Extracted from MTO on 12-Apr-2021 03:58,
last changed 08-Dec-2020.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 24-May-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 24-May-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 24-May-2017 | |
4 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 24-May-2017 | |
5 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 24-May-2017 | |
| 1 | Consent to explore on De Grey Mullewa Stock Route Reserve 9701 granted subject to the following condition: | 24-May-2017 | |
6 | 1 | No exploration activities being carried out on De Grey Mullewa Stock Route Reserve 9701 which restrict the use of the reserve. | 24-May-2017 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 24-May-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 24-May-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 24-May-2017 | |
4 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 24-May-2017 | |
5 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 24-May-2017 | |
| 1 | Consent to explore on De Grey Mullewa Stock Route Reserve 9701 granted subject to the following condition: | 24-May-2017 | |
6 | 1 | No exploration activities being carried out on De Grey Mullewa Stock Route Reserve 9701 which restrict the use of the reserve. | 24-May-2017 | |
Type | Number | Details |
Partial Surrender - Voluntary | 530486 | Lodged:11:46:26 17 May 2018Surrendered Blocks:HAMERSLEY RANGE 2540 n, p, s, t, u, z
HAMERSLEY RANGE 2541 q, s, t, u, v, w, x, y
HAMERSLEY RANGE 2612 c, h, j, k, o, p, t, u, z
HAMERSLEY RANGE 2613 b, c, g, h, l, m, n, q, rSurrendered Total:32 BL.REGISTERED:11:46:26 17 May 2018 |
Caveat | 546489 | Lodged:12:31:46 23 January 2019Caveat Type:Consent CaveatCaveator:OLYNTHOS GROUP PTY LTDShares Caveated:100/100 shares PILBARA STONE PTY LTDRECORDED:12:31:46 23 January 2019WITHDRAWN:14:50:41 07 April 2020 |
Withdrawal of Dealing | 575662 | Lodged:14:50:41 07 April 2020In respect to:Caveat 546489RECORDED:14:50:41 07 April 2020 |