Tenement: E08-2886

View on Landtracker Maps (logon required)

Extracted from MTO on 10-Jul-2025 00:20, last changed 01-Jul-2025.

Tenement Summary

Identifier:E 08/2886Type:Exploration Licence
Status:DeadDistrict:ASHBURTON M.F.
Lodged:ONLINEArea:13 BL
Purposes:Term:5 Years
Markout:Received:07-Nov-2016 11:55
Commence:07-May-2018 Expiry:06-May-2023

Holders

Company NameSharesTotal Shares
BELLARY DOME PTY LTD100100

Applicants on Receival

Company NameSharesTotal Shares
COCCINELLA PTY LTD100100

Shires

Shire NameShire NumberStartArea
ASHBURTON SHIRE25007-Nov-2016 13.00000 BL

Conditions

#VerTextStartEnd
11All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.07-May-2018
21Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.07-May-2018
31The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.07-May-2018
41The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the licence; or
  • registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
07-May-2018
51No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within Petroleum Pipeline Licence No 24 as shown in TENGRAPH.07-May-2018
61No surface excavation approaching closer to the boundary of the Safety Zone established by condition 5 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMIRS07-May-2018
71No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 5 hereof without the prior approval of the operators of the Gas/Petroleum pipeline.07-May-2018
81The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 5 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMIRS.07-May-2018
91No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director Petroleum DMIRS.07-May-2018
101Mining on the Safety Zone established in Condition 5 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMIRS.07-May-2018
111The rights of ingress to and egress from the pipeline easement established in Condition 5 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline.07-May-2018
121Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline.07-May-2018
131All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety.02-Oct-2020

Endorsements

Cond #VerTextStartEnd
11All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.07-May-2018
21Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.07-May-2018
31The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.07-May-2018
41The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the licence; or
  • registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
07-May-2018
51No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within Petroleum Pipeline Licence No 24 as shown in TENGRAPH.07-May-2018
61No surface excavation approaching closer to the boundary of the Safety Zone established by condition 5 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMIRS07-May-2018
71No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 5 hereof without the prior approval of the operators of the Gas/Petroleum pipeline.07-May-2018
81The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 5 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMIRS.07-May-2018
91No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director Petroleum DMIRS.07-May-2018
101Mining on the Safety Zone established in Condition 5 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMIRS.07-May-2018
111The rights of ingress to and egress from the pipeline easement established in Condition 5 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline.07-May-2018
121Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline.07-May-2018
131All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety.02-Oct-2020

Dealings

TypeNumberDetails
Surrender - Outright596012Lodged:11:58:37 16 February 2021REGISTERED:11:58:37 16 February 2021

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202107-May-2020 10143660$1,794.0013 BL07-May-2018 $1,794.00$0.00
Rental202007-Jun-2019 10099817$1,768.0013 BL07-May-2018 $1,768.00$0.00
Rental201907-Nov-2016 68401413529$1,683.5013 BL07-May-2018 $1,683.50$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2021$16,667.0005-Mar-2021 $4,239.68$110.00$0.00$0.00$1,794.00$2,335.68$0.00false
2020$20,000.0003-Jul-2020 $22,474.00$16,391.00$0.00$0.00$3,402.00$2,681.00$0.00false
2019$20,000.0005-Jul-2019 $22,464.00$17,129.00$0.00$0.00$3,293.00$2,042.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
17-Jan-2017 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2017-02-082017-06-08CLEARED - Expedited Applies2018-04-3013 BL2360S117140E47km W'ly of ParaburdooWO2017/03192017-05-09WC2000/008Objection Withdrawn No Agreement2017-07-09WO2017/03182017-05-09WC2010/016Objection Withdrawn Agreement2018-04-26WO2017/03202017-05-09WC2010/011Objection Withdrawn Agreement2018-04-26Yinhawangka Part A(WC2010/016)WC2010/016WAD340/2010falseDeterminedYinhawangka Part B(WC2010/011)WC2010/011WAD216/2010falseDeterminedJurruru People #1 (Part B)(WC2000/008)WC2000/008WAD6007/2000falseDetermined12PilbaraYamatji Marlpa Aboriginal Corporation