STROTHER, Dallas GailShares Caveated:50/100 shares FIRTH, John HarveyRECORDED:15:16:44 03 November 2021WITHDRAWN:09:33 12 October 2023 |
Plaint | 647244 | Lodged:15:25:03 13 April 2022Plaintiffs:ESTATE OF GARY RAYMOND STROTHER, Dallas Gail Strother As Executor Of TheRespondents:FIRTH, John Harvey, DIRECTOR GENERAL OF MINES, TheRECORDED:15:25:03 13 April 2022WITHDRAWN:10:00 12 January 2024Warden's Determination:Withdrawn 10:00 04 April 20231. The Plaint is withdrawn.
2. There is no order as to costs.
3. The hearing listed for 9 and 10 May 2023 is vacated.Warden:Cleary |
Excess Tonnage | 660849 | Lodged:12:18:32 11 October 2022RECORDED:12:18:32 11 October 2022GRANTED:16:39 04 November 2022Additional 68.9777 tonnes |
Excess Tonnage | 665168 | Lodged:11:09:04 12 December 2022RECORDED:11:09:04 12 December 2022GRANTED:12:23 23 December 2022Additional 69.03 tonnes |
Extension / Renewal of Term | 680195 | Lodged:15:06:16 04 July 2023Applied For Period:5 YearsRECORDED:15:06:16 04 July 2023GRANTED:07 September 2023Granted Period:5 YearsTerm Extended To:04/07/2028 |
Extension of Time | 681363 | Lodged:16:02:54 18 July 2023Type:OtherRECORDED:16:02:54 18 July 2023APPROVED:11:14:50 31 July 2023Time extended to lodge to 1 August 2023 |
Caveat | 683972 | Lodged:11:00 18 August 2023Caveat Type:Consent CaveatCaveator:STROTHER, Dallas GailShares Caveated:100/100 shares FIRTH, John HarveyRECORDED:11:00 18 August 2023 |
Extension of Time | 685340 | Lodged:15:56:13 05 September 2023Type:Form 5RECORDED:15:56:13 05 September 2023APPROVED:09:59:37 07 September 2023Time to lodge extended to COB 5 September 2023 |
Withdrawal of Dealing | 687730 | Lodged:09:33 12 October 2023In respect to:Caveat 635154RECORDED:09:33 12 October 2023 |
Excess Tonnage | 696130 | Lodged:11:45 09 February 2024RECORDED:11:45 09 February 2024Approved Additional Tonnes:86.85GRANTED:15:58:21 03 May 2024 |
Application to Amend | 713941 | Lodged:14:47:47 03 September 2024Amending:Address (Including DTC Details)From:Principal Residence : FIRTH, John Harvey, C/- WESTERN TENEMENT SERVICES, PO BOX 3285, EAST PERTH, WA, 6892, xxxxx@wts.net.au, xxxxxxx111 and DTC :FIRTH, John Harvey, WESTERN TENEMENT SERVICES, C/- WESTERN TENEMENT SERVICES, PO BOX 3285, EAST PERTH, WA, 6892, xxxxx@wts.net.au, xxxxxxx111To:Principal Residence : FIRTH, John Harvey, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997 and DTC :FIRTH, John Harvey, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997RECORDED:14:47:47 03 September 2024 |
Excess Tonnage | 718659 | Lodged:08:32 31 October 2024RECORDED:08:32 31 October 2024Approved Additional Tonnes:14,598.98GRANTED:13:48:25 15 November 2024 |
Caveat | 726336 | Lodged:11:23:45 20 February 2025Caveat Type:Consent CaveatCaveator:GARDNER MINING PTY LTDShares Caveated:100/100 shares FIRTH, John HarveyRECORDED:11:23:45 20 February 2025 |