# | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 07-May-2018 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 07-May-2018 | |
3 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 07-May-2018 | |
4 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 07-May-2018 | |
5 | 1 | No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within Petroleum Pipeline Licence No 24 as shown in TENGRAPH. | 07-May-2018 | |
6 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 5 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMIRS | 07-May-2018 | |
7 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 5 hereof without the prior approval of the operators of the Gas/Petroleum pipeline. | 07-May-2018 | |
8 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 5 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMIRS. | 07-May-2018 | |
9 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director Petroleum DMIRS. | 07-May-2018 | |
10 | 1 | Mining on the Safety Zone established in Condition 5 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMIRS. | 07-May-2018 | |
11 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 5 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline. | 07-May-2018 | |
12 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline. | 07-May-2018 | |
13 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 02-Oct-2020 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 07-May-2018 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 07-May-2018 | |
3 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 07-May-2018 | |
4 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 07-May-2018 | |
5 | 1 | No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within Petroleum Pipeline Licence No 24 as shown in TENGRAPH. | 07-May-2018 | |
6 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 5 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMIRS | 07-May-2018 | |
7 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 5 hereof without the prior approval of the operators of the Gas/Petroleum pipeline. | 07-May-2018 | |
8 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 5 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMIRS. | 07-May-2018 | |
9 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director Petroleum DMIRS. | 07-May-2018 | |
10 | 1 | Mining on the Safety Zone established in Condition 5 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMIRS. | 07-May-2018 | |
11 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 5 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline. | 07-May-2018 | |
12 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline. | 07-May-2018 | |
13 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 02-Oct-2020 | |
Type | Number | Details |
Surrender - Outright | 596012 | Lodged:11:58:37 16 February 2021REGISTERED:11:58:37 16 February 2021 |