Extracted from MTO on 06-Jul-2025 00:43,
last changed 27-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 11-Jan-2018 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 11-Jan-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 11-Jan-2018 | |
4 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 11-Jan-2018 | |
5 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 11-Jan-2018 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 11-Jan-2018 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 11-Jan-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 11-Jan-2018 | |
4 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 11-Jan-2018 | |
5 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 11-Jan-2018 | |
Type | Number | Details |
Forfeiture | 579756 | Initiated:15/06/2020 for non-compliance with reporting requirementsRECORDED:12:30 15 June 2020FINALISED:Order by Minister on 09 October 2020 that E 08/2897 be Penalty ImposedNotice Issued:Regulation 50 Notice sent 15/06/2020 for non-compliance with reporting requirements pursuant to Sec 115A.Compliance Date:21/07/2020 |
Fine | 587999 | Fine in respect to:Forfeiture Process 579756Fine reason:Non-compliance with mineral exploration reporting provisionsPenalty amount:$60.00Notification date:02/11/2020Due date:07/12/2020Pursuant to:Section 96A(5)RECORDED:09 October 2020PAYMENT RECEIVED:10 November 2020FINALISED:10 November 2020Receipt Number:01-036939Amount:$60.00Remaining balance:$0.00 |
Surrender - Outright | 622335 | Lodged:08:34:10 13 May 2021REGISTERED:08:34:10 13 May 2021 |
Referred to Native Title Date | Referral Type | Current Status | Procedure | Details | Objections | Water Comments | Determination Areas | Claims | Representative Area Bodies |
14-Mar-2017 | Tenement Application | Expedited Procedure : Native Title Cleared - Expedited Applies | Expedited Procedure | 2017-04-052017-08-05CLEARED - Expedited Applies2018-01-1017 BL23240S116220E136km W'ly of Paraburdoo | WO2017/02192017-04-07WC1997/095Objection Withdrawn2017-10-19WO2017/05482017-08-01WC2016/003Objection Withdrawn Agreement2017-12-13WO2017/05492017-08-01WC2016/001Objection Withdrawn Agreement2018-01-10 | | THUDGARI PEOPLE(WCD2009/002)WC1997/095WAD6212/1998falseWCD2009/002131EXISTYes | Jurruru People #3(WC2016/001)WC2016/001WAD62/2016falseDeterminedCombined Thiin-Mah Warriyangka, Tharrkari, Jiwarli(WC2016/003)WC2016/003WAD464/2016falseDetermined | 14GeraldtonYamatji Marlpa Aboriginal Corporation |