Extracted from MTO on 30-Jun-2025 00:55,
last changed 30-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 25-May-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 25-May-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 25-May-2017 | |
4 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 25-May-2017 | |
5 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 25-May-2017 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 25-May-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 25-May-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 25-May-2017 | |
4 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 25-May-2017 | |
5 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 25-May-2017 | |
Type | Number | Details |
Forfeiture | 540892 | Initiated:01/10/2018 for non-compliance with expenditure conditionsRECORDED:14:00 18 October 2018Notice Issued:Regulation 50 Notice sent 01/10/2018 for non-compliance with expenditure conditions pursuant to Reg 15.Compliance Date:05/11/2018FINALISED:Order by Minister on 12 December 2018 that E 08/2880 be Penalty Imposed |
Fine | 544507 | Fine in respect to:Forfeiture Process 540892Fine reason:Non-compliance with expenditure obligationsPenalty amount:$1,637.00Notification date:12/12/2018Due date:16/01/2019Pursuant to:Section 96A(5)RECORDED:12 December 2018PAYMENT RECEIVED:20 December 2018FINALISED:21 December 2018Receipt Number:10080680Amount:$1,637.00Remaining balance:$0.00 |
Application to Amend | 574870 | Lodged:13:30 25 March 2020Amending:Address (Including DTC Details)From:Principal Place of Business : ACN 603 462 513 PTY LTD, "L1" SE2, 1 ALTONA STREET, WEST PERTH, WA, 6005 and DTC :ACN 603 462 513 PTY LTD, ACN 603 462 513 PTY LTD, "L1" SE2, 1 ALTONA STREET, WEST PERTH, WA, 6005To:Principal Place of Business : ACN 603 462 513 PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxxxxxx997 and DTC :ACN 603 462 513 PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxxxxxx997RECORDED:13:30 25 March 2020 |
Extension / Renewal of Term | 648883 | Lodged:14:23:08 10 May 2022Applied For Period:5 YearsRECORDED:14:23:08 10 May 2022GRANTED:14 July 2022Granted Period:5 YearsTerm Extended To:24/05/2027 |
Surrender - Outright | 676326 | Lodged:11:38:23 18 May 2023REGISTERED:11:38:23 18 May 2023 |