1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 13-Feb-2018 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 13-Feb-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 13-Feb-2018 | |
4 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on area shown as FNA 8971 in Tengraph. | 13-Feb-2018 | |
5 | 1 | No interference with Geodetic Survey Station MRD 16 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 13-Feb-2018 | |
6 | 1 | No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within Petroleum Pipeline Licence No 87 as shown in TENGRAPH. | 13-Feb-2018 | |
7 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 6 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMIRS | 13-Feb-2018 | |
8 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 6 hereof without the prior approval of the operators of the Gas/Petroleum pipeline. | 13-Feb-2018 | |
9 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 6 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMIRS | 13-Feb-2018 | |
10 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director Petroleum DMIRS . | 13-Feb-2018 | |
11 | 1 | Mining on the Safety Zone established in Condition 6 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMIRS . | 13-Feb-2018 | |
12 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 6 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline. | 13-Feb-2018 | |
13 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline. | 13-Feb-2018 | |
| 1 | In respect to the area designated as CPL 38 in TENGRAPH the following conditions apply: | 13-Feb-2018 | |
14 | 1 | Prior to any ground-disturbing activity, as defined by the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety (DMIRS) the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Resource and Environmental Compliance, DMIRS. The program to include:
- maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
- the purpose, specifications and life of all proposed disturbances;
- proposals which may disturb any declared rare or geographically restricted flora and fauna; and
- techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
| 13-Feb-2018 | |
15 | 1 | The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Resource and Environmental Compliance, DMIRS. Such rehabilitation as is appropriate and may include:
- stockpiling and return of topsoil;
- backfilling all holes, trenches and costeans;
- ripping;
- contouring to the original landform;
- revegetation with seed; and
- capping and backfilling of all drill holes.
| 13-Feb-2018 | |
16 | 1 | Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMIRS and arranging an inspection as required. | 13-Feb-2018 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 13-Feb-2018 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 13-Feb-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 13-Feb-2018 | |
4 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on area shown as FNA 8971 in Tengraph. | 13-Feb-2018 | |
5 | 1 | No interference with Geodetic Survey Station MRD 16 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 13-Feb-2018 | |
6 | 1 | No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within Petroleum Pipeline Licence No 87 as shown in TENGRAPH. | 13-Feb-2018 | |
7 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 6 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMIRS | 13-Feb-2018 | |
8 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 6 hereof without the prior approval of the operators of the Gas/Petroleum pipeline. | 13-Feb-2018 | |
9 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 6 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMIRS | 13-Feb-2018 | |
10 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director Petroleum DMIRS . | 13-Feb-2018 | |
11 | 1 | Mining on the Safety Zone established in Condition 6 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMIRS . | 13-Feb-2018 | |
12 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 6 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline. | 13-Feb-2018 | |
13 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline. | 13-Feb-2018 | |
| 1 | In respect to the area designated as CPL 38 in TENGRAPH the following conditions apply: | 13-Feb-2018 | |
14 | 1 | Prior to any ground-disturbing activity, as defined by the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety (DMIRS) the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Resource and Environmental Compliance, DMIRS. The program to include:
- maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
- the purpose, specifications and life of all proposed disturbances;
- proposals which may disturb any declared rare or geographically restricted flora and fauna; and
- techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
| 13-Feb-2018 | |
15 | 1 | The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Resource and Environmental Compliance, DMIRS. Such rehabilitation as is appropriate and may include:
- stockpiling and return of topsoil;
- backfilling all holes, trenches and costeans;
- ripping;
- contouring to the original landform;
- revegetation with seed; and
- capping and backfilling of all drill holes.
| 13-Feb-2018 | |
16 | 1 | Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMIRS and arranging an inspection as required. | 13-Feb-2018 | |
Type | Number | Details |