Extracted from MTO on 25-Jun-2022 04:51,
last changed 18-Jun-2022.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 19-Jul-2018 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 19-Jul-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 19-Jul-2018 | |
4 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 19-Jul-2018 | |
5 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 19-Jul-2018 | |
6 | 1 | No activities being carried out within the proposed railway corridor (designated FNA 9198 ) that interfere with or restrict any rail route investigation activities being undertaken by the rail line proponent. | 19-Jul-2018 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 19-Jul-2018 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 19-Jul-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 19-Jul-2018 | |
4 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 19-Jul-2018 | |
5 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 19-Jul-2018 | |
6 | 1 | No activities being carried out within the proposed railway corridor (designated FNA 9198 ) that interfere with or restrict any rail route investigation activities being undertaken by the rail line proponent. | 19-Jul-2018 | |
Type | Number | Details |
Application to Amend | 552621 | Lodged:11:02:17 01 May 2019Amending:NameFrom:ATLAS IRON LIMITEDTo:ATLAS IRON PTY LTDRECORDED:11:02:17 01 May 2019 |
Forfeiture | 567334 | Initiated:13/11/2019 for non-compliance with expenditure conditionsRECORDED:13:30 25 November 2019Notice Issued:Regulation 50 Notice sent 13/11/2019 for non-compliance with expenditure conditions pursuant to Reg 15.Compliance Date:18/12/2019FINALISED:Order by Minister on 13 January 2020 that E 08/2928 be Penalty Imposed |
Fine | 570035 | Fine in respect to:Forfeiture Process 567334Fine reason:Non-compliance with expenditure obligationsPenalty amount:$1,335.00Notification date:15/01/2020Due date:19/02/2020Pursuant to:Section 96A(5)RECORDED:15 January 2020PAYMENT RECEIVED:17 February 2020FINALISED:17 February 2020Receipt Number:06-173970Amount:$1,335.00Remaining balance:$0.00 |
Forfeiture | 592215 | Initiated:23/11/2020 for non-compliance with expenditure conditionsRECORDED:10:59 11 December 2020Notice Issued:Regulation 50 Notice sent 23/11/2020 for non-compliance with expenditure conditions pursuant to Reg 15.Compliance Date:04/01/2021FINALISED:Order by Minister on 12 January 2021 that E 08/2928 be Penalty Imposed |
Fine | 593725 | Fine in respect to:Forfeiture Process 592215Fine reason:Non-compliance with expenditure obligationsPenalty amount:$2,665.00Notification date:14/01/2021Due date:18/02/2021Pursuant to:Section 96A(5)RECORDED:13 January 2021PAYMENT RECEIVED:15 February 2021FINALISED:15 February 2021Receipt Number:10183396Amount:$2,665.00Remaining balance:$0.00 |
Forfeiture | 637210 | Initiated:22/11/2021 for non-compliance with expenditure conditionsRECORDED:10:07:02 17 December 2021Notice Issued:Regulation 50 Notice sent 22/11/2021 for non-compliance with expenditure conditions pursuant to Reg 15.Compliance Date:27/12/2021FINALISED:Order by Minister on 28 April 2022 that E 08/2928 be Penalty Imposed |
Fine | 648488 | Fine in respect to:Forfeiture Process 637210Fine reason:Non-compliance with expenditure obligationsPenalty amount:$5,000.00Notification date:05/05/2022Due date:09/06/2022Pursuant to:Section 96A(5)RECORDED:05 May 2022PAYMENT RECEIVED:08 June 2022FINALISED:09 June 2022Receipt Number:10267795Amount:$5,000.00Remaining balance:$0.00 |