Tenement: E08-2904

View on Landtracker Maps (logon required)

Extracted from MTO on 27-Jun-2025 00:31, last changed 27-Jun-2025.

Tenement Summary

Identifier:E 08/2904Type:Exploration Licence
Status:DeadDistrict:ASHBURTON M.F.
Lodged:ONLINEArea:194 BL
Purposes:Term:5 Years
Markout:Received:10-Feb-2017 13:35
Commence:10-Oct-2017 Expiry:09-Oct-2022

Holders

Company NameSharesTotal Shares
AUSQUEST LIMITED100100

Applicants on Receival

Company NameSharesTotal Shares
AUSQUEST LIMITED100100

Shires

Shire NameShire NumberStartArea
ASHBURTON SHIRE25010-Feb-2017 116.00000 BL
UPPER GASCOYNE SHIRE847010-Feb-2017 78.00000 BL

Conditions

#VerTextStartEnd
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS.10-Oct-2017
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.10-Oct-2017
31Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.10-Oct-2017
41The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.10-Oct-2017
51The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the licence; or
  • registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
10-Oct-2017
61No interference with Geodetic Survey Station Edmund 13 and Edmund 14 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.10-Oct-2017
1In respect to the area designated as CPL 34 in TENGRAPH the following conditions apply:10-Oct-2017
71Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, Department of Mines, Industry Regulation and Safety (DMIRS) the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMIRS. The program to include:
  • maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
  • the purpose, specifications and life of all proposed disturbances;
  • proposals which may disturb any declared rare or geographically restricted flora and fauna; and
  • techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
10-Oct-2017
81The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMIRS. Such rehabilitation as is appropriate and may include:
  • stockpiling and return of topsoil;
  • backfilling all holes, trenches and costeans;
  • ripping;
  • contouring to the original landform;
  • revegetation with seed; and
  • capping and backfilling of all drill holes.
10-Oct-2017
91Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMIRS and arranging an inspection as required.10-Oct-2017

Endorsements

Cond #VerTextStartEnd
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS.10-Oct-2017
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.10-Oct-2017
31Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.10-Oct-2017
41The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.10-Oct-2017
51The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the licence; or
  • registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
10-Oct-2017
61No interference with Geodetic Survey Station Edmund 13 and Edmund 14 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.10-Oct-2017
1In respect to the area designated as CPL 34 in TENGRAPH the following conditions apply:10-Oct-2017
71Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, Department of Mines, Industry Regulation and Safety (DMIRS) the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMIRS. The program to include:
  • maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
  • the purpose, specifications and life of all proposed disturbances;
  • proposals which may disturb any declared rare or geographically restricted flora and fauna; and
  • techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
10-Oct-2017
81The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMIRS. Such rehabilitation as is appropriate and may include:
  • stockpiling and return of topsoil;
  • backfilling all holes, trenches and costeans;
  • ripping;
  • contouring to the original landform;
  • revegetation with seed; and
  • capping and backfilling of all drill holes.
10-Oct-2017
91Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMIRS and arranging an inspection as required.10-Oct-2017

Dealings

TypeNumberDetails
Extension of Time502525Lodged:08:30 14 March 2017Type:Service on PastoralistRECORDED:08:30 14 March 2017WITHDRAWN:10:40:45 22 March 2017
Extension of Time502526Lodged:08:30 14 March 2017Type:Service on PastoralistRECORDED:08:30 14 March 2017WITHDRAWN:10:39:48 22 March 2017
Extension of Time502991Lodged:15:45:19 21 March 2017Type:Service on PastoralistRECORDED:15:45:19 21 March 2017APPROVED:11:08 23 March 2017
Surrender - Outright547757Lodged:12:07:38 14 February 2019REGISTERED:12:07:38 14 February 2019

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental201905-Oct-2018 3574767582$26,384.00194 BL10-Oct-2017 $26,384.00$0.00
Rental201810-Feb-2017 71086287325$25,123.00194 BL10-Oct-2017 $25,123.00$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2019$80,834.0012-Mar-2019 $55,256.80$7,259.88$0.00$0.00$44,385.44$3,611.48$0.00false
2018$194,000.0031-Oct-2018 $99,493.9854172631-Oct-2018 $94,506.02Granted06-Dec-2018 $48,115.88$0.00$0.00$38,056.22$13,321.88$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
02-May-2017 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2017-05-172017-09-17CLEARED - Expedited Applies2017-10-06194 BL233029S1163530E116km W'ly of ParaburdooWO2017/03662017-05-19WC1997/095Objection Withdrawn Agreement2017-06-15THUDGARI PEOPLE(WCD2009/002)WC1997/095WAD6212/1998falseWCD2009/002131EXISTYesJurruru People Part A(WCD2015/002)WC2000/008WAD6007/2000falseWCD2015/002EXISTNoJurruru People #3(WC2016/001)WC2016/001WAD62/2016falseDeterminedCombined Thiin-Mah Warriyangka, Tharrkari, Jiwarli(WC2016/003)WC2016/003WAD464/2016falseDetermined14GeraldtonYamatji Marlpa Aboriginal Corporation11Central DesertCentral Desert Native Title Services